Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Feb 23, 2017 13:12:36 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Feb 23, 2017 13:12:36 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Ravindra Gullapalli
Page#    11 Blog Entries  next>>
  
Predictions: 37
confirm: 37
rac: 0
wl: 0
Journey: Wed Jun 25, 2014 @ 18:00
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 35
Travel: ADI/Ahmedabad Junction   to   VSKP/Visakhapatnam Junction   |   1812 km / 2779 km
18402/Dwarka Express
Entry# 1072163

Posted by: Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
PNR: 812-xxxxxxx    |   Similar PNRs
Posted Status as of: Apr 26 2014 (11:58)
Passenger 1: RAC 5 (Booking Status: RAC 6,RLGN)
Passenger 2: RAC 6 (Booking Status: W/L 1,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 26 2014 (12:14)
Passenger 1: Can/Mod (Booking Status: RAC 6,RLGN)
Passenger 2: Can/Mod (Booking Status: W/L 1,RLGN)
Chart PREPARED

  
1648 views
May 20 2014 (22:46)
S Verma*^~   5980 blog posts   119211 correct pred (89% accurate)
Re# 1072163-1            Tags   Past Edits
#RACallocation 6
ADI to VSKP in AC-3
  
Predictions: 4
confirm: 3
rac: 1
wl: 0
Journey: Thu Dec 19, 2013 @ 10:00
Class: Sleeper - SL   |   Tot Seats: Avbl 125
Travel: ADI/Ahmedabad Junction   to   SC/Secunderabad Junction   |   1222 km / 1469 km
17017/Rajkot - Secunderabad Express
Entry# 929247
 

Posted by: Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
PNR: 821-xxxxxxx    |   Similar PNRs
Posted Status as of: Dec 09 2013 (02:43)
Passenger 1: Waitlist# 79 (Booking Status: W/L 120,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Dec 09 2013 (15:18)
Passenger 1: Can/Mod (Booking Status: W/L 120,RLGN)
Chart NOT Prepared

  
1068 views
Dec 09 2013 (07:32)
II Mangalyaan II The Mars Orbiter Mission II Sep 2   1327 blog posts   52730 correct pred (79% accurate)
Re# 929247-1            Tags   Past Edits
book tkt from SUNR to SC and change Boarding point to ADI, fare diff will be 30 rs and u will get rac 11

  
835 views
Dec 09 2013 (15:01)
Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
Re# 929247-2            Tags   Past Edits
Thank you so much. Did it and got RAC14
  
Info Update
0 Followers
1807 views
Feb 27 2013 (00:01)   12656/Navjeevan SF Express (PT)
 

Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
Entry# 681032            Tags   Past Edits
Reached Ahmedabad at 19:55 (55 mins late) on 26th Feb, 2013. How to update this?

  
1724 views
Feb 27 2013 (00:03)
أبواب تغلق*^~   6291 blog posts   6799 correct pred (62% accurate)
Re# 681032-1            Tags   Past Edits
doesn't need to update it... this site will automatically take it from train running status

  
1697 views
Feb 27 2013 (00:05)
Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
Re# 681032-2            Tags   Past Edits
Train running status was updated till 17:01 hrs only

  
1711 views
Feb 27 2013 (00:10)
أبواب تغلق*^~   6291 blog posts   6799 correct pred (62% accurate)
Re# 681032-3            Tags   Past Edits
thanx refreshing done now
  
Predictions: 14
confirm: 11
rac: 0
wl: 3

[overstamped]
Journey: Sun Jan 27, 2013 @ 21:10
Class: Sleeper - SL
Travel: AL/Attili   to   SC/Secunderabad Junction   |   441 km / 1135 km
17015/Visakha Express
Entry# 652550
 

Posted by: Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
PNR: 631-xxxxxxx    |   Similar PNRs
Posted Status as of: Jan 26 2013 (11:34)
Passenger 1: Waitlist# 28 (Booking Status: W/L 30,CK)
Passenger 2: Waitlist# 29 (Booking Status: W/L 31,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 27 2013 (16:01)
Passenger 1: S8,28 (Booking Status: W/L 30,HO)
Passenger 2: S8,29 (Booking Status: W/L 31,HO)
Chart NOT Prepared

  
987 views
Jan 27 2013 (15:39)
Mayiladuthurai The Undisputed King Of Mainline*^   6793 blog posts   32255 correct pred (64% accurate)
Re# 652550-1            Tags   Past Edits

  
887 views
Jan 27 2013 (16:24)
Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
Re# 652550-2            Tags   Past Edits
What is FINAL CONFIRMED and FINAL CANCELLED?

  
814 views
Jan 27 2013 (16:42)
Mayiladuthurai The Undisputed King Of Mainline*^   6793 blog posts   32255 correct pred (64% accurate)
Re# 652550-3            Tags   Past Edits
final stamping.....
  
Predictions: 15
confirm: 12
rac: 1
wl: 2
Journey: Wed Dec 05, 2012 @ 19:55
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 142   |   Charting: < 16:45
Travel: NDLS/New Delhi   to   ADI/Ahmedabad Junction   |   937 km / 937 km
12958/Swarna Jayanti Rajdhani Express
Entry# 595438
 

Posted by: Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
PNR: 224-xxxxxxx    |   Similar PNRs
Posted Status as of: Nov 28 2012 (11:57)
Passenger 1: Waitlist# 42 (Booking Status: W/L 107,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Dec 01 2012 (15:06)
Passenger 1: Can/Mod (Booking Status: W/L 107,GNWL)
Chart NOT Prepared

  
761 views
Nov 28 2012 (11:58)
rajyogesh30   63 blog posts   222 correct pred (57% accurate)
Re# 595438-1            Tags   Past Edits
100% it will remain in w/l except u dont avail any Railway Quota
  
Site-Related
0 Followers
1267 views
Oct 15 2012 (09:21)  

Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
Entry# 551567            Tags   Past Edits
What is the meaning of "Tot Seats" and "Charting" in the PNR Post? and what is the meaning of less than and greater than symbols in that?

  
1027 views
Oct 15 2012 (09:25)
☺भारतीय रेल😊*^   3195 blog posts   5175 correct pred (66% accurate)
Re# 551567-1            Tags   Past Edits
Charting : Expected timing of Chart preparation for the train
Tot Seats: Expected number of total seats/berths between the source and destination mentioned in that PNR post

  
1000 views
Oct 15 2012 (12:24)
Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
Re# 551567-2            Tags   Past Edits
Tot Seats represents the current status OR the original status?

  
994 views
Oct 15 2012 (12:28)
Hercule Poirot   6459 blog posts   144 correct pred (71% accurate)
Re# 551567-3            Tags   Past Edits
Original.. No of totally aval seats in that train for that class for that quota..

  
Oct 15 2012 (12:33)
คภנคคภ   6653 blog posts   20463 correct pred (65% accurate)
Re# 551567-4            Tags   Past Edits
You may refer this faq for details on "Total seats" -->/faq/post/1263
You may refer this faq for details on "Charting" -->/faq/post/1307

  
966 views
Oct 15 2012 (12:35)
Mohd Arif*^~   14966 blog posts   1455 correct pred (79% accurate)
Re# 551567-5            Tags   Past Edits
tOT= total seat of tht train for tht quota (tht seat info maybe wrng as it update acording to ARP 120 avlblty )
<= it means charting time maybe less frm wht showing here ,, nd > = just opposite to < symbol
  
Predictions: 23
confirm: 23
rac: 0
wl: 0
Journey: Tue Aug 14, 2012 @ 22:57
Class: Sleeper - SL   |   Tot Seats: Avbl 430
Travel: EE/Eluru   to   SC/Secunderabad Junction   |   409 km / 563 km
12737/Gowthami SF Express (PT)
Entry# 503316
 

Posted by: Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
PNR: 424-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Aug 13 2012 (11:02)
Passenger 1: Waitlist# 20 (Booking Status: W/L 20,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Aug 14 2012 (20:35)
Passenger 1: S3,50/Coach Position:5 (Booking Status: W/L 20,HO)
Chart PREPARED

  
950 views
Sep 16 2012 (14:59)
KMonIRI*^~   3629 blog posts   61638 correct pred (73% accurate)
Re# 503316-1            Tags   Past Edits
I think It shld b stamped as VOID.............

5 posts are hidden.
  
0 Followers
724 views
Mar 16 2012 (18:26)  
 

Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
Entry# 374544            Tags   Past Edits
What is the meaning of Void stamp in my predictons?

  
706 views
Mar 16 2012 (18:30)
Guest: 74c50bc1   show all posts
Re# 374544-1            Tags   Past Edits
Either ticket was cancelled or got confirmed via HO quota.
  
Predictions: 12
confirm: 6
rac: 0
wl: 6
Journey: Sun Apr 08, 2012 @ 19:50
Class: Sleeper - SL   |   Tot Seats: Avbl 96
Travel: PUNE/Pune Junction   to   ADI/Ahmedabad Junction   |   625 km / 1079 km
11090/Pune - Bhagat Ki Kothi Express (PT)
Entry# 374537
 

Posted by: Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
PNR: 870-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 16 2012 (18:21)
Passenger 1: Waitlist# 81 (Booking Status: W/L 134,PQWL)
Passenger 2: Waitlist# 82 (Booking Status: W/L 135,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 08 2012 (11:51)
Passenger 1: Can/Mod (Booking Status: W/L 134,PQWL)
Passenger 2: Can/Mod (Booking Status: W/L 135,PQWL)
Chart NOT Prepared
  
Predictions: 17
confirm: 2
rac: 0
wl: 15
Journey: Wed Mar 14, 2012 @ 06:40
Class: Sleeper - SL   |   Tot Seats: Avbl 248
Travel: ADI/Ahmedabad Junction   to   BZA/Vijayawada Junction   |   1462 km / 1893 km
12655/Navjeevan SF Express (PT)
Entry# 371484
 

Posted by: Ravindra Gullapalli   7 blog posts   86 correct pred (66% accurate)
PNR: 810-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 13 2012 (08:15)
Passenger 1: Waitlist# 46 (Booking Status: W/L 48,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 13 2012 (22:26)
Passenger 1: S1,5 (Booking Status: W/L 48,CK)
Chart PREPARED
Page#    11 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 5
Trains with ARP 15 Dep on: Fri Mar 10
Trains with ARP 30 Dep on: Sat Mar 25
Trains with ARP 120 Dep on: Fri Jun 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site