Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Mar 30, 2017 08:32:03 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Mar 30, 2017 08:32:03 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by sukhi
Page#    1 Blog Entries  
  
0 Followers
387 views
Dec 22 2010 (23:52)  
 

sukhi   1 blog posts
Entry# 93477            Tags   Past Edits
Hello,
All the metroplitons are very well connected with superfast trains.
But just couldn't get why The Mumbai-Banglore route is still neglected,
there are two routes
1) via Wadi-Guntakal 961 km
2)
...
more...
via Belgaum- Hubli 1023 km
viA BOTH ROUTES IT TAKES AROUND 23/24 HRS.. With an average speed of around 45 to 55 km.
most of the pepole nowadaya prefer Buses which take much less time around 18 to 18 hrs.
Indian railway should take some action over it like doubling of track, electfication etc in near future, because its a major route being neglacted for so many years.
No superfast, No garibrath nothing ???

  
351 views
Dec 23 2010 (00:01)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   9877 blog posts   14933 correct pred (63% accurate)
Re# 93477-1            Tags   Past Edits
thats true i had to suffer three year while i was in bangalore this is cross rail zone politics they neglect Madhya Pradesh most of the time no garib rath between hyd and bhopal no durronto between pune and bhopal only train by default have to pass from bhopal as being in center

  
356 views
Dec 23 2010 (10:39)
Guest: 84b44466   show all posts
Re# 93477-2            Tags   Past Edits
our existing track layout is shapeless and complex.
it may have to change immediately to fast and clear track configuration with the following.. To give equal preority through out INDIA.
> Four/six (two fast lines, two slow lines, two for fast track maintanence) parellel tracks from top to bottom of india.. Jammutawi to kanya kumari.
> Each and every metro, major other cites has
...
more...
to connect to the above track with four parellel tracks.
> Cross over free east to west connecting tracks.
Page#    1 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Apr 9
Trains with ARP 15 Dep on: Fri Apr 14
Trains with ARP 30 Dep on: Sat Apr 29
Trains with ARP 120 Dep on: Fri Jul 28

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site