Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Mon Sep 22, 2014 23:45:15 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip    Post a Station TipPost a Station Tip    Super Search
Topics:    Filters:

Blog Posts by abhi2904
Page#    Showing 1 to 10 of 49 blog entries  next>>
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Thu Oct 02, 2014 @ 12:00
02695/Yesvantpur - Jaipur Premium Special
Entry# 1221562
 
   Posted by: abhi2904   124 blog posts   411 correct pred (69% accurate)
PNR: 410-xxxxxxx (E-Ticket)   |   AC 3-tier - 3A   |   Charting: < 08:04   |   Similar PNRs
YPR/Yesvantpur Junction   to   PUNE/Pune Junction   |   1149 km / 2451 km
Original Status as of: Today (10:20PM)
Passenger 1: Confirmed (Booking Status: B1,23,GN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.
I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: Today (10:50PM) 
Passenger 1: Confirmed (Booking Status: B1,23,GN)
Chart NOT Prepared
Predictions: 17
confirm: 17
rac: 0
wl: 0
PREDICT


Journey: Wed Oct 22, 2014 @ 21:35
18181/Tatanagar-Chhapra Express        
 

Posted by: abhi2904   124 blog posts   411 correct pred (69% accurate)  
PNR: 673-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >46   |   Charting: < 14:43   |   Similar PNRs
TATA/Tatanagar Junction   to   SPJ/Samastipur Junction   |   470 km / 635 km
Entry# 1199411           
Original Status as of: Aug 27 (9:13PM)
Passenger 1: Waitlist# 13 (Booking Status: W/L 13,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.
I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: Yesterday (10:45PM) 
Passenger 1: Waitlist# 9 (Booking Status: W/L 13,GNWL)
Chart NOT Prepared


29 views
Yesterday (10:15PM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1199411-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
what will the final status of this ticket as it is at the time of diwali.
Predictions: 9
confirm: 9
rac: 0
wl: 0
PREDICT


Journey: Tue Sep 30, 2014 @ 06:55
12820/Orissa Sampark Kranti Express        
 

Posted by: abhi2904   124 blog posts   411 correct pred (69% accurate)  
PNR: 216-xxxxxxx (E-Ticket)   |   AC 3-tier - 3A   |   Tot Seats: Avbl >129   |   Charting: < 05:42   |   Similar PNRs
NDLS/New Delhi   to   TATA/Tatanagar Junction   |   1399 km / 1852 km
Entry# 1212510           
Original Status as of: Sep 11 (7:32PM)
Passenger 1: Waitlist# 41 (Booking Status: W/L 64,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks. I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: Today (10:32PM) 
Passenger 1: Waitlist# 23 (Booking Status: W/L 64,GNWL)
Chart NOT Prepared


23 views
Sep 20 (8:01PM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1212510-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
what will the final status of this ticket as it is at the time of diwali.
Predictions: 14
confirm: 14
rac: 0
wl: 0
Journey: Sat Aug 30, 2014 @ 06:45
12801/Purushottam SF Express
Entry# 1179248
 
   Posted by: abhi2904   124 blog posts   411 correct pred (69% accurate)
PNR: 673-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >16   |   Charting: < 23:02   |   Similar PNRs
TATA/Tatanagar Junction   to   NDLS/New Delhi   |   1349 km / 1869 km
Original Status as of: Aug 06 2014 (1:07AM)
Passenger 1: RAC 5 (Booking Status: W/L 5,RLGN)
Passenger 2: RAC 6 (Booking Status: W/L 6,RLGN)
Passenger 3: Waitlist# 1 (Booking Status: W/L 7,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.
I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: Aug 20 2014 (8:24PM)
Passenger 1: Can/Mod (Booking Status: W/L 5,RLGN)
Passenger 2: Can/Mod (Booking Status: W/L 6,RLGN)
Passenger 3: Can/Mod (Booking Status: W/L 7,RLGN)
Chart NOT Prepared

433 views
Aug 06 2014 (8:16AM)        

Swarag Madavi   705 blog posts   3836 correct pred (77% accurate)  
Re# 1179248-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
#racallocation 6 in 3A from TATA to NDLS.
Latest Status as of: Today (7:21AM)
Passenger 1: RAC 5 (Booking Status: W/L 5,RLGN)
Passenger 2: RAC 6 (Booking Status: W/L 6,RLGN)
Passenger 3: Waitlist# 1 (Booking Status: W/L 7,RLGN)
Chart NOT Prepared
Predictions: 20
confirm: 19
rac: 1
wl: 0
Journey: Sat Aug 02, 2014 @ 19:45
13186/Ganga Sagar Express
Entry# 1138218
 
   Posted by: abhi2904   124 blog posts   411 correct pred (69% accurate)
PNR: 653-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >52   |   Charting: < 12:11   |   Similar PNRs
SPJ/Samastipur Junction   to   SDAH/Kolkata Sealdah   |   516 km / 621 km
Original Status as of: Jun 17 2014 (6:02PM)
Passenger 1: Waitlist# 10 (Booking Status: W/L 10,GNWL)
Passenger 2: Waitlist# 11 (Booking Status: W/L 11,GNWL)
Passenger 3: Waitlist# 12 (Booking Status: W/L 12,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Aug 05 2014 (5:46PM)
Passenger 1: Can/Mod (Booking Status: W/L 10,GNWL)
Passenger 2: Can/Mod (Booking Status: W/L 11,GNWL)
Passenger 3: Can/Mod (Booking Status: W/L 12,GNWL)
Chart PREPARED

434 views
Jul 12 2014 (12:43PM)        

mai hoo na   172 blog posts   2847 correct pred (69% accurate)  
Re# 1138218-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
#admins pls predict
2day's PNR.... its urgent

331 views
Jul 26 2014 (3:02PM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1138218-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
please predict.
Predictions: 25
confirm: 6
rac: 17
wl: 2
Journey: Fri Jun 20, 2014 @ 20:37
22351/Patliputra - Yesvantpur Express
Entry# 1139872
 
   Posted by: abhi2904   124 blog posts   411 correct pred (69% accurate)
PNR: 662-xxxxxxx    |   AC 3-tier - 3A   |   Charting: < 17:18   |   Similar PNRs
DNR/Danapur   to   MAS/Chennai Central   |   2568 km / 2915 km
Original Status as of: Jun 19 2014 (10:28AM)
Passenger 1: Waitlist# 19 (Booking Status: W/L 77,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.
I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: Jun 20 2014 (7:00PM)
Passenger 1: B3,62/Coach Position:9 (Booking Status: W/L 77,GNWL)
Chart PREPARED

340 views
Jun 19 2014 (11:48AM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1139872-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
what are the chences of its confirmation, it has 4 3AC coaches.

336 views
Jun 19 2014 (6:50PM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1139872-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
still its waiting 13

333 views
Jun 19 2014 (7:56PM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1139872-3               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
no cancellations

332 views
Jun 20 2014 (9:23AM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1139872-4               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
what could be its status after charting.

198 views
Jun 20 2014 (1:11PM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1139872-5               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
still waiting 12
Predictions: 7
confirm: 1
rac: 5
wl: 1
Journey: Sat Jun 21, 2014 @ 14:50
12841/Coromandel Express
Entry# 1134119
   Posted by: abhi2904   124 blog posts   411 correct pred (69% accurate)
PNR: 623-xxxxxxx    |   AC 2-tier - 2A   |   Tot Seats: Avbl >38   |   Charting: < 07:08   |   Similar PNRs
HWH/Kolkata Howrah Junction   to   MAS/Chennai Central   |   1661 km / 1661 km
Original Status as of: Jun 13 2014 (9:30PM)
Passenger 1: Waitlist# 23 (Booking Status: W/L 59,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 24 2014 (1:13PM)
Passenger 1: Can/Mod (Booking Status: W/L 59,GNWL)
Chart PREPARED

388 views
Jun 17 2014 (6:12PM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1134119-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
What is the chances for its confirmation

273 views
Jun 18 2014 (11:11AM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1134119-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
what is the chances for its confirmation.

194 views
Jun 20 2014 (10:17AM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1134119-3               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
what will b its status after charting.
Predictions: 3
confirm: 2
rac: 0
wl: 1
Journey: Tue Jun 24, 2014 @ 23:55
13201/Rajendra Nagar Patna - Mumbai LTT Express
Entry# 1138210
 
   Posted by: abhi2904   124 blog posts   411 correct pred (69% accurate)
PNR: 643-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >66   |   Charting: < 16:21   |   Similar PNRs
PNBE/Patna Junction   to   LTT/Mumbai Lokmanya Tilak Terminus   |   1692 km / 1694 km
Original Status as of: Jun 17 2014 (5:56PM)
Passenger 1: Waitlist# 27 (Booking Status: W/L 49,GNWL)
Passenger 2: Waitlist# 28 (Booking Status: W/L 50,GNWL)
Passenger 3: Waitlist# 29 (Booking Status: W/L 51,GNWL)
Passenger 4: Waitlist# 30 (Booking Status: W/L 52,GNWL)
Passenger 5: Waitlist# 31 (Booking Status: W/L 53,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 24 2014 (1:13PM)
Passenger 1: Can/Mod (Booking Status: W/L 49,GNWL)
Passenger 2: Can/Mod (Booking Status: W/L 50,GNWL)
Passenger 3: Can/Mod (Booking Status: W/L 51,GNWL)
Passenger 4: Can/Mod (Booking Status: W/L 52,GNWL)
Passenger 5: Can/Mod (Booking Status: W/L 53,GNWL)
Chart NOT Prepared

269 views
Jun 17 2014 (6:07PM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1138210-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
What is the chances for its confirmation.

254 views
Jun 18 2014 (11:16AM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1138210-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
what is the chances for its confirmation.
Predictions: 7
confirm: 2
rac: 2
wl: 3
Journey: Fri Jun 20, 2014 @ 19:45
13186/Ganga Sagar Express
Entry# 1138214
 
   Posted by: abhi2904   124 blog posts   411 correct pred (69% accurate)
PNR: 653-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >52   |   Charting: < 12:11   |   Similar PNRs
SPJ/Samastipur Junction   to   SDAH/Kolkata Sealdah   |   516 km / 621 km
Original Status as of: Jun 17 2014 (5:59PM)
Passenger 1: Waitlist# 16 (Booking Status: W/L 34,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.
I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: Jun 20 2014 (11:42AM)
Passenger 1: Can/Mod (Booking Status: W/L 34,GNWL)
Chart NOT Prepared

250 views
Jun 17 2014 (6:31PM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1138214-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
What is the chances for its confirmation

244 views
Jun 18 2014 (11:10AM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1138214-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
what is the chances for its confirmation.
Predictions: 22
confirm: 22
rac: 0
wl: 0
Journey: Fri May 16, 2014 @ 17:15
12310/New Delhi-Rajendra Nagar Patna Rajdhani Express
Entry# 1069998
 
   Posted by: abhi2904   124 blog posts   411 correct pred (69% accurate)
PNR: 245-xxxxxxx    |   AC 2-tier - 2A   |   Tot Seats: Avbl >211   |   Charting: < 09:22   |   Similar PNRs
NDLS/New Delhi   to   PNBE/Patna Junction   |   999 km / 1002 km
Original Status as of: Apr 24 2014 (5:05PM)
Passenger 1: Waitlist# 52 (Booking Status: W/L 72,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks. I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: May 17 2014 (3:13PM)
Passenger 1: RA1 47/Coach Position:11 (Booking Status: W/L 72,GNWL)
Chart PREPARED

118 views
May 04 2014 (3:01PM)        

abhi2904   124 blog posts   411 correct pred (69% accurate)  
Re# 1069998-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
what is the chances for its confirmation.
Page#    49 blog entries  next>>

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Oct 2, 2014
Trains with ARP 30 Dep on: Wed Oct 22, 2014
Trains with ARP 60 Dep on: Fri Nov 21, 2014

  
  

Rail News

  • Bangalore Metro Ph-1 completion pushed to Q1, 2016  News Entry# 195212
    by: rdb**  Today (11:44PM)


    Bangalore Metro Rail Corporation Limited (BMRCL), the agency implementing the metro rail project in Bangalore, is likely to miss yet another deadline for the completion of first phase of the project. The 42.3-km stretch of Phase-1 will now be completed by first quarter of 2016, instead of September 2015. The...
  • METRO ISSUE DRIVES WEDGE BETWEEN ERRABELLI, REVANTH  News Entry# 195211
    by: rdb**  Today (11:35PM)


    * Rumour mill abuzz with stories of Errabelli's possible defection
    * Revanth attacks Errabelli's pal in Metro Rail case
    Reported meeting between TDP Telangana senior leader Errabelli Dayakar Rao and Telangana CM...
  • Changing platforms stampede  News Entry# 195210
    by: J A I H O  Today (11:31PM)


    प्लेटफार्म बदलने से मची भगदड़
    सतना। सतना स्टेशन पर रविवार सुबह 11 बजे सतना-मानिकपुर पैसेंजर ट्रेन के प्लेटफार्म नंबर आने की जानकारी प्रसारित की गई। मानिकपुर की ओर जाने वाले यात्री ट्रेन पकड़ने के लिए प्लेटफार्म नंबर एक पर एकत्रित होने...
  • The station was moved Bjria Bangladeshi suspect  News Entry# 195209
    by: J A I H O  Today (11:28PM)


    स्टेशन बजरिया पर घूमता मिला संदिग्ध बांग्लादेशी
    ग्वालियर।स्टेशन बजरिया पर रविवार रात एसटीडी से फोन लगा रहे संदिग्ध बांग्लादेशी युवक को पड़ाव पुलिस ने हिरासत में लिया है। उसके कब्जे से उर्दू-फारसी में लिखे दस्तावेज मिले। संदिग्ध दो तीन दिन पहले...
  • Delhi Metro to start feeder bus service from Shivaji Stadium station tomorrow  News Entry# 195208
    by: rdb**  Today (11:24PM)


    NEW DELHI: Delhi Metro will be starting a dedicated feeder bus service from Shivaji Stadium Metro station of the Airport Express line from Tuesday onwards.
    According to a DMRC official, the route of this feeder bus service will cover approximately...

New Trains

Site Announcements

  • Entry# 1220805
    Today (05:51AM)


    Regarding the CR/NCR rivalry that is dominating the blogs these days in IRI, we are all open to listen to constructive SOLUTIONS as to what can be done. Should we create a separate Android app that will record authentic train speeds that no one can dispute? . Members are invited to put...
  • Entry# 1209120
    Sep 07 (03:36PM)


    -@all members: This is an IMPORTANT reminder to all members that NO MONETARY transactions are permitted within the scope of IRI. Members are NOT ALLOWED to borrow/lend money to each other, book rail tickets for each other, introduce themselves as "IRI Members/Admins" and solicit monetary favours, asking to book rail tickets...
  • Entry# 1204822
    Sep 02 (07:04PM)


    With the roll out of new TTs, we are introducing 3 new enhancements: . 1. "To Be Introduced" trains: As the title implies, Admins may add Trains that are announced in the Budget and Not yet introduced, to this list, with WHATEVER tentative TT is available, and whatever sketchy or vague information...
  • Entry# 1193896
    Aug 21 2014 (10:23PM)


    The new IRI logo can now be seen. Actually, we are reluctant to make changes to the logo (for the sake of recognizability and consistency), but some very slight modification was done this time. Here is the post-facto rationalization of the logo: . 1. The Chakra is the Wheel symbolizing Transportation/Travel which...
  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
Scroll to Top
Scroll to Bottom