Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Mar 24, 2017 21:58:58 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Mar 24, 2017 21:58:58 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by kalyanchakravarthi1407
Page#    6 Blog Entries  
  
Predictions: 40
confirm: 40
rac: 0
wl: 0
Journey: Sun Jan 13, 2013 @ 19:35
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 26   |   Charting: < 15:15
Travel: YPR/Yesvantpur Junction   to   VSKP/Visakhapatnam Junction   |   1079 km / 1960 km
12864/Yesvantpur - Howrah SF Express (PT)
Entry# 545326
 

Posted by: kalyanchakravarthi1407   3 blog posts   87 correct pred (75% accurate)
PNR: 414-xxxxxxx    |   Similar PNRs
Posted Status as of: Oct 08 2012 (10:36)
Passenger 1: Confirmed (Booking Status: B1,2,PQ)
Passenger 2: Waitlist# 2 (Booking Status: W/L 2,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 13 2013 (13:05)
Passenger 1: Confirmed (Booking Status: B1,2,PQ)
Passenger 2: Can/Mod (Booking Status: W/L 2,PQWL)
Chart NOT Prepared

  
842 views
Jan 13 2013 (13:01)
DB*^~   33537 blog posts   224048 correct pred (71% accurate)
Re# 545326-1            Tags   Past Edits
Passenger 1: Confirmed (Booking Status: B1,2,PQ)
Passenger 2: Can/Mod (Booking Status: W/L 2,PQWL)
Chart NOT Prepared
  
Predictions: 23
confirm: 22
rac: 0
wl: 1
Journey: Thu Jul 05, 2012 @ 15:00
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 18
Travel: BZA/Vijayawada Junction   to   ERS/Ernakulam Junction (South)   |   1062 km / 3034 km
12626/Kerala Express (PT)
Entry# 454616
 

Posted by: kalyanchakravarthi1407   3 blog posts   87 correct pred (75% accurate)
PNR: 243-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Jun 14 2012 (22:08)
Passenger 1: Waitlist# 6 (Booking Status: W/L 8,RLGN)
Passenger 2: Waitlist# 7 (Booking Status: W/L 9,RLGN)
Passenger 3: Waitlist# 8 (Booking Status: W/L 10,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jul 03 2012 (18:59)
Passenger 1: Can/Mod (Booking Status: W/L 8,RLGN)
Passenger 2: Can/Mod (Booking Status: W/L 9,RLGN)
Passenger 3: Can/Mod (Booking Status: W/L 10,RLGN)
Chart NOT Prepared

  
793 views
Jun 26 2012 (21:38)
kalyanchakravarthi1407   3 blog posts   87 correct pred (75% accurate)
Re# 454616-1            Tags   Past Edits
The status is the same from the date of booking..Should I go for tatkal? What is Tot seats Avbl>18 mean?

  
701 views
Jul 01 2012 (18:16)
kalyanchakravarthi1407   3 blog posts   87 correct pred (75% accurate)
Re# 454616-2            Tags   Past Edits
The status is the same from the date of booking..Should I go for tatkal? What is Tot seats Avbl>18 mean?

  
708 views
Jul 01 2012 (18:17)
Guest: 7fc96cb5   show all posts
Re# 454616-3            Tags   Past Edits
go for tatkal.
  
Predictions: 19
confirm: 19
rac: 0
wl: 0
Journey: Sun Jul 08, 2012 @ 15:45
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 18
Travel: ERS/Ernakulam Junction (South)   to   BZA/Vijayawada Junction   |   1062 km / 3034 km
12625/Kerala Express (PT)
Entry# 454618
 

Posted by: kalyanchakravarthi1407   3 blog posts   87 correct pred (75% accurate)
PNR: 485-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Jun 14 2012 (22:09)
Passenger 1: Waitlist# 6 (Booking Status: W/L 10,PQWL)
Passenger 2: Waitlist# 7 (Booking Status: W/L 11,PQWL)
Passenger 3: Waitlist# 8 (Booking Status: W/L 12,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jul 12 2012 (15:58)
Passenger 1: Can/Mod (Booking Status: W/L 10,PQWL)
Passenger 2: Can/Mod (Booking Status: W/L 11,PQWL)
Passenger 3: Can/Mod (Booking Status: W/L 12,PQWL)
Chart PREPARED
  
Predictions: 10
confirm: 1
rac: 3
wl: 6
Journey: Fri Apr 06, 2012 @ 17:25
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 97   |   Charting: < 14:45
Travel: VSKP/Visakhapatnam Junction   to   SC/Secunderabad Junction   |   700 km / 709 km
12727/Godavari SF Express
Entry# 387141
 

Posted by: kalyanchakravarthi1407   3 blog posts   87 correct pred (75% accurate)
PNR: 660-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Apr 02 2012 (22:25)
Passenger 1: Waitlist# 22 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 23 (Booking Status: W/L 65,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 05 2012 (20:40)
Passenger 1: Can/Mod (Booking Status: W/L 64,GNWL)
Passenger 2: Can/Mod (Booking Status: W/L 65,GNWL)
Chart NOT Prepared
  
0 Followers
4360 views
Mar 27 2012 (23:43)   12515/Thiruvananthapuram Central - Guwahati SF Express (PT)
 

kalyanchakravarthi1407   3 blog posts   87 correct pred (75% accurate)
Entry# 382314            Tags   Past Edits
The train was the dirtiest, disorganized one that I have traveled. The coaches were full of cockroaches, were never cleaned recently, too many unauthorized persons in the reserved coaches including the 3 ac coach. I traveled this Sunday from ERN-VSKP and it was a horrible experience. The TTE was busy making money on a full train allotting berths to passengers who were traveling short distances. NF railway should be ashamed of such an experience. The coach attenders were indisciplined and they were least bothered abt the passengers. Shame on all the sectors on which the train runs. The only good thing was that thebtrain was on time and rest else was hell

  
3968 views
Mar 27 2012 (23:44)
Guest: c33b4e5   show all posts
Re# 382314-1            Tags   Past Edits
Hmm, nothing new. You are just another scapegoat of this train.
But,I like the train for its speed and food.

  
4075 views
Mar 29 2012 (12:46)
Guest: 7443df3a   show all posts
Re# 382314-2            Tags   Past Edits
Long distance trains !! All these GHY-South bound trains needs LHB to maintain them in good condition.
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Wed May 23, 2012 @ 20:10
Class: Sleeper - SL   |   Tot Seats: Avbl 297
Travel: DKO/Devakottai Road   to   MS/Chennai Egmore   |   496 km / 665 km
16102/Boat Mail(Rameswaram Express)
Entry# 378700
 

Posted by: kalyanchakravarthi1407   3 blog posts   87 correct pred (75% accurate)
PNR: 443-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 22 2012 (17:38)
Passenger 1: Confirmed (Booking Status: RAC 21,GNWL)
Passenger 2: Confirmed (Booking Status: RAC 22,GNWL)
Passenger 3: Confirmed (Booking Status: RAC 23,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 23 2012 (20:00)
Passenger 1: Can/Mod (Booking Status: RAC 21,GNWL)
Passenger 2: Can/Mod (Booking Status: RAC 22,GNWL)
Passenger 3: Can/Mod (Booking Status: RAC 23,GNWL)
Chart PREPARED
Page#    6 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Apr 3
Trains with ARP 15 Dep on: Sat Apr 8
Trains with ARP 30 Dep on: Sun Apr 23
Trains with ARP 120 Dep on: Sat Jul 22

  
  

Rail News

  • Steps taken by Railways for Security and Safety  News Entry# 297501
    by: rdb*^  Today (21:40)


    Policing on Railways being a State subject, prevention of crime, registration of cases, their investigation and maintenance of law & order in Railway premises as well as on running trains and security of railway tracks, tunnels & bridges are the statutory responsibility of the State Governments, which they discharge through Government...
  • Easy Access for Persons with Disabilities in Rail Compartments and Toilets  News Entry# 297500
    by: rdb*^  Today (21:39)


    In order to provide additional facilities for Persons with Disabilities (PWDs), Indian Railways has developed designs of coaches having a compartment for PWDs as well as additional features in the lavatories. Some of these features are given below:
    ·...
  • Ro-Ro Freight Service in Indian Railways  News Entry# 297499
    by: rdb*^  Today (21:39)


    Roll-on-Roll-off (RO-RO) service was initially introduced on Konkan Railway during the year 1999. Since then, the service is running on Konkan Railway on Diesel route. On electrified routes, there are operational constraints for running of Ro-Ro service due to Over Head Equipment (OHE). However, during the recent past, trial run of...
  • POS Machines at Rail Reservation Counters  News Entry# 297498
    by: rdb*^  Today (21:38)


    With a view to promoting cashless transaction, it has been decided to install 10,000 Point of Sale (POS) machines in association with State Bank of India at various locations of Indian Railways including ticket counters of Indian Railways.
    ...
  • End to Train Telemetry (EoTT) Device in Trains  News Entry# 297497
    by: rdb*^  Today (21:38)


    The Dedicated Freight Corridor Corporation of India Ltd. (DFCCIL) is an infrastructure provider. End to Train Telemetry (EoTT) device is an alternative of running trains without guard on an exclusive freight corridor.
    (b):...

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site