Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Fri Sep 19, 2014 17:21:29 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

Blog Posts by Rajan Singh
Page#    Showing 1 to 2 of 2 blog entries  
Predictions: 30
confirm: 18
rac: 12
wl: 0
Journey: Mon May 19, 2014 @ 09:35
19045/Surat-Chhapra Tapti Ganga Express
Entry# 1030890
   Posted by: Rajan Singh   0 blog posts
PNR: 812-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >118   |   Charting: < 05:35   |   Similar PNRs
ST/Surat   to   MZP/Mirzapur   |   1326 km / 1727 km
Original Status as of: Mar 20 2014 (10:10PM)
Passenger 1: RAC 16 (Booking Status: RAC 16,GNWL)
Passenger 2: RAC 17 (Booking Status: RAC 17,GNWL)
Passenger 3: RAC 18 (Booking Status: RAC 18,GNWL)
Passenger 4: Waitlist# 1 (Booking Status: W/L 1,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 19 2014 (12:18PM)
Passenger 1: RB2 47 (Booking Status: RAC 16,GNWL)
Passenger 2: RB2 55 (Booking Status: RAC 17,GNWL)
Passenger 3: RB2 55 (Booking Status: RAC 18,GNWL)
Passenger 4: RB2 63 (Booking Status: W/L 1,GNWL)
Chart PREPARED

1580 views
Mar 20 2014 (10:11PM)        

12658 Chennai Mail*^   6185 blog posts   12759 correct pred (64% accurate)  
Re# 1030890-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
#RACAllocation 18 in 3 A from ST to MZP ( Mirzapur ) under GN
Predictions: 21
confirm: 17
rac: 4
wl: 0
Journey: Thu Jan 02, 2014 @ 21:00
11068/Saket Express
Entry# 952583
   Posted by: Rajan Singh   0 blog posts
PNR: 261-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >54   |   Charting: < 16:02   |   Similar PNRs
ALD/Allahabad Junction   to   KYN/Kalyan Junction   |   1308 km / 1502 km
Original Status as of: Jan 02 2014 (7:20AM)
Passenger 1: Confirmed (Booking Status: RAC 21,RLGN)
Passenger 2: Confirmed (Booking Status: RAC 22,RLGN)
Passenger 3: RAC 1 (Booking Status: RAC 23,RLGN)
Passenger 4: RAC 2 (Booking Status: RAC 24,RLGN)
Passenger 5: RAC 3 (Booking Status: W/L 1,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 02 2014 (9:17PM)
Passenger 1: S6,33/Coach Position:11 (Booking Status: RAC 21,RLGN)
Passenger 2: S6,36/Coach Position:11 (Booking Status: RAC 22,RLGN)
Passenger 3: S6,34/Coach Position:11 (Booking Status: RAC 23,RLGN)
Passenger 4: S6,35/Coach Position:11 (Booking Status: RAC 24,RLGN)
Passenger 5: S6,37/Coach Position:11 (Booking Status: W/L 1,RLGN)
Chart PREPARED

866 views
Jan 02 2014 (9:08PM)        

DJ™   4827 blog posts   63333 correct pred (71% accurate)  
Re# 952583-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
#racallocation is 24 in SL from ALD-KYN
Page#    2 blog entries  

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Sep 29, 2014
Trains with ARP 30 Dep on: Sun Oct 19, 2014
Trains with ARP 60 Dep on: Tue Nov 18, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 1209120
    Sep 07 (03:36PM)


    -@all members: This is an IMPORTANT reminder to all members that NO MONETARY transactions are permitted within the scope of IRI. Members are NOT ALLOWED to borrow/lend money to each other, book rail tickets for each other, introduce themselves as "IRI Members/Admins" and solicit monetary favours, asking to book rail tickets...
  • Entry# 1204822
    Sep 02 (07:04PM)


    With the roll out of new TTs, we are introducing 3 new enhancements: . 1. "To Be Introduced" trains: As the title implies, Admins may add Trains that are announced in the Budget and Not yet introduced, to this list, with WHATEVER tentative TT is available, and whatever sketchy or vague information...
  • Entry# 1193896
    Aug 21 (10:23PM)


    The new IRI logo can now be seen. Actually, we are reluctant to make changes to the logo (for the sake of recognizability and consistency), but some very slight modification was done this time. Here is the post-facto rationalization of the logo: . 1. The Chakra is the Wheel symbolizing Transportation/Travel which...
  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
Scroll to Top
Scroll to Bottom