Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     

Search
  Go  
 
Thu Jan 29, 2015 23:50:45 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Thu Jan 29, 2015 23:50:45 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipModify Search
Filters:

Blog Posts by Mumbai Meri Jaan*^
Page#    1435 Blog Entries  next>>
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Tue Feb 17, 2015 @ 09:30
17239/Simhadri Express
Entry# 1352715

Posted by: attitude   72 blog posts   4169 correct pred (78% accurate)
PNR: 472-xxxxxxx (E-Ticket)   |   2nd Sitting - 2S   |   Tot Seats: Avbl >108   |   Charting: < 05:32   |   Similar PNRs
BZA/Vijayawada Junction   to   SLO/Samalkot Junction   |   199 km / 385 km
Original Status as of: Jan 27 (1:54PM)
Passenger 1: Confirmed (Booking Status: D1,73,GN)
Passenger 2: Confirmed (Booking Status: D1,74,GN)
Passenger 3: Confirmed (Booking Status: D1,75,GN)
Passenger 4: Confirmed (Booking Status: D1,76,GN)
Passenger 5: Confirmed (Booking Status: D1,77,GN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Today (11:12PM) 
Passenger 1: Confirmed (Booking Status: D1,73,GN)
Passenger 2: Confirmed (Booking Status: D1,74,GN)
Passenger 3: Confirmed (Booking Status: D1,75,GN)
Passenger 4: Confirmed (Booking Status: D1,76,GN)
Passenger 5: Confirmed (Booking Status: D1,77,GN)
Chart NOT Prepared

  
400 views
Today (9:29PM)        

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Re# 1352715-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Congrats you won laptop from irctc

  
292 views
Today (10:03PM)        

12658 Chennai Mail*^   6941 blog posts   14372 correct pred (63% accurate)  
Re# 1352715-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
how

  
146 views
Today (10:52PM)        

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Re# 1352715-3               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.

  
114 views
Today (10:58PM)        

KMonIRI**   2726 blog posts   47629 correct pred (71% accurate)     Ph:+919330451736
Re# 1352715-4               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
kya bat hai......
Congrats Subhankar Dada

  
108 views
Today (10:58PM)        

KMonIRI**   2726 blog posts   47629 correct pred (71% accurate)     Ph:+919330451736
Re# 1352715-5               Tags   Past Edits
Jan 29 2015 (10:59PM)
graet great work Farid vai
Great Research...and finding...great work Farid vai
  
General Travel
0 Followers
171 views
Jan 25 (1:29PM)           

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Entry# 1351048               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
List of Trains for initial phase of e-catering project.
SN Train No. Train Name Railway IRCTC Zone Remarks
1 12413 AII-JAT Exp NR NZ
2 12414 JAT-AII Exp NR NZ
3 12155 Bhopal Exp (HBJ-NZM) WCR WZ
4 12156 Bhopal Exp (NZM-HBJ) WCR WZ
5 14317 INDB-DDN Exp NR NZ
6 14318 DDN-INDB Exp NR NZ
7 11103 Intercity Exp (JHS-BDTS) NCR NZ
8 11104 Intercity Exp (BDTS-JHS) NCR NZ
9 12215 Garib Rath (DEE-BDTS) NR NZ
10 12216 Garib Rath (BDTS-DEE) NR NZ
11 12673 Cheran Exp (MAS-CBE) SR SZ
...
Read more...
12 12674 Cheran Exp (MAS-CBE) SR SZ
13 12689 Nagercoil Exp (MAS-NCJ) SR SZ
14 12690 Nagercoil Exp (NCJ-MAS) SR SZ
15 12201 LTT-KCVL Garib Rath SR SZ
16 12202 KCVL-LTT Garib Rath SR SZ
17 16215 Chamundi Exp (MYS-SBC) SWR SZ
18 16216 Chamundi Exp (SBC-MYS) SWR SZ
19 16315 Kochuveli Exp (SBC-KCVL) SR SZ
20 16316 Kochuveli Exp (KCVL-SBC) SR SZ
21 12603 Hyderabad Exp (MAS-HYB) SR SZ
22 12604 Hyderabad Exp (HYB-MAS) SR SZ
23 17015 Visakha Exp (BBS-SC) SCR SCZ
24 17016 Visakha Exp (SC-BBS) SCR SCZ
25 12735 SC Garib Rath (SC-YPR) SCR SCZ
26 12736 SC Garib Rath (YPR-SC) SCR SCZ
27 12909 BDTS Garib Rath Rxp (BDTS-NZM) WR WZ
28 12910 BDTS Garib Rath Rxp (NZM-BDTS) WR WZ
29 12517 GHY Garib Rath (KOAA-GHY) NFR EZ
30 12518 GHY Garib Rath (GHY-KOAA) NFR EZ
31 12187 Mumbai Garib Rath (JBP-CSTM) WCR WZ
32 12188 Mumbai Garib Rath (CSTM-JBP) WCR WZ
33 12061 Jan Shatabdi Exp (HBJ-JBP) WCR WZ
34 12062 Jan Shatabdi Exp (JBP-HBJ) WCR WZ
35 12569 Garib Rath Exp (JYG-ANVT) ECR EZ
36 12570 Garib Rath Exp (ANVT-JYG) ECR EZ
37 12555 Gorakhdham Express (GKP-HSR) NER NZ
38 12556 Gorakhdham Express (HSR-GKP) NER NZ
39 12797 Venkatadri Exp (KCG-CTO) SCR SCZ
40 12798 Venkatadri Exp (CTO-KCG) SCR SCZ
41 11035 Shravasti Exp (MYS-DR) CR WZ
42 11036 Shravasti Exp (DR-MYS) CR WZ
43 19023 FZR-Janata Exp WR WZ
44 19024 FZR-Janata Exp WR WZ
45 22917 BDTS-HW WR WZ
46 22918 HW-BDTS WR WZ
47 18645 East Coast Exp (HWH-HYB) SER EZ
48 18646 East Coast Exp (HYB-HWH) SER EZ
49 12993 GIMB-PURI EXP WR WZ
50 12994 PURI-GIMB EXP WR WZ
51 14645 Shalimar Exp (DLI-JAT) NR NZ Included for sector of DLI-ASR & DLI-JAT Only
52 14646 Shalimar Exp (JAT-DLI) NR NZ
53 14033 Jammu Mail (DLI-JAT) NR NZ
54 14034 Jammu Mail (JAT-DLI) NR NZ
55 12445 Uttar S. Kranti (NDLS-UHP) NR NZ
56 12446 Uttar S. Kranti (UHP-NDLS) NR NZ
57 14095 Himalaya Queen Exp (DEE-KLK) NR NZ
58 14096 Himalaya Queen Exp (KLK-DEE) NR NZ
59 14731 DLI-BTI Exp NR NZ
60 14732 BTI-DLI Exp NR NZ
61 14681 NDLS-JUC Exp NR NZ
62 14682 JUC-NDLS Exp NR NZ
63 22401 DEE-UHP AC Exp NR NZ
64 22402 UHP-DEE AC Exp NR NZ
65 12497 Shane Punjab (NDLS-ASR) NR NZ
66 12498 Shane Punjab (ASR-NDLS) NR NZ
67 12459 NDLS-ASR Exp NR NZ
68 12460 ASR-NDLS Exp NR NZ
69 14037 DLI-PTK Exp NR NZ
70 14038 PTK-DLI Exp NR NZ
71 15707 KIR-ASR Exp NFR EZ
72 15708 ASR-KIR Exp NFR EZ
73 11057 LTT-ASR Exp CR WZ
74 11058 ASR-LTT Exp CR WZ
75 14673 Shaheed Exp(JYG-ASR) ECR EZ
76 14674 Shaheed Exp(ASR-JYG) ECR EZclick here
  
Rail Fanning
0 Followers
197 views
Jan 19 (4:59PM)           

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Entry# 1344915               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
dsc8571443038.jpgdsc00216560658.jpg
dsc00220652719.jpgimg5024450945.jpgimg5056491059.jpgimg7013277765.jpgimg7377517697.jpgimg9441362687.jpgimg9475458562.jpgrecoveredjpeg5077105809.jpgrecoveredjpeg5078520030.jpgrecoveredjpeg5080130702.jpgrecoveredjpeg5084392003.jpgrecoveredjpeg5139427103.jpgrecoveredjpeg5603508435.jpgrecoveredjpeg6005297612.jpgscn0003627333.jpgscn0005313596.jpgworkshop28483620.jpg
Address:
Administrative Building
Rail Coach Factory,
Kapurthala -144602 (Punjab)

Established in 1986, RCF is a coach manufacturing unit of Indian Railways. RCF has already carved a niche in the industrial scenario of the country at large and Indian Railways, in particular. It has manufactured around 28000 passenger coaches of different types including Self Propelled passenger vehicles which constitute over 50% of the total population of coaches on Indian Railways.
RCF is equipped with a state-of-the-art CAD centre and CNC machines to undertake design and manufacture of Bogies, Shell (both with Stainless Steel
...
Read more...
and Corten Steel), FRP interiors as per customer’s requirement. The state-of-the-art manufacturing facilities and processes have enabled RCF to achieve excellence in Design, Development, Manufacture, Installation and After-sales service of Railway coaches with a view to ensure enhanced satisfaction of the Rail customer.
RCF has a strong tradition of innovating and developing new products and has a very wide manufacturing range of products which includes:-
• 1st AC Sleeper Coach (BG)
• 2 Tier AC Sleeper Coach (BG, MG)
• 3 Tier AC Sleeper Coach (BG)
• AC Inspection Coach (BG)
• AC Chair Car, Executive Class & Economy Class (BG, MG)
• AC Buffet Car (BG)
• AC Power Car (BG)
• MG Diesel Electrical Multiple Units
• Main Line Electrical Multiple Units (BG)
• Non-AC Sleeper Class Day Coach (BG)
• Non-AC General Coach (BG/MG)
• Non-AC Luggage-cum-Brake Van (BG/MG)
• Refrigerated Parcel Van (BG)
• Non AC Inspection Coach (BG)
• High Capacity Parcel Van (BG)
• Accident Relief Train (BG)
• Post Office Coach (BG)
• Coaching Container Flats (BG)
• Double Decker Coach (BG)
• Non-AC Day Coach (BG)
Design, development and manufacture of AC 3 Tier coach with Roof Mounted AC Package Units by RCF has revolutionized AC travel in the country. Since 1998, High Speed AC Chair Cars and Generator Cars designed and manufactured by RCF have been running in New Delhi – Amritsar Shatabadi Express service of Indian Railways. Tested at upto 180 kmph, the vehicles feature Disc Brakes, Flexicoil Secondary Suspension, UIC Draw Gear and Panoramic Windows.
Upgradation of Coach Technology
To bring a quantum jump in passenger coach technology and bring it to the contemporary world standards under Transfer of Technology Contract with M/s. Alstom-LHB, Germany, RCF has successfully rolled out Alstom-LHB design stainless steel coaches for Rajdhani & Shatabadi Express trains. The designs for Rajdhani coaches including lay outs, manufacturing drawings and specification etc. were entirely prepared by RCF. The bogies for these coaches are of FIAT design providing faster, comfortable and safe travel. RCF has now fully absorbed the state-of-the-art Technology for manufacturing stainless steel coaches. 350 nos. of stainless steel coaches in 13 different variants have already been manufactured by RCF. This breakthrough includes in-house development of 10 variants of stainless steel coaches to cater to the requirements of various classes of passenger travel on Indian Railways. 5 Rajdhani rakes of these state-of-the-art coaches are now running between Mumbai and New Delhi and 4 rakes are running between Kolkata and New Delhi. RCF has also rolled out these superior coaches for Shatabadi trains for operation at 150 kmph to be the fastest train of Indian Railways. Special features of these state-of-the-art stainless steel coaches are:-
• Operational & Maintenance Superiority
• Stainless steel shell to eliminate corrosion.
• Extra passenger carrying capacity.
• Lower coach weight leading to lower hauling cost.
• Maximum operating speed of 160 kmph and tested upto 180 kmph.
• Disc brakes for efficient braking and lesser maintenance.
• Wheel slide protection prevents wheel flats.
• Maintenance free cartridge taper roller bearings.
• Better curve negotiation due to articulated control arm fitted with resilient bush.
• Lesser maintenance leading to improved availability.
• Improved Passenger Interface
• FIAT bogie which is an adoption of Eurofima design provides improved ride index of 2.5 at 160 kmph.
• Plush interiors.
• Improved panoramic view through bigger windows.
• Modular toilets with controlled discharge system to avoid soiling of station premises.
• Wider vestibules for easier intercoach movement.
• Improved Safety
• Centre Buffer Coupler with anti-climbing features.
• 4 emergency exit windows for faster passenger evacuation.
• Fire retardant furnishing.
Computer Aided Design and Manufacturing Facilities
RCF has developed into a centre of excellence in CAD/CAM and CAE Unigraphics version 13-standard. CAD software is used for design of all coaches and its components. RCF has also developed in-house capabilities in linear stress analysis of coach shell and bogie structure through the technique of Finite Element Model. Thrust in design and development is directed towards cost reduction, improvement in passenger amenities and comfort, safety of operation and reliability of equipment and ease of manufacture.
State-of -the-Art Machines:
Following machines are installed and in use:
• Laser Profile Cutting Machines – 02 nos.
• Plasma Profile Cutting Machines – 02 nos.
• Underwater Plasma Cutting Machines – 02 nos.
• Robotic Spot Welding Machine – 01 no.
• Robotic Garnet Blasting Machine – 01 no.
• CNC Bogie Machining Centre – 01 no.
• CNC Bolster Machining Machine – 01 no.
• Robotic Welding for Bogie Frame – 01 no.
• CNC Bed Milling Machine – 01 no.
• CNC Cold Roll Forming Machine – 01 nos.
• CNC Cut to Length Line – 01 no.
• CNC Press Brake (100Tons to 1000 Tons)
• CNC Shearing Centre – 01 no.
• Semi Automatic Painting Booths - 03
• Laser Profile Cutting & Welding Machine – 01 no.
• Laser Profile Cutting Machine – 02 nos.
• Laser Profile Cutting Machine – 01 no.
• Laser Profile Cutting & Welding Machine – 01 no.
• Spot Welding Machine – 01 no.
• Robotic Welding Machine for Bogie Bolster and Frame – 01 no.
Marketing / Exports
• In 2000-01, exported 72 MG bogies to Vietnam National Railways.
• In 2005-06, exported 36 No’s MG coaches to Myanmar Railways. In 2006-07, exported 20 No’s Day coaches to PTB, Senegal. RCF has also bagged an export order of 50 coaches to Senegal, Mali. Out of these, 10 coaches have been dispatched in Nov. 2006.
Domestic Sales
RCF has designed, manufactured and supplied:
• 28 nos. Postal Vans to Department of Posts in the year 2000-01 and a repeat supply of 25 nos. Postal Vans in the year 2004-05.
• 06 nos. Special Purpose coaches to DRDO in 1999-2000 and a repeat supply of 06 nos. in 2005-06.
• 16 AC coaches (04 nos. 2-Tier and 12 nos. 3-Tier) to Ministry of Defence in 2001-02. Further, 32 No’s AC coaches (21 No’s 3-Tier and 11 No’s AC 2-Tier) were supplied in Oct 2005 (21 No’s AC 3-Tier) and Feb. 2006 (11 No’s AC 2-Tier coaches).
ISO-9001 (Quality Management System)
RCF is committed to achieve excellence in design, development, manufacture, installation and servicing of Railway coaches and other products so as to ensure continued customer satisfaction at competitive cost. Towards this commitment, RCF became the first Production Unit of Indian Railways to achieve ISO-9001 certification in 1995.
ISO 14001 (Environmental Management System)
Continued improvement in environment standards has been one of the focus areas of RCF for the benefit of the society at large. Today with its serene atmosphere, all around greenery, about 2 lacs trees, lake complex, golf course, kayaking club and boating channel, RCF is the proud owner of one of the best Township in the country. The environmental standards apart from providing pleasant surroundings to its work-force residing in the township, also provide protection to its sophisticated machinery and plant from the otherwise adverse atmosphere. In order to maintain and preserve the blissful environment, RCF has achieved ISO- 14001 for the entire RCF complex including residential area.
information from Railway Site.
  
★  Rail Fanning
0 Followers
390 views
Jan 16 (8:28PM)           

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Entry# 1342166               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
108850167473481120241854206672013443202896n.jpgRail Car @ Shimla & Manali.

  
323 views
Jan 16 (8:45PM)        

Jay**   5732 blog posts   1351 correct pred (73% accurate)  
Re# 1342166-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Manali? AFAIK no railway line around Manali.
  
Rail News
0 Followers
309 views
Jan 06 (6:12PM)   WESTERN RAILWAY EXTENDES MOBILE TICKETING FACILITIES AT FIVE MORE STATIONS        

rdb**   94297 news posts
Entry# 1332587   News Entry# 207921 **new            Tags   Past Edits
This is a new feature showing past edits to this News Post.
Western Railway has extended the facility of Mobile Ticketing for the suburban commuters at five more stations i.e. Vasai Road, Virar, Nallasopara, Malad and Kandivali. With this, now this facility is available at ten suburban stations of Western Railway in Mumbai.
...
Read more...
This facility can be availed by registering o­ne's Mobile Number at click here Ticket can be book o­nline and can be printed o­n ATVM machines at these stations with the help of your Mobile No. and special booking ID, which is sent through SMS.
This facility has been introduced to reduce queues and save time of the commuters. It is already available at Churchgate, Mumbai Central, Dadar, Andheri and Borivali. R wallet can be recharged at these 10 stations.
**

1 posts - Tue Jan 06, 2015 - are hidden. Click to open.

  
906 views
Jan 06 (9:26PM)        

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Re# 1332587-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
i use today its nice.
  
General Travel
2 Followers
1725 views
Jan 01 (8:34PM)           

Ateek   963 blog posts   2714 correct pred (70% accurate)     Ph:+918652080370
Entry# 1327348               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
SBI net banking users, there is an option of IRCTC quick pay (for SBI netbankers). I've seen it today only. What is the difference experienced by using this. Ii haven't use this till now but those who have used it ,can you please explain it.

2 posts - Thu Jan 01, 2015 - are hidden. Click to open.

12 posts - Sat Jan 03, 2015 - are hidden. Click to open.

  
358 views
Jan 03 (8:48PM)        

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Re# 1327348-15               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
What Screen Shot is this pls explain.

  
333 views
Jan 03 (8:57PM)        

Ateek   963 blog posts   2714 correct pred (70% accurate)     Ph:+918652080370
Re# 1327348-16               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Its actually for SBI net bankers. Online txn requires OTP recieved in mobile for confirmation of payment. But for irctc there is an option where you can disable OTP for irctc txn which saves time. Really helpful during CK hours.
Just imagine you are booking at 10.00 am and enter all details (user id and pass for logging) but wait for message to come and then enter the OTP, this is tedious and time consuming. so to avoid this we disable OTP for irctc

  
322 views
Jan 03 (8:59PM)        

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Re# 1327348-17               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
even i got SBI online banking but when i am clicking on submit button its not moving forward.

1 posts - Sat Jan 03, 2015 - are hidden. Click to open.

  
299 views
Jan 03 (9:04PM)        

Ateek   963 blog posts   2714 correct pred (70% accurate)     Ph:+918652080370
Re# 1327348-19               Tags   Past Edits
Jan 03 2015 (9:05PM)
Try it tomorrow morning, might help
Sir, it was workin for us in afternoon. Maybe some technical issues.Try it tomorrow morning, might help . Pls use this facillity (irctc quick book) and if you book tkt before us then pls let us know about this. If I book first then I'll let you know the difference.

  
288 views
Jan 03 (9:07PM)        

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Re# 1327348-20               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
ok sure

  
302 views
Jan 04 (11:41AM)        

Nazeer*^   9486 blog posts   15968 correct pred (72% accurate)  
Re# 1327348-21               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Same here :(

2 posts - Sun Jan 04, 2015 - are hidden. Click to open.

1 posts - Fri Jan 09, 2015 - are hidden. Click to open.

2 posts - Sat Jan 10, 2015 - are hidden. Click to open.
  
Travel Question
0 Followers
230 views
Jan 03 (9:50PM)           

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Entry# 1329673               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
if the train is canceled still we need to file TDR.
  
General Travel
0 Followers
311 views
Dec 27 2014 (5:19PM)           
 

12658 Chennai Mail*^   6941 blog posts   14372 correct pred (63% accurate)  
Entry# 1322109               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
IF a Pax books a tkt under SS quota and gets CNF LB while booking. Before travel date, pax cancels his tkt,
now, since the tkt booked under SS Quota will go to SS only or it will get allotted to next WL / RAC pax.

  
274 views
Dec 27 2014 (5:26PM)        

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Re# 1322109-1               Tags   Past Edits
Dec 27 2014 (5:26PM)
t It will get allotted to next WL / RAC pax
It will get allotted to next WL / RAC pax

  
254 views
Dec 27 2014 (5:37PM)        

12658 Chennai Mail*^   6941 blog posts   14372 correct pred (63% accurate)  
Re# 1322109-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
It is booked under SS quota ( male above 60 Yrs )

1 posts - Sat Dec 27, 2014 - are hidden. Click to open.
  
General Travel
0 Followers
436 views
Dec 27 2014 (4:30PM)           
 

EDUCATION is MUST RAHUL B   2349 blog posts   253 correct pred (67% accurate)  
Entry# 1322062               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
At Dadar station.... Attending Ceremony to introduce m ticketing system.. Chief guest Honble RM Suresh Prabhu.... Good facility for Mumbaikar

4 posts - Sat Dec 27, 2014 - are hidden. Click to open.

  
350 views
Dec 27 2014 (4:51PM)        

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Re# 1322062-5               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
any link to download

  
345 views
Dec 27 2014 (4:52PM)        

EDUCATION is MUST RAHUL B   2349 blog posts   253 correct pred (67% accurate)  
Re# 1322062-6               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
I dont know frnd.... I am attending this program & updating live

2 posts - Sat Dec 27, 2014 - are hidden. Click to open.
  
★  General Travel
0 Followers
469 views
Dec 26 2014 (3:21PM)           
 

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Entry# 1320879               Tags   Past Edits
Dec 26 2014 (3:26PM)
SALIENT FEATURES OF MUMBAI DIVISION (WR)
SALIENT FEATURES OF MUMBAI DIVISION (WR)
1. ROUTE KILOMETRES :-
(i) BG Routes :-
‘A’ Route (Churchgate – Surat) : 268.89 Kms.
‘C’ Route (Churchgate - Virar) : 60.25 Kms.
‘D-Spl’ Route (Udhna – Jalgaon) : 304.65 Kms
(ii) NG Routes :-
NG Section (Bilimora - Waghai) : 62.72 Kms.
2. TRACK KILOMETRES:-
(i) BG Routes :-
‘A’ Route (Mumbai
...
Read more...
Central – Surat) : 528.78 Kms.
‘C’ Route (Churchgate - Virar) : 175.24 Kms.
‘D-Spl’ Route (Udhna - Jalgaon) : 304.65 Kms.
‘D-Spl’ Route (Bhestan – Niyol) : 3.27 Kms.
TOTAL : 1011.94 Kms.
(ii) NG Routes :-
NG Section (Bilimora - Waghai) : 62.72 Kms.
3. No. of stations = 116
4. Coach holding = 2062 (AC – 520, Non-AC-1542)
5. Electric engine holding = 156 Locos
6. Level crossing = 288 (Manned-183) (Un-manned - 105)
7. Total no. of signal = 1154 Nos.
8. Total no. of Route Relay Interlocking = 18 Nos.
9. OHE Kms. = 472.5 Km (Suburban)
1037.66 Km. (Main Line)
10. Energy consumed = 284.47 lakh unit (Traction- Suburban)
354.59 lakh unit (Traction- Main Line)
42.89 lakh unit (Non-traction)

  
427 views
Dec 26 2014 (3:24PM)        

2 Chief Ministers demand extensn of Puru to JP   51351 blog posts   2883 correct pred (75% accurate)  
Re# 1320879-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
This is just WR.
Mumbai includes CR also..

  
410 views
Dec 26 2014 (3:28PM)        

Mumbai Meri Jaan*^   2295 blog posts   1052 correct pred (59% accurate)  
Re# 1320879-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Thanks Edited
Page#    1435 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Feb 8, 2015
Trains with ARP 30 Dep on: Sat Feb 28, 2015
Trains with ARP 60 Dep on: Mon Mar 30, 2015

  
  

Rail News

New Trains

Site Announcements

  • Entry# 1350204
    Jan 24 (01:07PM)


  • Entry# 1331658
    Jan 05 (10:04PM)


    -@all members: Some clarification regarding the Archival mechanism. When a blog is actively Archived either by an FM or due to Objections, that means that the topic is CLOSED, until it is explicitly reopened. . Bloggers are FORBIDDEN to post "Replies" to Archived topics as a brand NEW BLOG ENTRY. Such an activity makes...
  • Entry# 1328652
    Jan 02 (11:00PM)


    It has been observed that a dozen or so IRI Admins/Members are very active on Facebook, Whatsapp, Twitter, and other social networks, engaging in abusive and non-decorous conduct. These members thereafter, bring the politics of these OTHER SOCIAL networks into IRI, disrupting this Forum. .for While IRI is strictly moderated, the same...
  • Entry# 1315252
    Dec 21 2014 (11:37AM)


    Welcome to the new interface of IRI. While we are extremely reluctant to make any change to the UI, this change was necessitated by one overriding objective. UNIFIED SEARCH. From any page of IRI, whether in Desktop or Mobile, you should be able to search virtually ANYTHING in IRI. . Towards the...
  • Entry# 1280540
    Nov 19 2014 (01:08AM)


    Some enhancements have been made to SuperSearch within the Forum, PNR & News tabs: . 1. Previously, within the PNR Forum, phrase/word searches were not picking up results from PNR replies. Also, the various PNR Status searches were not working. Now all of the above have been fixed. Any word/phrase searches should...
  • Entry# 1273754
    Nov 11 2014 (07:01PM)


    In the earlier days of IRI, the grounds for Deletion of Blogs were very clear-cut. Offensive/abusive posts were promptly removed. As the Site/Forum matures, it is time for these policies to be upgraded. . Over the past few months, the number of controversies have soared. On the face of it, the controversial...
Scroll to Top
Scroll to Bottom


Go to Mobile site