Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Fri Sep 19, 2014 11:20:14 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

Blog Posts by VENUS SERVICES
Page#    Showing 1 to 10 of 40 blog entries  next>>
Predictions: 35
confirm: 35
rac: 0
wl: 0
Journey: Sat Aug 16, 2014 @ 23:40
12927/Mumbai Central -Vadodara Express
Entry# 1188730
   Posted by: VENUS SERVICES   0 blog posts   17 correct pred (65% accurate)
PNR: 862-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >198   |   Charting: < 16:03   |   Similar PNRs
BCT/Mumbai Central   to   BRC/Vadodara Junction   |   393 km / 393 km
Original Status as of: Aug 15 2014 (5:08PM)
Passenger 1: Waitlist# 3 (Booking Status: W/L 37,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Aug 18 2014 (7:38AM)
Passenger 1: A1,30/Coach Position:20 (Booking Status: W/L 37,GNWL)
Chart PREPARED

333 views
Aug 17 2014 (5:53AM)        

Chhota Aadmi**   2136 blog posts   44460 correct pred (88% accurate)  
Re# 1188730-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
enjoy the #upgrade
Predictions: 39
confirm: 17
rac: 22
wl: 0
Journey: Tue Apr 15, 2014 @ 15:00
17018/Secunderabad - Rajkot Express
Entry# 1056107
   Posted by: VENUS SERVICES   0 blog posts   17 correct pred (65% accurate)
PNR: 460-xxxxxxx    |   AC 2-tier - 2A   |   Tot Seats: Avbl >46   |   Charting: < 09:06   |   Similar PNRs
SC/Secunderabad Junction   to   ADI/Ahmedabad Junction   |   1227 km / 1474 km
Original Status as of: Apr 13 2014 (2:17PM)
Passenger 1: Waitlist# 3 (Booking Status: W/L 30,GNWL)
Passenger 2: Waitlist# 4 (Booking Status: W/L 31,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 15 2014 (12:31PM)
Passenger 1: A1,43/Coach Position:4 (Booking Status: W/L 30,GNWL)
Passenger 2: A1,44/Coach Position:4 (Booking Status: W/L 31,GNWL)
Chart PREPARED

454 views
Apr 14 2014 (9:52PM)        

ShYaM VaRmA   2841 blog posts   37246 correct pred (84% accurate)  
Re# 1056107-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
#RACallocation 8
SC to ADI in AC-2
Latest Status as of: Today (9:38PM)
Passenger 1: RAC 8 (Booking Status: W/L 30,GNWL)
Passenger 2: Waitlist# 1 (Booking Status: W/L 31,GNWL)
Chart NOT Prepared
Predictions: 13
confirm: 0
rac: 0
wl: 13
Journey: Sat Apr 05, 2014 @ 19:15
12480/Suryanagari SF Express
Entry# 1046150
   Posted by: VENUS SERVICES   0 blog posts   17 correct pred (65% accurate)
PNR: 851-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >112   |   Charting: < 11:45   |   Similar PNRs
BRC/Vadodara Junction   to   JU/Jodhpur Junction   |   560 km / 942 km
Original Status as of: Apr 04 2014 (2:35PM)
Passenger 1: Waitlist# 111 (Booking Status: W/L 284,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 05 2014 (12:40PM)
Passenger 1: Can/Mod (Booking Status: W/L 284,GNWL)
Chart PREPARED

353 views
Apr 05 2014 (12:30PM)        

•••´º´•» रोहित कुमार सिंह «•´º´•••**   19575 blog posts   33504 correct pred (68% accurate)  
Re# 1046150-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
I feel it was an e-ticket which got cancelled on chart preparation.
Predictions: 7
confirm: 7
rac: 0
wl: 0
Journey: Tue Feb 25, 2014 @ 18:05
16734/Okha-Rameswaram Express
Entry# 1005392
   Posted by: VENUS SERVICES   0 blog posts   17 correct pred (65% accurate)
PNR: 822-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl 192   |   Charting: < 12:29   |   Similar PNRs
BRC/Vadodara Junction   to   KCG/Hyderabad Kacheguda   |   1227 km / 3236 km
Original Status as of: Feb 24 2014 (11:03AM)
Passenger 1: Waitlist# 12 (Booking Status: W/L 19,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Feb 24 2014 (8:33PM)
Passenger 1: S10,68 (Booking Status: W/L 19,CK)
Chart PREPARED

555 views
Feb 24 2014 (8:12PM)        

rdb**   20616 blog posts   252522 correct pred (77% accurate)  
Re# 1005392-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Charting IP...status disapp..
Predictions: 25
confirm: 21
rac: 0
wl: 4
Journey: Mon Feb 03, 2014 @ 22:30
12928/Vadodara - Mumbai Central Express
Entry# 983241
   Posted by: VENUS SERVICES   0 blog posts   17 correct pred (65% accurate)
PNR: 832-xxxxxxx    |   AC 2-tier - 2A   |   Tot Seats: Avbl 14   |   Charting: < 14:34   |   Similar PNRs
BRC/Vadodara Junction   to   BCT/Mumbai Central   |   393 km / 393 km
Original Status as of: Feb 03 2014 (3:06PM)
Passenger 1: Waitlist# 5 (Booking Status: W/L 5,CK)
Passenger 2: Waitlist# 6 (Booking Status: W/L 6,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Feb 03 2014 (9:17PM)
Passenger 1: Waitlist# 1 (Booking Status: W/L 5,CK)
Passenger 2: Waitlist# 2 (Booking Status: W/L 6,CK)
Chart PREPARED

497 views
Feb 03 2014 (6:16PM)        

Korbo Lorbo Jeetbo Re   367 blog posts   5517 correct pred (77% accurate)  
Re# 983241-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Might end as CKWL 1 & 2

1 posts - Mon Feb 03, 2014 - are hidden. Click to open.
Predictions: 44
confirm: 44
rac: 0
wl: 0
Journey: Wed Jan 29, 2014 @ 16:17
12010/Ahmedabad - Mumbai Central Shatabdi Express
Entry# 977132
   Posted by: VENUS SERVICES   0 blog posts   17 correct pred (65% accurate)
PNR: 844-xxxxxxx    |   Chair Car - CC   |   Tot Seats: Avbl >242   |   Charting: < 09:07   |   Similar PNRs
BRC/Vadodara Junction   to   BCT/Mumbai Central   |   393 km / 493 km
Original Status as of: Jan 28 2014 (11:34AM)
Passenger 1: Waitlist# 34 (Booking Status: W/L 106,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 29 2014 (3:54PM)
Passenger 1: Waitlist# 17 (Booking Status: W/L 106,GNWL)
Chart PREPARED

590 views
Jan 29 2014 (1:04PM)        

KMonIRI**   2173 blog posts   40683 correct pred (72% accurate)     Ph:+919330451736
Re# 977132-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.

1 posts - Wed Jan 29, 2014 - are hidden. Click to open.
Predictions: 17
confirm: 17
rac: 0
wl: 0
Journey: Thu Nov 21, 2013 @ 12:20
17017/Rajkot - Secunderabad Express
Entry# 911647
   Posted by: VENUS SERVICES   0 blog posts   17 correct pred (65% accurate)
PNR: 871-xxxxxxx    |   AC 2-tier - 2A   |   Tot Seats: Avbl 18   |   Charting: < 06:37   |   Similar PNRs
BRC/Vadodara Junction   to   SC/Secunderabad Junction   |   1127 km / 1474 km
Original Status as of: Nov 20 2013 (2:30PM)
Passenger 1: Waitlist# 2 (Booking Status: W/L 4,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Nov 20 2013 (9:31PM)
Passenger 1: Waitlist# 2 (Booking Status: W/L 4,CK)
Chart PREPARED

657 views
Nov 20 2013 (9:05PM)        

ºMr Suspectº**   3071 blog posts   19459 correct pred (90% accurate)  
Re# 911647-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Predictions: 35
confirm: 4
rac: 30
wl: 1
Journey: Mon Nov 11, 2013 @ 22:30
12928/Vadodara - Mumbai Central Express
Entry# 901907
   Posted by: VENUS SERVICES   0 blog posts   17 correct pred (65% accurate)
PNR: 850-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >194   |   Charting: < 14:34   |   Similar PNRs
BRC/Vadodara Junction   to   BCT/Mumbai Central   |   393 km / 393 km
Original Status as of: Nov 10 2013 (2:12PM)
Passenger 1: Waitlist# 6 (Booking Status: W/L 106,GNWL)
Passenger 2: Waitlist# 7 (Booking Status: W/L 107,GNWL)
Passenger 3: Waitlist# 8 (Booking Status: W/L 108,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Nov 11 2013 (7:55PM)
Passenger 1: RB4 47/Coach Position:6 (Booking Status: W/L 106,GNWL)
Passenger 2: RB4 55/Coach Position:6 (Booking Status: W/L 107,GNWL)
Passenger 3: RB4 55/Coach Position:6 (Booking Status: W/L 108,GNWL)
Chart PREPARED

443 views
Nov 11 2013 (1:57PM)        

maheshsunda**   3622 blog posts   27739 correct pred (70% accurate)  
Re# 901907-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
#RACAllocation
30 in 3A end to end.
Predictions: 15
confirm: 15
rac: 0
wl: 0
Journey: Wed Oct 16, 2013 @ 01:55
12833/Ahmedabad- Howrah SF Express
Entry# 877884
   Posted by: VENUS SERVICES   0 blog posts   17 correct pred (65% accurate)
PNR: 850-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl 32   |   Charting: < 19:57   |   Similar PNRs
BRC/Vadodara Junction   to   RIG/Raigarh   |   1402 km / 2088 km
Original Status as of: Oct 15 2013 (4:37PM)
Passenger 1: Waitlist# 2 (Booking Status: W/L 2,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 16 2013 (5:08PM)
Passenger 1: Waitlist# 2 (Booking Status: W/L 2,CK)
Chart PREPARED

547 views
Oct 15 2013 (8:00PM)        

DJ™   4823 blog posts   63316 correct pred (71% accurate)  
Re# 877884-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.

1 posts - Tue Oct 15, 2013 - are hidden. Click to open.
Predictions: 51
confirm: 31
rac: 19
wl: 1
Journey: Wed Jul 17, 2013 @ 18:45
12479/Suryanagari SF Express
Entry# 806855
   Posted by: VENUS SERVICES   0 blog posts   17 correct pred (65% accurate)
PNR: 244-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >179   |   Charting: < 11:42   |   Similar PNRs
JU/Jodhpur Junction   to   BDTS/Mumbai Bandra Terminus   |   942 km / 942 km
Original Status as of: Jul 13 2013 (4:54PM)
Passenger 1: Waitlist# 47 (Booking Status: W/L 149,GNWL)
Passenger 2: Waitlist# 48 (Booking Status: W/L 150,GNWL)
Passenger 3: Waitlist# 49 (Booking Status: W/L 151,GNWL)
Passenger 4: Waitlist# 50 (Booking Status: W/L 152,GNWL)
Passenger 5: Waitlist# 51 (Booking Status: W/L 153,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jul 17 2013 (3:36PM)
Passenger 1: RB1 47/Coach Position:16 (Booking Status: W/L 149,GNWL)
Passenger 2: RB1 47/Coach Position:16 (Booking Status: W/L 150,GNWL)
Passenger 3: Can/Mod (Booking Status: W/L 151,GNWL)
Passenger 4: RB1 55/Coach Position:16 (Booking Status: W/L 152,GNWL)
Passenger 5: RB1 55/Coach Position:16 (Booking Status: W/L 153,GNWL)
Chart PREPARED

736 views
Jul 16 2013 (4:49PM)        

অনুপম**   4342 blog posts   36300 correct pred (85% accurate)  
Re# 806855-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
#RACAllocation 18 in 3A End to End.
Page#    40 blog entries  next>>

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Sep 29, 2014
Trains with ARP 30 Dep on: Sun Oct 19, 2014
Trains with ARP 60 Dep on: Tue Nov 18, 2014

  
  

Rail News

  • Sreedharan inspects Kochi Metro alignment  News Entry# 194636
    by: Ravi Prajapati**  Today (11:19AM)


    Kochi: E Sreedharan, Principal Advisor Delhi Metro Rail Corporation (DMRC) yesterday inspected the Metro construction alignment from Maharaja’s College up to Aluva with special focus on repairs to the road surface.
    The ‘Metro man’ was generally satisfied with the road repairs...
  • Rail stocks up on Indo-China MoU to extend co-operation  News Entry# 194635
    by: Ravi Prajapati**  Today (11:19AM)


    Indian Prime Minister Narendra Modi and Chinese President Xi Jinping have signed memorandum of understanding (MoU) on extending co-operation in rail, including agreement for new Mansarovar route
    Shares of rail stocks surged 5-7 percent intraday Thursday riding on an upgrade as...
  • सेमी हाईस्पीड ट्रेन चलाने के लिए रेलवे ट्रैक होंगे दुरुस्त  News Entry# 194634
    by: অনুপম**  Today (11:17AM)


    दिल्ली-फरीदाबाद-आगरा रेल मार्ग पर सेमी हाईस्पीड ट्रेन चलाने की योजना में आड़े आ रही बाधाएं जल्द दूरी होंगी। रेलवे ट्रैक किनारे सुविधा अनुरूप बनाए गए अवैध रास्तों को जल्द बंद किया जाएगा। ट्रैक किनारे जाली लगाई जाएंगी, ताकि लोग और पशु न जा सकें। केंद्र सरकार ने पिछले साल रेल...
  • ब्रिटिशकाल की मीटरगेज रेल लाइन के दिन फिरे  News Entry# 194633
    by: অনুপম**  Today (11:14AM)


    (वृंदावन): आखिरकार अंग्रेजों के जमाने में मथुरा और वृंदावन के बीच बिछी मीटरगेज (छोटी रेल लाइन) के दिन फिर रहे हैं। रेलवे महकमा इसका आधुनिकीकरण करा रहा है। यह कार्य पूरा होने के बाद इस पर दौड़ने वाली रेल बस की रफ्तार बढ़ सकती है। लोहे और लकड़ी की बिछीं...
  • विजिलेंस के छापे में फंसे दूरंतो, शताब्दी के टीटीई  News Entry# 194632
    by: Saurabh*^  Today (10:54AM)


    इलाहाबाद (ब्यूरो)। यात्रियों से वसूली की शिकायतों पर उत्तर मध्य रेलवे की विजिलेंस ने दूरंतो एक्सप्रेस और शताब्दी एक्सप्रेस में छापेमारी की है। दोनों ट्रेनों से एक-एक टीटीई को 500-500 रुपये की नोटों के साथ पकड़ा है। शिकायतों के कारण विजिलेंस टीम ने दोनों टीटीई के लिए जाल बिछाया था।...

New Trains

Site Announcements

  • Entry# 1209120
    Sep 07 (03:36PM)


    -@all members: This is an IMPORTANT reminder to all members that NO MONETARY transactions are permitted within the scope of IRI. Members are NOT ALLOWED to borrow/lend money to each other, book rail tickets for each other, introduce themselves as "IRI Members/Admins" and solicit monetary favours, asking to book rail tickets...
  • Entry# 1204822
    Sep 02 (07:04PM)


    With the roll out of new TTs, we are introducing 3 new enhancements: . 1. "To Be Introduced" trains: As the title implies, Admins may add Trains that are announced in the Budget and Not yet introduced, to this list, with WHATEVER tentative TT is available, and whatever sketchy or vague information...
  • Entry# 1193896
    Aug 21 (10:23PM)


    The new IRI logo can now be seen. Actually, we are reluctant to make changes to the logo (for the sake of recognizability and consistency), but some very slight modification was done this time. Here is the post-facto rationalization of the logo: . 1. The Chakra is the Wheel symbolizing Transportation/Travel which...
  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
Scroll to Top
Scroll to Bottom