Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jun 28, 2017 23:13:12 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jun 28, 2017 23:13:12 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Bhiwani*^
Page#    429 Blog Entries  next>>
  
General Travel
0 Followers
164 views
Jun 16 2017 (14:39)  

Bhiwani*^   537 blog posts   198 correct pred (76% accurate)
Entry# 2322756            Tags   Past Edits
hi What is the cancellation charges of the conform ticket

  
163 views
Jun 16 2017 (14:41)
SriramSN~   1077 blog posts   544 correct pred (70% accurate)
Re# 2322756-1            Tags   Past Edits
Follow this link - refund rules click here
  
Rail News
0 Followers
299 views
New Facilities/TechnologyNWR/North Western  -  
Jun 10 2017 (11:23)   हिसार-बठिंडा रेलवे ट्रैक का भी होगा विद्युतीकरण, सफर का आधा घंटा बचेगा

Bhiwani*^   3627 news posts
Entry# 2315025   News Entry# 304920         Tags   Past Edits
हिसार.हिसार से रेवाड़ी के अलावा हिसार से बठिंडा तक भी जल्द ही इलेक्ट्रिक ट्रेनों में सफर करने की सुविधा मिल सकेगी। रेलवे की सेंट्रल आर्गेनाइजेशन फॉर रेलवे इलेक्ट्रिफिकेशन (सीओआरई) की ओर से हिसार से बठिंडा के बीच 157 किलोमीटर लंबे ट्रैक पर इलेक्ट्रिफिकेशन का कार्य शुरू किया है। इसके लिए सबसे पहले हिसार से जाखोद के बीच रेलवे ट्रैक पर स्लैब निर्माण के लिए स्वाइन टेस्टिंग (मिट्टी जांच) का काम शुरू किया है। स्वाइन टेस्टिंग के बाद रेलवे ट्रैक के दोनों ओर बिजली के खंभों के लिए स्लैब बनाने का कार्य किया जाएगा। इसके बाद बिजली के खंभे लगाने व उन पर वायर लगाने का काम होगा। हिसार से बठिंडा के बीच रेलवे लाइन का इलेक्ट्रिफिकेशन होने से रेवाड़ी से सीधे बठिंडा तक इलेक्ट्रिक ट्रेनों में सफर किया जा सकेगा।
रेवाड़ी
...
more...
से बठिंडा तक चल पाएंगी इलेक्ट्रिक ट्रेनें
हिसार से बठिंडा रेलवे लाइन का इलेक्ट्रिफिकेशन होने व रेवाड़ी से हिसार के बीच इलेक्ट्रिफिकेशन का कार्य पूरा होने के बाद रेवाड़ी से सीधे बठिंडा तक इलेक्ट्रिक ट्रेनें चलाई जा सकेंगी। रेवाड़ी से बठिंडा तक 299 किलोमीटर लंबा रेलवे ट्रैक है। इसके अलावा रोहतक से भिवानी लाइन का इलेक्ट्रिफिकेशन का कार्य पूरा होने के बाद दिल्ली से भी बठिंडा तक इलेक्ट्रिक ट्रेनों में सफर किया जा सकेगा।
हिसार से बठिंडा तक 20 स्टेशन
हिसार से बठिंडा के बीच सात रेलगाड़ियां चलती हैं। छोटे-बड़े स्टेशन व हाॅल्ट को मिलाकर करीब 20 स्टेशन बठिंडा तक आते हैं। इनमें हिसार से न्योलीकलां, जाखोद खेड़ा, मंडी आदमपुर, भट्टू, सुचान कोटली, सिरसा, कालांवाली, रतनगढ़ खनकवाल, रामां, बंगी, शेरगढ़ जैसे मुख्य स्टेशनों से होते हुए ट्रेन बठिंडा जंक्शन पहुंचती है। 157 किलोमीटर की दूरी के अनुसार हिसार से बठिंडा का सफर करीब 2 घंटे 35 मिनट का है।
इलेक्ट्रिक ट्रेनों के इंजन जल्द पकड़ते हैं रफ्तार: हिसार से बठिंडा के बीच इलेक्ट्रिक ट्रेनें शुरू होने से 157 किलोमीटर के सफर को करीब आधा घंटा पहले पूरा किया जा सकेगा। क्योंकि इलेक्ट्रिक इंजन, डीजल इंजनों की अपेक्षा जल्द ही रफ्तार पकड़ लेते हैं। वहीं डीजल इंजन इलेक्ट्रिक इंजन की अपेक्षा रफ्तार पकड़ने में समय लेते हैं। इलेक्ट्रिक लाइन का कार्य पूरा होने के बाद इस ट्रैक पर करीब 100 किलोमीटर प्रतिघंटा की रफ्तार से ट्रेनें दौड़ाई जा सकेंगी। जिससे हिसार से बठिंडा के सफर को करीब आधा घंटे पहले पूरा हो जाएगा।
रेवाड़ी से हिसार का कार्य इस वर्ष हो जाएगा पूरा
रेवाड़ी से हिसार तक बनाई जा रही इलेक्ट्रिफिकेशन लाइन का कार्य इस वर्ष पूरा हो जाएगा। रेवाड़ी से हिसार के बीच बनाई जा रही इलेक्ट्रिक लाइन का कार्य सातरोड़ तक पूरा कर लिया है। इलेक्ट्रिफिकेशन के प्रोजेक्ट के तहत सातरोड में सब स्टेशन बनाने का कार्य भी काफी हद तक पूरा हो चुका है। सातरोड में इलेक्ट्रिफिकेशन का कार्य पूरा होने के बाद सातरोड से हिसार के बीच रेलवे इलेक्ट्रिफिकेशन का कार्य शुरू किया जाएगा। 90 करोड़ के इस प्रोजेक्ट में रेवाड़ी से मानहेरू, मानहेरू से हांसी व हांसी से हिसार के बीच में तीन चरणों में कार्य किया गया है। रेवाड़ी से हिसार इलेक्ट्रिक लाइन के प्रोजेक्ट मैनेजर आरए फड़के के अनुसार हिसार तक इलेक्ट्रिफिकेशन करने का कार्य सितंबर महीने तक पूरा करने का टारगेट रखा गया था। लेकिन सातरोड सब स्टेशन में कार्य में हो रही देरी के कारण यह प्रोजेक्ट अब दिसंबर माह तक पूरा हो पाएगा।

  
853 views
Jun 10 2017 (15:51)
a2z~   1243 blog posts
Re# 2315025-1            Tags   Past Edits
Hisar-Bhatinda is 158 km and is done in 2:30 hrs & 3:00(may be slack time) by express train.
Electrification cannot save half an hour unless the track is upgraded to enable train operation at higher speed.

1 posts are hidden.
  
★★★  Info Update
1 Followers
38941 views
May 20 2015 (09:36)   BNW/Bhiwani Junction (3 PFs)

Bhiwani*^   537 blog posts   198 correct pred (76% accurate)
Entry# 1476321            Tags   Past Edits
Rewari Bhiwani Hisar Double and Electrification work Pic , eatrh work of Double line is 75-80% done upto Manheru and Poles are also reached at almost all station and upto Jharli
Pic taken on 15 May 2015

4 posts - May 2015

4 posts - Jun 2015

5 posts - Jul 2015

9 posts - Aug 2015

3 posts - Sep 2015

10 posts - Oct 2015

3 posts - Nov 2015

4 posts - Dec 2015

5 posts - Jan 2016

14 posts - Feb 2016

3 posts - Mar 2016

4 posts - Jun 2016

4 posts - Jul 2016

1 posts - Sep 2016

6 posts - Oct 2016

4 posts - Nov 2016

17 posts - Dec 2016

1 posts - Jan 2017

3 posts - Feb 2017

3 posts - Thu Mar 09, 2017

  
2163 views
Mar 09 2017 (16:18)
Bhiwani*^   537 blog posts   198 correct pred (76% accurate)
Re# 1476321-111            Tags   Past Edits
ys

  
2988 views
Mar 09 2017 (16:21)
bti jhl without cross~   377 blog posts   5 correct pred (88% accurate)
Re# 1476321-112            Tags   Past Edits
wht abt doubling of rewaei to hisar & wch train is operated electric from rewaei to kosli

  
2868 views
Apr 04 2017 (11:38)
Bhiwani*^   537 blog posts   198 correct pred (76% accurate)
Re# 1476321-113            Tags   Past Edits
Update of Rewari -Bhiwani - Hisar #electrification

3 posts are hidden.

  
★  
2383 views
May 02 2017 (10:22)
Bhiwani*^   537 blog posts   198 correct pred (76% accurate)
Re# 1476321-117            Tags   Past Edits
Update as on 1/05/2017 : Rewari-Bhiwani-Hisar#Doubling#Electrifcation
#Doubling work reached to Manheru.Bllasted stone have been laid down over 80% of section between KSI-MHU while almost the same for rails.Where as 20% section in which in some part nothing happened yet or track linking left.
Second Plateform work is in progress at MHU,CKD and Jahrli station.
#Electrifcation work reached to MHU outer in
...
more...
which basic structure is being constructing near MHU outer.
Poles have been erected till CKD outer on both line (running line completed whereas on new line it covers almost 95%) whereas basic structure is approaching MHU.OHE mast n clips on running line till CKD and wiring has been done on both line 5 kms towards MHU to KSI
#1 - Manheru Station second PF
#2 - Jharli station second PF
#3 - Section between Kosli-Jharli
#4 - Kosli Station
#5 - Jatusana Station
#6,7,8 - Approaching Rewari where OHE is rising up to 7.5m
#9 - Bhiwani Junction and stored poles
#10 - At rewari Junction , Double stack container under High Rise OHE !
Update Given By Akash Member#1169627

  
1530 views
May 06 2017 (09:04)
Bhiwani*^   537 blog posts   198 correct pred (76% accurate)
Re# 1476321-118            Tags   Past Edits
Hisar-Bhiwani-Rohtak #Bypass Link Update
  
★  Info Update
0 Followers
6508 views
Feb 05 2017 (18:26)  

हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Entry# 2152635            Tags   Past Edits
Rohtak-Bhiwani #Electrification Update !!
Basic Structure : in between Kharak-Bamla
Poles Erected- just before Lahli

25 posts are hidden.

  
1479 views
Apr 01 2017 (13:22)
Bhiwani*^   537 blog posts   198 correct pred (76% accurate)
Re# 2152635-26            Tags   Past Edits
On rohtak-bhiwani section poles are also erected,

  
1929 views
Apr 01 2017 (20:14)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 2152635-27            Tags   Past Edits
I think till bamla yaa bhiwani tk erect kr diye ?

  
1518 views
Apr 02 2017 (11:39)
रोहित सिंह मुंदालिया   405 blog posts   430 correct pred (65% accurate)
Re# 2152635-29            Tags   Past Edits
Yes bhai

3 posts are hidden.
  
Rail Fanning
0 Followers
4181 views
Oct 27 2016 (21:13)   AWR/Alwar Junction (2 PFs)
 

Mohit~   130 blog posts
Entry# 2039290            Tags   Past Edits
Mathura Alwar route par electrification kiya hi kyun agar sirf ek hi electric train operate karni thi.Mathura Bhiwani passenger ko bhi toh electric engine se operate karni sakte hain.kya kisi ko iss bare mein much kehna hain

  
2758 views
Oct 28 2016 (10:16)
Bhiwani*^   537 blog posts   198 correct pred (76% accurate)
Re# 2039290-1            Tags   Past Edits
Entry# 1476321, Chk This Blog entry for ur Query from next month #Electrification will done till hisar and From Hisar to Ludhiana is under progress after that this route can be operate the Electric Train till LDH

  
2336 views
Oct 28 2016 (14:36)
रोहित सिंह मुंदालिया   405 blog posts   430 correct pred (65% accurate)
Re# 2039290-2            Tags   Past Edits
hisar - jakhal route par basic structure banadiye hain upto pirthala lalauda halt....koi bhi yard ka work nahi hua hian ...will do yard work after hisar....ldh - jakhal ...basic structure are made upto dhuri

4 posts are hidden.
Page#    429 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jul 8
Trains with ARP 15 Dep on: Thu Jul 13
Trains with ARP 30 Dep on: Fri Jul 28
Trains with ARP 120 Dep on: Thu Oct 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.