Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Mar 29, 2017 19:31:58 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Mar 29, 2017 19:31:58 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by This is my Fake ID during Break Time
Page#    39 Blog Entries  next>>
  
★  Rail Fanning
0 Followers
2452 views
Oct 24 2013 (19:35)   15484/Sikkim Mahananda Express
 

This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Entry# 886077            Tags   Past Edits
SikkimMahananda Exp with Siliguri WDP-4 Loco speeding up after clearing Barsoi Loop..

  
1164 views
Oct 24 2013 (19:43)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 886077-1            Tags   Past Edits
keep urself busy counting the No. of coaches as the ultra long rake of Mahananda speeds past the Barsoi curve

  
2296 views
Oct 26 2013 (17:49)
14801 Jodhpur Indore Express via Q Track^~   79688 blog posts   5093 correct pred (78% accurate)
Re# 886077-2            Tags   Past Edits
#electrification and #ohe poles are visible .
Take a star This is my Fake ID during Break Time
  
★★★  General Travel
0 Followers
3350 views
Oct 25 2013 (09:54)   NED/Hazur Sahib Nanded (4 PFs)
 

HUM TUM~   601 blog posts   259 correct pred (62% accurate)
Entry# 886431            Tags   Past Edits
Escalator being installed at Hazur Sahib Nanded (NED) at PF 4.......
Pic.courtesy:NCN FB page........

1 posts are hidden.

  
1389 views
Oct 25 2013 (10:47)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 886431-2            Tags   Past Edits
Sir I've a question...I can see the Escalator is being installed drect under Khula Aasmaan..now this is a highly sensitive electronic equipment..is this OK to install this under such condition? I think proper platform shed should be there before installation

  
1178 views
Oct 25 2013 (11:26)
abhinavp   1519 blog posts
Re# 886431-3            Tags   Past Edits
Yes indeed, poor planning i guess

  
1240 views
Oct 25 2013 (11:27)
VijayAditya*   1619 blog posts   29 correct pred (69% accurate)
Re# 886431-4            Tags   Past Edits
It was installed similarly even at Secunderabad, a cover was fitted simultaneously..At the end, it would be with a roof on top!

  
1145 views
Oct 25 2013 (19:49)
HUM TUM~   601 blog posts   259 correct pred (62% accurate)
Re# 886431-5            Tags   Past Edits
yes sir,cover will be fixed simultaneously as soon as the installation of whole escalator will be finished.

15 posts are hidden.
  
General Travel
0 Followers
2005 views
Oct 25 2013 (13:15)   12647/Kongu SF Express | YPR/Yesvantpur Junction (6 PFs)
 

यन्त्रविन्यासYantravinyas   19467 blog posts   427 correct pred (89% accurate)
Entry# 886676            Tags   Past Edits
Admin allow to create this chain :::::::Yesvantpur to Roorkee
12647 YPR to NZM
18477 NZM to RK

  
1479 views
Oct 25 2013 (13:24)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 886676-1            Tags   Past Edits
ARE u mad? 20 mts buffer time in IR how can it be reliable?

1 posts are hidden.

  
1505 views
Oct 25 2013 (18:26)
यन्त्रविन्यासYantravinyas   19467 blog posts   427 correct pred (89% accurate)
Re# 886676-3            Tags   Past Edits
18477 comes late. 12647 is always bang on time. The important factor is that both have same route from BINA to NZM

4 posts are hidden.
  
★★  Rail Fanning
0 Followers
1906 views
Oct 24 2013 (23:42)   12461/Mandore Superfast Express | DEC/Delhi Cantt. (5 PFs)
 

Mohd Arif   14975 blog posts   1465 correct pred (80% accurate)
Entry# 886282            Tags   Past Edits
Mandore Express at delhi cant PF#1

7 posts are hidden.

  
1198 views
Oct 25 2013 (12:54)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 886282-8            Tags   Past Edits
its looking very modern station like anand vihar terminal but more spacious

  
1127 views
Oct 25 2013 (18:17)
Mohd Arif   14975 blog posts   1465 correct pred (80% accurate)
Re# 886282-9            Tags   Past Edits
yes, mujhe bhe kafi bdhiya dikha station ,kafi clean tha nd rush bhe kafi kam tha station pe
  
General Travel
0 Followers
5863 views
Oct 25 2013 (14:40)   12214/Delhi Sarai Rohilla - Yesvantpur AC Duronto Express
 

Venkat వెంకట్   13683 blog posts   13 correct pred (87% accurate)
Entry# 886779            Tags   Past Edits
Except festival times mostly running empty. Think they should follow SR
2013-10-28, Mon Avbl 230 Avbl 51 Avbl 5 34m old Refresh
2013-11-04, Mon WL# 50 WL24 WL# 1 34m old Refresh
2013-11-11, Mon WL# 30WL14 WL# 4 34m old Refresh
2013-11-18, Mon Avbl 330 Avbl 45 Avbl 14 34m old Refresh
...
more...

2013-11-25, Mon Avbl 376 Avbl 80 Avbl 16 34m old Refresh
2013-12-02, Mon Avbl 423 Avbl 66 Avbl 13 34m old Refresh
2013-12-09, Mon Avbl 461 Avbl 78 Avbl 8 1h 36m old Refresh
2013-12-16, Mon Avbl 455 Avbl 87 Avbl 15 1h 36m old Refresh
2013-12-23, Mon Avbl 482 Avbl 85 Avbl 16

2 posts are hidden.

  
1351 views
Oct 25 2013 (14:44)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 886779-3            Tags   Past Edits
quite strange Bangalore Delhi Duronto is flop..may be terminal should be changed from Sarai Rohilla to New Delhi/Anand Vihar/Nizamuddin/Chandni Chowk

2 posts are hidden.

  
1365 views
Oct 25 2013 (14:48)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 886779-6            Tags   Past Edits
why are u referring whether tickets in december end are booked or not...???
this is not a valid way to judge popularity of a weekly train

1 posts are hidden.

  
1435 views
Oct 25 2013 (14:50)
Venkat వెంకట్   13683 blog posts   13 correct pred (87% accurate)
Re# 886779-8            Tags   Past Edits
My dear please check the availability of next week
2013-10-28, Mon Avbl 230 Avbl 51 Avbl 5

  
1354 views
Oct 25 2013 (16:12)
22691 Making of an AC Exp*^   2235 blog posts   9 correct pred (90% accurate)
Re# 886779-9            Tags   Past Edits
And also Days of run is affecting it. If it starts from YPR on Friday evening and from NDLS/NZM on Sunday Evening with the existing timing would be perfect. Not many people prefer reaching Bangalore on Wednesday!!

74 posts are hidden.
  
General Travel
0 Followers
1479 views
Oct 25 2013 (02:37)   12951/Mumbai Central - New Delhi Rajdhani Express
 

Himanshu Shekhar   168 blog posts   218 correct pred (74% accurate)
Entry# 886321            Tags   Past Edits
Why this train halts at kota jn for 10 minutes ?? Whereas only 2 seats are reserved from kota!

6 posts are hidden.

  
1106 views
Oct 25 2013 (15:16)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 886321-8            Tags   Past Edits
water filling in all the coaches require @ least 15 mts,it cant be done in 10 mts
  
★★★  Rail Fanning
9 Followers
11093 views
Oct 23 2013 (17:22)   RCF/Kapurthala Rail Coach Factory (1 PFs)
 

Metre Gauge*^~   3856 blog posts   13419 correct pred (75% accurate)
Entry# 885006            Tags   Past Edits
A Memorable visit to RCF, Kapurthala.
I apologise firstly to all of you for late reporting as i'm on constant travel. I can't post pics right now, so requesting other visitors to put pics and their experiences here.
1st Part
Necessity is the mother of invention is a well known saying. But sometimes passion delivers a lot in inventing new ways of living life.
...
more...
Here some of us felt the urge to have some fun together and what better a place can be than a one raiway-related. Mr. PK Venkatramani was kind enough to take the responsibility of conducting this visit and his endeavour bore fruit as SBI, Kapurthala Branch informed him of a confirmed visit to RCF. So accordingly many of us put their wishes, but destiny always has the last word. After many permutations and combinations, the lucky few viz pkvenkatramani sir, pramodh sir, tejas, pradeep aka minti sir, Anand sir, Jayaraj sir, Shashank, Saikat sir, Joydeep, Ms Narayanan sir and Satinath Mondal and myself made there way to the 'Mecca of IR coaches' Railway Coach Factory, Kapurthala, on the 17th of October, 2013. Notable absentees were Dipyaman Basu, Wrik aka Souvik, Arkya Chatterjee, Sabyasachi Ghosh, Soumitra Chawathe, SVIyer, Zahaib, MNSudarshan and Kanishk aka Koushik who may have missed something very special.Someof us met at Delhi with Tejas, Shasank and Anand sir joining us at JRC. The people from Delhi boarded the Dhauadhar Express on 16th and reached Jalandhar the next morning. After getting refreshed we met the trio from Amritsar and got into a 4 coached Firozpur DEMU. As i have previously said destiny has its own way, we were astounded to find that a team from SBI, Kapurthala branch was there to welcome us at the station. We were still more awestruck as three AC cars were found waiting outside the station to take us through the factory. Once reaching the premises we got down from the car to find the GM and the Chief Project Manager of RCF greeting us. Feeling royal at this gesture, we got into the administrative building where we were shown the model township of RCF. A guide demonstrated the model and we were informed a lot about its geographical whereabouts. We were then warmly welcomed into the Main Conference Hall by the GM and other officials. Feeling too corporate, we took our seats around the round table. The GM formally welcomed us and he greeted everyone of us personally. He expressed his sheer happiness at our visit and added that he found it extremely unique that a group of 'rail loving people' have come here as every one visiting is either for commercial purpose or for administrative reasons. We were treated with coffee and a lot of light refreshments. He then showed us a video of the evolution of RCF which was very much interesting and colourful. Next we had a one to one discussion session with the GM where we all put forward several questions and he replied to them at his best. One notable question was from Pramodh sir regarding the same livery of LHB coaches. He solicited for a unique livery for Rajdhani coaches (the present red and grey) to be there and a separate livery for all other LHB coaches. The GM told that he would take up this matter personally and also took it down as a serious suggestion. Providing charging points at all the side berths and bays was another suggestion from our side which was noted down by him. After this we were to visit the workshops....
Contd......

44 posts are hidden.

  
1330 views
Oct 25 2013 (13:59)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 885006-55            Tags   Past Edits
is this the Saharsa Amtritsar Garib Rath Exp? its a fav train of our admin MKS**

1 posts are hidden.

  
1421 views
Oct 25 2013 (14:59)
أبواب تغلق*^~   6299 blog posts   6799 correct pred (63% accurate)
Re# 885006-57            Tags   Past Edits
a correction.. it's Amritsar-Saharsa "Janseva Express"

25 posts are hidden.
  
★★  Rail Fanning
0 Followers
5808 views
Oct 13 2013 (08:18)   12565/Bihar Sampark Kranti Express (PT)
 

Guest: 2a1ebdd2   show all posts
Entry# 875928            Tags   Past Edits
12565 Bihar Sampark Kranti Express crossing Jagjivan Bridge near Hajipur.. This is a single line bridge and trains have to wait at both sides at Sonpur and Hajipur hours for crossing in peak hours.. In this video you can see a new bridge being built on the river.. I posted the video of this bridge last month too.. The only change is an extra block has been placed in a months time..

26 posts are hidden.

  
3079 views
Oct 25 2013 (14:51)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 875928-29            Tags   Past Edits
yes rly line b/w Katareah Kursela is still single because it passes through Kosi River..
  
Info Update
0 Followers
2796 views
Oct 25 2013 (14:05)   12864/Yesvantpur - Howrah SF Express (PT)
 

sijuvrm   13 blog posts
Entry# 886735            Tags   Past Edits
Today's(25.10.2013) Train rescheduled to leave tomorrow(26.10.2013) at 7AM according to click here

  
2716 views
Oct 25 2013 (14:10)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 886735-1            Tags   Past Edits
its 100% official data...all other website(including IRI) will fetch data from NTES only...so 100%reliable data...likely to delay further depending upon arrival of 12863

  
2661 views
Oct 25 2013 (14:35)
sijuvrm   13 blog posts
Re# 886735-2            Tags   Past Edits
I have reservation in tmrw's 12684(7.35pm) so that means it will also get delayed based on arrival of next 12863 ??

  
2669 views
Oct 25 2013 (14:37)
This is my Fake ID during Break Time   81 blog posts   31 correct pred (70% accurate)
Re# 886735-3            Tags   Past Edits
yes definitely it'll be delayed as the flood situation hasnt improved @ all in A.P.
Page#    39 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Apr 8
Trains with ARP 15 Dep on: Thu Apr 13
Trains with ARP 30 Dep on: Fri Apr 28
Trains with ARP 120 Dep on: Thu Jul 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site