Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 21, 2017 06:29:01 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 21, 2017 06:29:01 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Sajjad Anwar Ujiarwi
Page#    19 Blog Entries  next>>
  
Predictions: 12
confirm: 7
rac: 5
wl: 0
Journey: Thu May 10, 2012 @ 11:25
Class: Sleeper - SL   |   Tot Seats: Avbl 474
Travel: NK/Nasik Road   to   ARA/Ara Junction   |   1474 km / 1912 km
12336/Mumbai LTT - Bhagalpur SF Express
Entry# 420680
 

Posted by: Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
PNR: 810-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: May 09 2012 (20:19)
Passenger 1: S3,41 (Booking Status: W/L 84,DF)
Passenger 2: S3,42 (Booking Status: W/L 85,DF)
Passenger 3: RAC 87 (Booking Status: W/L 86,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 09 2012 (22:14)
Passenger 1: S3,41 (Booking Status: W/L 84,DF)
Passenger 2: S3,42 (Booking Status: W/L 85,DF)
Passenger 3: RS3 71 (Booking Status: W/L 86,GNWL)
Chart PREPARED
  
Predictions: 18
confirm: 16
rac: 0
wl: 2
Journey: Sun May 13, 2012 @ 11:50
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 6   |   Charting: < 21:30
Travel: NK/Nasik Road   to   CNB/Kanpur Central   |   1168 km / 1424 km
12534/Pushpak Express (PT)
Entry# 419756
 

Posted by: Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
PNR: 836-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: May 08 2012 (20:55)
Passenger 1: Waitlist# 2 (Booking Status: W/L 2,PQWL)
Passenger 2: Waitlist# 3 (Booking Status: W/L 3,PQWL)
Passenger 3: Waitlist# 4 (Booking Status: W/L 4,PQWL)
Passenger 4: Waitlist# 5 (Booking Status: W/L 5,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 12 2012 (22:00)
Passenger 1: Waitlist# 1 (Booking Status: W/L 2,PQWL)
Passenger 2: Waitlist# 2 (Booking Status: W/L 3,PQWL)
Passenger 3: Waitlist# 3 (Booking Status: W/L 4,PQWL)
Passenger 4: Waitlist# 4 (Booking Status: W/L 5,PQWL)
Chart PREPARED
  
Predictions: 19
confirm: 17
rac: 2
wl: 0
Journey: Fri Apr 06, 2012 @ 06:20
Class: Sleeper - SL   |   Tot Seats: Avbl 116
Travel: BSL/Bhusaval Junction   to   BXR/Buxar   |   1149 km / 1687 km
12141/Mumbai LTT - Patliputra SF Express (PT)
Entry# 378081
 

Posted by: Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
PNR: 860-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 21 2012 (20:25)
Passenger 1: Waitlist# 8 (Booking Status: W/L 11,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 05 2012 (20:55)
Passenger 1: S4,11 (Booking Status: W/L 11,RLGN)
Chart PREPARED

  
1051 views
Apr 02 2012 (15:18)
Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
Re# 378081-1            Tags   Past Edits
What is RLWL?please tell me.

  
1044 views
Apr 02 2012 (15:19)
Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
Re# 378081-2            Tags   Past Edits
f

  
923 views
Apr 05 2012 (20:56)
ThE BoSs*^~   14210 blog posts   63656 correct pred (69% accurate)
Re# 378081-3            Tags   Past Edits
Remote Location Wait-list.
Happy Journey Sir :)
  
Predictions: 28
confirm: 20
rac: 1
wl: 7
Journey: Thu Apr 12, 2012 @ 14:25
Class: Sleeper - SL   |   Tot Seats: Avbl >1
Travel: JBP/Jabalpur Junction   to   BXR/Buxar   |   597 km / 1687 km
12141/Mumbai LTT - Patliputra SF Express (PT)
Entry# 379570
 

Posted by: Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
PNR: 855-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 23 2012 (22:53)
Passenger 1: Waitlist# 33 (Booking Status: W/L 39,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 12 2012 (13:01)
Passenger 1: Waitlist# 20 (Booking Status: W/L 39,RLGN)
Chart PREPARED
  
Predictions: 8
confirm: 2
rac: 6
wl: 0
Journey: Fri Mar 23, 2012 @ 20:00
Class: Sleeper - SL   |   Tot Seats: Avbl 100   |   Charting: < 16:30
Travel: NDLS/New Delhi   to   BXR/Buxar   |   881 km / 1063 km
12402/Magadh Express (PT)
Entry# 379464
 

Posted by: Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
PNR: 213-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 23 2012 (20:07)
Passenger 1: RAC 47 (Booking Status: W/L 33,GNWL)
Train Status
TRAIN IS RUNNING LATE BY 06 Hour(s) and 20 Minute(s)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 23 2012 (20:38)
Passenger 1: S8,31/Coach Position:17 (Booking Status: W/L 33,GNWL)
Train Status TRAIN IS RUNNING LATE BY 06 Hour(s) and 20 Minute(s)
Chart PREPARED
  
Predictions: 11
confirm: 3
rac: 0
wl: 8
Journey: Fri Mar 23, 2012 @ 11:10
Class: Sleeper - SL
Travel: DVL/Devlali   to   BXR/Buxar   |   1411 km / 2737 km
15647/Mumbai LTT - Guwahati Express (via Malda Town)
Entry# 378553
 

Posted by: Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
PNR: 830-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: Mar 22 2012 (14:48)
Passenger 1: Waitlist# 26 (Booking Status: W/L 48,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 22 2012 (23:20)
Passenger 1: Waitlist# 23 (Booking Status: W/L 48,PQWL)
Chart PREPARED
  
Predictions: 19
confirm: 1
rac: 0
wl: 18
Journey: Wed Apr 11, 2012 @ 03:00
Class: Sleeper - SL   |   Tot Seats: Avbl 104
Travel: NK/Nasik Road   to   BXR/Buxar   |   1406 km / 1687 km
12141/Mumbai LTT - Patliputra SF Express (PT)
Entry# 378085
 

Posted by: Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
PNR: 860-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: Mar 21 2012 (20:29)
Passenger 1: Waitlist# 157 (Booking Status: W/L 208,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 10 2012 (19:01)
Passenger 1: Can/Mod (Booking Status: W/L 208,PQWL)
Chart NOT Prepared
  
Predictions: 23
confirm: 23
rac: 0
wl: 0
Journey: Fri Mar 23, 2012 @ 11:10
Class: Sleeper - SL
Travel: DVL/Devlali   to   GHY/Guwahati   |   2575 km / 2737 km
15647/Mumbai LTT - Guwahati Express (via Malda Town)
Entry# 377373
 

Posted by: Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
PNR: 855-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: Mar 20 2012 (22:30)
Passenger 1: RAC 17 (Booking Status: W/L 58,GNWL)
Passenger 2: RAC 18 (Booking Status: W/L 59,GNWL)
Passenger 3: RAC 19 (Booking Status: W/L 60,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 23 2012 (19:41)
Passenger 1: S1,28 (Booking Status: W/L 58,DF)
Passenger 2: RS1 39 (Booking Status: W/L 59,GNWL)
Passenger 3: RS1 39 (Booking Status: W/L 60,GNWL)
Chart PREPARED
  
Predictions: 23
confirm: 4
rac: 19
wl: 0
Journey: Wed Jan 18, 2012 @ 23:05
Class: Sleeper - SL
Travel: DVL/Devlali   to   ROK/Rohtak Junction   |   1435 km / 1929 km
12137/Punjab Mail (PT)
Entry# 326211
 

Posted by: Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
PNR: 841-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: Jan 12 2012 (20:45)
Passenger 1: Waitlist# 18 (Booking Status: W/L 37,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 18 2012 (19:54)
Passenger 1: RS4 39/Coach Position:9 (Booking Status: W/L 37,GNWL)
Chart PREPARED
  
0 Followers
1218 views
Dec 11 2011 (21:08)  
 

Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
Entry# 302099            Tags   Past Edits
Train 12809 timing in Devlali on 18/12/11

1 posts - Sun Dec 11, 2011

  
696 views
Dec 11 2011 (21:13)
rdb*^   30527 blog posts   359260 correct pred (79% accurate)
Re# 302099-2            Tags   Past Edits
Devlali Arr/Dep will be 00.08/00.10 hrs.

  
732 views
Dec 11 2011 (21:13)
Roshan v Iyengar*^~   5440 blog posts   736 correct pred (83% accurate)
Re# 302099-3            Tags   Past Edits
According from the source it arrives at (DVL)Devlali 00:08 and departs at 00:10....

  
727 views
Dec 11 2011 (21:13)
Journey from 9W to EK   3506 blog posts   13827 correct pred (69% accurate)
Re# 302099-4            Tags   Past Edits

  
817 views
Dec 12 2011 (10:49)
Sajjad Anwar Ujiarwi   14 blog posts   257 correct pred (62% accurate)
Re# 302099-5            Tags   Past Edits
Thanx

  
886 views
Dec 12 2011 (10:57)
Guest: 7dfac78c   show all posts
Re# 302099-6            Tags   Past Edits
You Queried For
Train No Train Name Runs From Source Runs On
12809 HOWRAH MAIL MUMBAI CST MON TUE WED THU FRI SAT SUN

SNo Stn Code Stn Name Route No. Arrival Time Dep. Time Halt Time (In Minutes) Distance Day Remark
1 CSTM MUMBAI
...
more...
CST 1 Source 20:35 0 1
2 DR DADAR 1 20:48 20:50 2:00 9 1
3 TNA THANE 1 21:13 21:15 2:00 34 1
4 KYN KALYAN JN 1 21:35 21:40 5:00 54 1
5 KSRA KASARA 1 22:45 22:47 2:00 121 1
6 IGP IGATPURI 1 23:23 23:25 2:00 137 1
7 DVL DEVLALI 1 00:08 00:10 2:00 182 2
8 NK NASIK ROAD 1 00:23 00:25 2:00 188 2
9 MMR MANMAD JN 1 01:20 01:25 5:00 261 2
10 CSN CHALISGAON JN 1 02:23 02:25 2:00 328 2
11 JL JALGAON JN 1 03:33 03:35 2:00 421 2
12 BSL BHUSAVAL JN 1 04:00 04:05 5:00 445 2
13 MKU MALKAPUR 1 04:58 05:00 2:00 495 2
14 NN NANDURA 1 05:28 05:30 2:00 523 2
15 JM JALAMB JN 1 05:38 05:40 2:00 535 2
16 SEG SHEGAON 1 05:48 05:50 2:00 548 2
17 AK AKOLA JN 1 06:25 06:30 5:00 585 2
18 MZR MURTAJAPUR 1 06:59 07:00 1:00 622 2
19 BD BADNERA JN 1 07:55 08:00 5:00 664 2
20 DMN DHAMANGAON 1 08:30 08:32 2:00 709 2
21 PLO PULGAON JN 1 08:47 08:49 2:00 729 2
22 WR WARDHA JN 1 09:25 09:28 3:00 759 2
23 NGP NAGPUR 1 11:05 11:25 20:00 838 2
24 BRD BHANDARA ROAD 1 12:09 12:11 2:00 900 2
25 TMR TUMSAR ROAD 1 12:25 12:27 2:00 918 2
26 G GONDIA JN 1 13:11 13:16 5:00 968 2
27 DGG DONGARGARH 1 14:09 14:11 2:00 1041 2
28 RJN RAJ NANDGAON 1 14:32 14:34 2:00 1072 2
29 DURG DURG 1 15:25 15:30 5:00 1102 2
30 R RAIPUR JN 1 16:05 16:15 10:00 1138 2
31 BYT BHATAPARA 1 17:08 17:10 2:00 1202 2
32 BSP BILASPUR JN 1 18:00 18:15 15:00 1249 2
33 CPH CHAMPA 1 19:01 19:03 2:00 1301 2
34 SKT SAKTI 1 19:22 19:24 2:00 1332 2
35 RIG RAIGARH 1 19:55 19:57 2:00 1381 2
36 BRJN BRAJRAJNAGAR 1 20:40 20:42 2:00 1441 2
37 JSG JHARSUGUDA JN 1 21:35 21:40 5:00 1454 2
38 ROU ROURKELA 1 22:55 23:10 15:00 1555 2
39 CKP CHAKRADHARPUR 1 00:28 00:35 7:00 1657 3
40 TATA TATANAGAR JN 1 01:40 01:50 10:00 1719 3
41 KGP KHARAGPUR JN 1 03:35 03:40 5:00 1853 3
42 SRC SANTRAGACHI JN 1 05:11 05:13 2:00 1961 3
43 HWH HOWRAH JN 1 05:50 Destination 1968 3
Page#    19 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 3
Trains with ARP 15 Dep on: Wed Mar 8
Trains with ARP 30 Dep on: Thu Mar 23
Trains with ARP 120 Dep on: Wed Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site