Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Feb 23, 2017 12:49:10 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Feb 23, 2017 12:49:10 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by krish_railz_addicted
Page#    23 Blog Entries  next>>
  
0 Followers
464 views
May 09 2010 (16:44)  
 

krish_railz_addicted   31 blog posts
Entry# 38529            Tags   Past Edits
what makes WAP-7 so special?

  
459 views
May 09 2010 (22:17)
BMTIR*^~   21262 blog posts   7421 correct pred (63% accurate)
Re# 38529-1            Tags   Past Edits
The engine capacity and teh speeds with which it hauls the trains mostly the prestigious ones like raj and shatabdi in the northern regions
  
0 Followers
617 views
May 09 2010 (12:25)  
 

krish_railz_addicted   31 blog posts
Entry# 38474            Tags   Past Edits
how to get a "footplate ride"?

  
574 views
May 09 2010 (15:13)
Guest: 45b49126   show all posts
Re# 38474-1            Tags   Past Edits
this query can be addressed in irfca. b'coz people out there do it. they may guide you. check in irfca site.
if any blogger has done footplating do let us know. thanks

  
477 views
May 09 2010 (15:42)
Guest: 564023c0   show all posts
Re# 38474-2            Tags   Past Edits
What a great topic. I have been dreaming of "footplating" since I was 10 years old. Is it even possible?

  
564 views
May 09 2010 (15:46)
Guest: 45b49126   show all posts
Re# 38474-3            Tags   Past Edits
it is possible provided you know any crew of engine who may allow it.
  
0 Followers
416 views
May 01 2010 (23:06)  
 

krish_railz_addicted   31 blog posts
Entry# 35915            Tags   Past Edits
what is the difference between "train brake" and "loco brake"?
  
1 Followers
657 views
Apr 13 2010 (08:47)  
 

krish_railz_addicted   31 blog posts
Entry# 30805            Tags   Past Edits
what is "coupling" n how this term is related to railway?

  
554 views
Apr 13 2010 (11:15)
Murli*   3039 blog posts   2 correct pred (50% accurate)
Re# 30805-1            Tags   Past Edits
:) I will answer ONLY the railway part! In general terms, it means something else!
Coupling in Railway terms is attaching one/two/three bogies together either by using a CBC coupler which automatically fits into the other bogies coupler or by a hook and screw type arrangement. Coupling of the engine to the rake is also done in similar fashion. The CBC type requires only the engine to nudge the bogies together and the couplers fit into each other.. ditto for attaching the engine. In the hook and screw type arrangement, the oblong 'square' piece of metal fabricated is lifted up manually, and inserted into the hook of the adjoining bogie. Then the screw type mechanism is tightened manually again to make the
...
more...
screw and hook to be firmly in place, preventing loose connection, by tigtening the screws to the maximum level possible. The difference in screw type coupling for engines, is that the ALP/LP also inserts over the hook coupled, another hanging square shaped metal piece to prevent the screw type coupler from jumping out during fast running. If that piece falls out, there is a loud sound which alerts the LP/ALP that something has/is going wrong on the run, and they try and immediately check whether there is any fault with the coupling of the rake, and take appropriate action.
The second part of this coupling process is to attach the air/vacuum carrying tubes of sufficient tensile strength together between the engine-bogies-Last vehicle. When this is attached, the driver releases the brake pressure, and then starts building up the pressure to the required PSI in the air brake hose, which is also reflected in the Guard's cabin. In turn to check that it is working properly, the guard, when assuming duty, which is after the LP/ALP have taken charge, again releases the brake pressure built up, and then the LP/ALP again builds up the pressure throughout the whole train, and when both readings (in the loco and the guard's van) are the same, the guard releases the train's readiness for departure.
I will be happy if someone can elaborate further on this ! Good wishes.

  
536 views
Apr 13 2010 (11:44)
NISHEETH SINGH*^   3911 blog posts   1744 correct pred (83% accurate)
Re# 30805-2            Tags   Past Edits
Hello Mr. Murli,
I am always read your blog. Your all reply is very knowable & interesting. You are a very helpful for all Indian Railway Travelers.
Thanks for your co-operation
Thanking You
Nisheeth

  
494 views
Apr 13 2010 (12:53)
krish_railz_addicted   31 blog posts
Re# 30805-3            Tags   Past Edits
thank you mr.murli for a nice explanation.regrdz

  
522 views
Apr 13 2010 (13:03)
dhetul   1256 blog posts   155 correct pred (65% accurate)
Re# 30805-4            Tags   Past Edits
Awesome Sir,
I really appreciate you effort. I think there is no more elaboration will available in same topic.
@ Krish,
I am also thankful to you coz you are asking questions & our knowledge level is increase. So keep it up.
Regards
...
more...

HE2L
  
0 Followers
785 views
Apr 11 2010 (16:25)  
 

krish_railz_addicted   31 blog posts
Entry# 30433            Tags   Past Edits
what is the meaning of "push-pull train"?

5 posts - Sun Apr 11, 2010

  
644 views
Apr 11 2010 (18:43)
RAJIV   2999 blog posts   681 correct pred (57% accurate)
Re# 30433-6            Tags   Past Edits
A push-pull train, especially a long one, may have a locomotive on both ends so that there is always one locomotive pushing and one locomotive pulling

  
628 views
Apr 11 2010 (19:15)
जितेश शुभ यात्रा*^   4124 blog posts   3167 correct pred (80% accurate)
Re# 30433-7            Tags   Past Edits
In a push-pull train, locomotives at both ends of a train are used at the same time, being controlled by the same driver.
Source : Wikipedia

  
636 views
Apr 11 2010 (19:18)
जितेश शुभ यात्रा*^   4124 blog posts   3167 correct pred (80% accurate)
Re# 30433-8            Tags   Past Edits
The term 'Push-Pull' is used to refer to trains comprising unpowered train sets with a propulsive unit (which may be a locomotive or multiple unit) at one end only. The unpowered units have multiple unit control equipment so that they can control the propulsive unit which pushes them in one direction of travel and pulls them in the other.
Most EMUs are, to some extent, push-pull, because often the motored vehicle is in the middle of the unit, not at the ends. Thus in any EMU train, some cars are being pulled and some pushed.
The
...
more...
advantage of this is that the engine or propulsive unit does not need to be removed from the train at termini because the train can be driven from each end. It is an intermediate step between normal locomotive-hauled operation and full multiple-unit operation and which can be used where full electrification of a route is not economic. It can also be used where hauled stock is not life expired and the provision of suitably equipped driving trailers allows it to be used instead of being replaced by new multiple units.
Source : www.railway-technical.com/pu-pl.shtml

  
635 views
Apr 11 2010 (19:18)
MST IndianRailways   1280 blog posts   7 correct pred (100% accurate)
Re# 30433-9            Tags   Past Edits
May be, but when i see the railway timetables, trains which have an engine in middle are named as Push-pull.

  
634 views
Apr 11 2010 (19:24)
जितेश शुभ यात्रा*^   4124 blog posts   3167 correct pred (80% accurate)
Re# 30433-10            Tags   Past Edits
Not May Be, It is
I have given you the source of info
Also your definition is right for the trains which is having engine in middle.
Check my posting @ Today (07:18PM)
source
...
more...
of information is also given again.
Thanks & Regards
  
0 Followers
626 views
Apr 09 2010 (20:23)  
 

krish_railz_addicted   31 blog posts
Entry# 29982            Tags   Past Edits
what is the meaning of "multiple unit train"?

  
617 views
Apr 09 2010 (20:49)
Guest: 84a8a884   show all posts
Re# 29982-1            Tags   Past Edits
When there are more than 2 engines, normally said to Local Trains as in Mumbai. Like, EMU = Electric Multiple Unit, and DMU = Diesel Multiple Unit.
  
0 Followers
513 views
Apr 07 2010 (19:04)  
 

krish_railz_addicted   31 blog posts
Entry# 29377            Tags   Past Edits
is indian railway fully electrified?

  
499 views
Apr 07 2010 (19:13)
Guest: 8711bf85   show all posts
Re# 29377-1            Tags   Past Edits
around 19000 kms of its entire network of about 64000 km is electrified
  
0 Followers
746 views
Apr 05 2010 (16:59)  
 

krish_railz_addicted   31 blog posts
Entry# 28870            Tags   Past Edits
which is the cleanest railway station in india?

  
602 views
Apr 05 2010 (17:13)
BASANT JOSHI   21 blog posts
Re# 28870-1            Tags   Past Edits
indian railway also searching the cleanest railway station in india. & koi agar cleanest railway station bata de to price bhi denge....ok...

  
551 views
Apr 05 2010 (17:18)
Manish*^   8594 blog posts   22387 correct pred (85% accurate)
Re# 28870-2            Tags   Past Edits
I have personally found Sri Satya Sai Prasanthi Nilayam(SSPN) to be very clean.

  
569 views
Apr 05 2010 (17:44)
Guest: 8711bf85   show all posts
Re# 28870-3            Tags   Past Edits
the new Kolkata station as far as I have seen
  
0 Followers
440 views
Apr 05 2010 (17:13)  
 

krish_railz_addicted   31 blog posts
Entry# 28878            Tags   Past Edits
from whom i need to take a permission for footplate ride?
  
0 Followers
958 views
Apr 04 2010 (16:10)  
 

krish_railz_addicted   31 blog posts
Entry# 28670            Tags   Past Edits
which is the most busiest railway station of india? why?

4 posts - Sun Apr 04, 2010

  
496 views
Apr 04 2010 (19:01)
Murli*   3039 blog posts   2 correct pred (50% accurate)
Re# 28670-5            Tags   Past Edits
New Delhi takes the cake now! CSTM in terms of passengers travelling, HWH next. Highest number of trains passing thru, including shunting, goods and passengers would be MGS followed by ET.
Suburban is excluded.
Who wins? Good wishes.

  
546 views
Apr 04 2010 (21:58)
Guest: 7ffe3bed   show all posts
Re# 28670-6            Tags   Past Edits
No. of trains (Arr & Dep) - Undoubtedly NDLS is buziest
No. of trains stopping / No. of platform (Avg) - Kalyan wins
No. of trains stopping-Passing / No. of platform (Avg) - Dadar (CR+WR)

  
633 views
Apr 05 2010 (10:11)
Murli*   3039 blog posts   2 correct pred (50% accurate)
Re# 28670-7            Tags   Past Edits
Stand alone Station on passengers is CSTM, not Dadar because it combines WR and CR!

  
630 views
Apr 05 2010 (10:22)
Manthal Krishnan*^~   2464 blog posts   312 correct pred (71% accurate)
Re# 28670-8            Tags   Past Edits
Does CSTM combines CR and WR or CR alone?

  
645 views
Apr 05 2010 (11:03)
Guest: 7fc795dd   show all posts
Re# 28670-9            Tags   Past Edits
Only CR
Page#    23 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 5
Trains with ARP 15 Dep on: Fri Mar 10
Trains with ARP 30 Dep on: Sat Mar 25
Trains with ARP 120 Dep on: Fri Jun 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site