Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun May 28, 2017 08:50:16 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun May 28, 2017 08:50:16 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by esamrat
Page#    9 Blog Entries  
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Sat Dec 21, 2013
Class: AC 2-tier - 2A
Travel: CLT/Kozhikode Main (Calicut)   to   PNVL/Panvel Junction
04093/Bandra Terminus - New Delhi Jansadharan Special (UnReserved)
Entry# 940989
 

Posted by: esamrat   5 blog posts
PNR: 481-xxxxxxx   |   Similar PNRs
Posted Status as of: Dec 20 2013 (23:11)
Passenger 1: A3,44 (Booking Status: RAC 6,GNWL)
Passenger 2: A3,49 (Booking Status: RAC 7,GNWL)
Chart PREPARED

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Dec 21 2013 (01:22)
Passenger 1: A3,44 (Booking Status: RAC 6,GNWL)
Passenger 2: A3,49 (Booking Status: RAC 7,GNWL)
Chart PREPARED

  
741 views
Dec 20 2013 (23:12)
esamrat   5 blog posts
Re# 940989-1            Tags   Past Edits
What type of seat no. is A3/49. I thought only 46 seats are avbl for 2AC coach

  
792 views
Dec 20 2013 (23:15)
JOSH*^~   13485 blog posts   15239 correct pred (75% accurate)
Re# 940989-2            Tags   Past Edits
LHB coach has 52 berths in a 2A coach..
  
Predictions: 36
confirm: 27
rac: 0
wl: 9
Journey: Sat Dec 21, 2013 @ 02:05
Class: AC 2-tier - 2A   |   Tot Seats: Avbl >28
Travel: CLT/Kozhikode Main (Calicut)   to   PNVL/Panvel Junction   |   1050 km / 2843 km
12431/Thiruvananthapuram Central - Hazrat Nizamuddin Rajdhani Express
Entry# 895571
 

Posted by: esamrat   5 blog posts
PNR: 460-xxxxxxx   |   Similar PNRs
Posted Status as of: Nov 03 2013 (17:51)
Passenger 1: Waitlist# 29 (Booking Status: W/L 47,PQWL)
Passenger 2: Waitlist# 30 (Booking Status: W/L 48,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Dec 20 2013 (18:37)
Passenger 1: Waitlist# 5 (Booking Status: W/L 47,PQWL)
Passenger 2: Waitlist# 6 (Booking Status: W/L 48,PQWL)
Chart PREPARED

3 posts - Wed Nov 27, 2013

  
1723 views
Nov 27 2013 (20:30)
♥♡♥अविनाश♥♡♥   1372 blog posts   9192 correct pred (89% accurate)
Re# 895571-4            Tags   Past Edits
If ur name is on the chart, then coach attented will look after it.
Dont worry.

  
1612 views
Nov 27 2013 (21:29)
sys tem~   8221 blog posts   75727 correct pred (76% accurate)
Re# 895571-5            Tags   Past Edits
there will be no problem whatsoever...there will be many co-passenger also boarding from Kozikode too...also the coach attendent will take care of opening the doors and providing the bedding ..so dont worry and chill..

  
1353 views
Dec 03 2013 (14:12)
esamrat   5 blog posts
Re# 895571-6            Tags   Past Edits
Still waitlist 17/18.. worried whether getting confirmed or not!!!

  
1126 views
Dec 10 2013 (11:42)
esamrat   5 blog posts
Re# 895571-7            Tags   Past Edits
I have to apply for HO quota for this journey. Please tell me the procedure. Since I'm boarding from an intermediate station, where should I send my official letter?

  
989 views
Dec 20 2013 (17:13)
♥♡♥अविनाश♥♡♥   1372 blog posts   9192 correct pred (89% accurate)
Re# 895571-8            Tags   Past Edits
DRM office i guess.
  
Predictions: 25
confirm: 3
rac: 2
wl: 20
Journey: Sat Oct 20, 2012 @ 22:15
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 36
Travel: HW/Haridwar   to   BDC/Bandel Junction   |   1471 km / 1562 km
13010/Doon Express (PT)
Entry# 557047
 

Posted by: esamrat   5 blog posts
PNR: 244-xxxxxxx   |   Similar PNRs
Posted Status as of: Oct 20 2012 (13:58)
Passenger 1: Waitlist# 12 (Booking Status: W/L 125,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 20 2012 (23:07)
Passenger 1: BE1,64/Coach Position:7 (Booking Status: W/L 125,RLGN)
Chart PREPARED

  
1710 views
Oct 20 2012 (23:00)
DB*^~   33537 blog posts   224050 correct pred (71% accurate)
Re# 557047-1            Tags   Past Edits
  
0 Followers
364 views
Jun 19 2012 (14:19)  
 

esamrat   5 blog posts
Entry# 458595            Tags   Past Edits
Can anybody give information about Howrah Rail Yatri Niwas, i.e. how to book in advance etc.
  
Predictions: 33
confirm: 23
rac: 10
wl: 0
Journey: Wed Jun 20, 2012 @ 17:15
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 97   |   Charting: < 13:15
Travel: CSTM/Mumbai Chhatrapati Shivaji Terminus   to   HWH/Howrah Junction   |   1965 km / 1965 km
12261/Mumbai CST - Howrah AC Duronto Express
Entry# 455028
 

Posted by: esamrat   5 blog posts
PNR: 830-xxxxxxx   |   Similar PNRs
Posted Status as of: Jun 15 2012 (12:43)
Passenger 1: Waitlist# 10 (Booking Status: W/L 50,GNWL)
Passenger 2: Waitlist# 11 (Booking Status: W/L 51,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 20 2012 (14:09)
Passenger 1: A3,17/Coach Position:2 (Booking Status: W/L 50,GNWL)
Passenger 2: A3,18/Coach Position:2 (Booking Status: W/L 51,GNWL)
Chart PREPARED
  
Predictions: 13
confirm: 13
rac: 0
wl: 0
Journey: Wed Jun 27, 2012 @ 08:20
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 65   |   Charting: < 20:00
Travel: HWH/Howrah Junction   to   CSTM/Mumbai Chhatrapati Shivaji Terminus   |   1965 km / 1965 km
12262/Howrah - Mumbai CST AC Duronto Express
Entry# 452429
 

Posted by: esamrat   5 blog posts
PNR: 611-xxxxxxx   |   Similar PNRs
Posted Status as of: Jun 12 2012 (18:17)
Passenger 1: RAC 15 (Booking Status: W/L 4,GNWL)
Passenger 2: RAC 16 (Booking Status: W/L 5,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jul 01 2012 (18:19)
Passenger 1: A1,20 (Booking Status: W/L 4,GNWL)
Passenger 2: A1,22 (Booking Status: W/L 5,GNWL)
Chart PREPARED
  
Predictions: 19
confirm: 18
rac: 1
wl: 0
Journey: Sat Mar 24, 2012 @ 16:50
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 6   |   Charting: < 12:48
Travel: ABR/Abu Road   to   BDTS/Bandra Terminus   |   668 km / 1108 km
19708/Aravali Express (PT)
Entry# 355456
 

Posted by: esamrat   5 blog posts
PNR: 266-xxxxxxx   |   Similar PNRs
Posted Status as of: Feb 22 2012 (15:54)
Passenger 1: Waitlist# 19 (Booking Status: W/L 27,RLGN)
Passenger 2: Waitlist# 20 (Booking Status: W/L 28,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 23 2012 (14:12)
Passenger 1: Can/Mod (Booking Status: W/L 27,RLGN)
Passenger 2: Can/Mod (Booking Status: W/L 28,RLGN)
Chart NOT Prepared
  
Predictions: 17
confirm: 16
rac: 0
wl: 1
Journey: Thu Mar 22, 2012 @ 07:05
Class: Sleeper - SL   |   Tot Seats: Avbl 54
Travel: ADI/Ahmedabad Junction   to   ABR/Abu Road   |   187 km / 2283 km
16210/Mysuru - Ajmer Express (PT)
Entry# 355435
 

Posted by: esamrat   5 blog posts
PNR: 433-xxxxxxx   |   Similar PNRs
Posted Status as of: Feb 22 2012 (15:37)
Passenger 1: Confirmed (Booking Status: S8,40,GN)
Passenger 2: Waitlist# 68 (Booking Status: W/L 81,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 20 2012 (18:13)
Passenger 1: Can/Mod (Booking Status: S8,40,GN)
Passenger 2: Can/Mod (Booking Status: W/L 81,RLGN)
Chart NOT Prepared
  
Predictions: 16
confirm: 15
rac: 0
wl: 1
Journey: Wed Mar 21, 2012 @ 20:55
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 24
Travel: BDTS/Bandra Terminus   to   ABR/Abu Road   |   668 km / 1108 km
19707/Aravali Express (PT)
Entry# 355433
 

Posted by: esamrat   5 blog posts
PNR: 855-xxxxxxx   |   Similar PNRs
Posted Status as of: Feb 22 2012 (15:36)
Passenger 1: Waitlist# 12 (Booking Status: W/L 20,PQWL)
Passenger 2: Waitlist# 13 (Booking Status: W/L 21,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 20 2012 (08:10)
Passenger 1: Can/Mod (Booking Status: W/L 20,PQWL)
Passenger 2: Can/Mod (Booking Status: W/L 21,PQWL)
Chart NOT Prepared
Page#    9 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Jun 7
Trains with ARP 15 Dep on: Mon Jun 12
Trains with ARP 30 Dep on: Tue Jun 27
Trains with ARP 120 Dep on: Mon Sep 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site