Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun May 28, 2017 17:50:18 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun May 28, 2017 17:50:18 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by ahemadnagarbeedraiwayline after 30 year not comp
Page#    42 Blog Entries  next>>
  
Rail News
0 Followers
1082 views
Mar 18 2017 (09:29)   अहमदनगर-बीड रेल्वे मार्गावर पहिल्यांदाच रेल्वे धावली!

vishal~   91 news posts
Entry# 2201485   News Entry# 296727         Tags   Past Edits
अहमदनगर-बीड रेल्वे मार्गावर पहिल्यांदाच रेल्वे धावली!
बीड : बीडकरांचं अनेक वर्षांपासूनचं अहमदनगर-बीड-परळी रेल्वेचं स्वप्न लवकरच पूर्ण होणार आहे. अहमदनगरमधील नारायण डोह या स्थानकापासून बीडच्या दिशेने काल पहिल्यांदाच या मार्गावरून रेल्वेची चाचणी झाली.
या चाचणीत 12.5 किमीचा मार्ग हा दैनंदिन प्रवासासाठी तयार असल्याचं निष्पन्न झालं आहे. रेल्वे अधिकाऱ्यांनीही या मार्गासाठी हिरवा कंदिल दिल्यामुळे लवकरच नगर-बीड-परळी या मार्गावरून रेल्वेनं प्रवास करता येणार आहे.
यंदाच्या अर्थसंकल्पात या
...
more...
रेल्वे मार्गासाठी सर्वाधिक 780 कोटींची भरीव तरतूद करण्यात आली आहे. या प्रकल्पासाठी पहिल्या वर्षी 159 कोटी, दुसऱ्या वर्षी 300 कोटी आणि आता 780 कोटींची तरतूद रेल्वेमंत्री सुरेश प्रभू यांनी केली आहे. याशिवाय राज्य सरकारचा वाटा या तरतुदी व्यतिरिक्त असणार आहे.
अहमदनगर ते परळी दरम्यानच्या जवळपास सर्व ठिकाणच्या रेल्वे पुलांचं काम पूर्ण झालं असून भरावाचं कामही पूर्ण होत आलं आहे. तर अहमदनगर ते नारायणडोह या पहिल्या टप्प्यातील पंधरा किलोमीटरवर रेल्वे रूळ देखील अंथरून झाले आहेत.
दरम्यान यापूर्वी या मार्गावर रेल्वे इंजिन धावताना पाहिल्याने सर्वांच्या भुवया उंचावल्या होत्या. नगर-दौंड महामार्गावर हा रेल्वेमार्ग महामार्गास छेदतो. तेथून हे रेल्वे इंजिन धावलं होते

3 posts are hidden.

  
1182 views
Mar 18 2017 (15:54)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 2201485-4            Tags   Past Edits
Still 10 years to reach to beed

  
1184 views
Mar 18 2017 (15:55)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 2201485-5            Tags   Past Edits
1 compliments
sad
34 years to to make 15 km.

  
1067 views
Mar 18 2017 (16:55)
vishal~   742 blog posts
Re# 2201485-6            Tags   Past Edits
This time got 780 crore rs fund. Hope boosted for this line
  
Site-Related
1 Followers
868 views
Jan 03 2017 (07:53)  

ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Entry# 2114265            Tags   Past Edits
Ahemadnagar-beed-parli railway line update

  
589 views
Feb 18 2017 (21:10)
AurngabadPurnaAkolaNagpur~   708 blog posts   1 correct pred (14% accurate)
Re# 2114265-1            Tags   Past Edits
इस लाइन के काम का कोई अपडेट है?
  
★★  General Travel
0 Followers
34226 views
Jul 27 2015 (10:04)   MHOW/Mhow (3 PFs)
 

vipinpandit   595 blog posts   1 correct pred (100% accurate)
Entry# 1551418            Tags   Past Edits
#indorenews
India's 2nd largest tunnel to be constructed between Mhow and Mukhtyar Balwada.
Courtsey : Dainik Bhaskar Indore

7 posts are hidden.

  
3655 views
Aug 14 2015 (22:29)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1551418-8            Tags   Past Edits
true said

  
3992 views
Aug 14 2015 (22:29)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1551418-9            Tags   Past Edits
not yet started

  
4021 views
Aug 14 2015 (22:38)
berar2   57 blog posts   7 correct pred (78% accurate)
Re# 1551418-10            Tags   Past Edits
is there any progress
  
Rail News
0 Followers
1020 views
Other News
Aug 14 2015 (16:28)   :: Grievance Status ::
 

ahemadnagarbeedraiwayline after 30 year not comp   1 news posts
Entry# 1565276   News Entry# 237723         Tags   Past Edits
Status as on 14 Aug 2015 Registration Number : MORLY/E/2015/06970 Name Of Complainant : sikandar Date of Receipt : 06 Aug 2015 Received by : Ministry of Railways, ( Railway Board) Forwarded to : Chief Administrative Officer Construction Contact Address : New Administative Building,6th Floor Mumbai CST,Central Railway Mumbai400001 Contact Number : 09987645218 Grievance Description : Sir I want know the SOLAPUR-TULJAPUR-USMANABAD-BEED-JALNA-BHOKARDAN-SILLOD-JALGAON RAILWAY LINE update???? Whether mahashtra govt. Sactioned 50% cost sharing for devlopment of new railway line???? Please provide detail root of passing through village and district place/taluka ??? Whether this project included in pink book??? If not; current status of the project??? Current Status : CASE CLOSED Your Feedback :
Poor Date of Action : 14 Aug 2015 Details :
...
more...
Board has shelved the project vide their letter No.2012/W1/CR/NL/Solapur- Jalgaon dated 21.08.2014.

  
3028 views
Aug 14 2015 (17:42)
Guest: 188bd054   show all posts
Re# 1565276-1            Tags   Past Edits
Is this a press news?
  
Race Blog
0 Followers
2539 views
Aug 09 2015 (12:26)   12071/Dadar - Jalna Jan Shatabdi Express | DR/Dadar Central (8 PFs)
 

عمران جاوید   3746 blog posts   900 correct pred (63% accurate)
Entry# 1560989            Tags   Past Edits
race blog for the inaugral run of
******dadar jalna janshatabdi express***********
-----------------------------
9 aug 2015
-------------------
schdeduled
...
more...
dep dr...1400 hrs
Train Name JANSHATABDI EXPRESS
Station DADAR (DR)
Date 09-Aug-2015
Sch. Arrival Train Source
Act. Arrival Train Source
Sch. Departure 09-Aug 14:00
Exp. Departure 09-Aug 14:00*
Delay Departure No Delay
Exp. Platform No. 7
Last Location Yet to start from Train Source

11 posts are hidden.

  
1438 views
Aug 09 2015 (20:37)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1560989-12            Tags   Past Edits
any video update dadar-jalna first journey....................

  
1897 views
Aug 09 2015 (20:38)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1560989-13            Tags   Past Edits
12071 janshatbdi at aurangabad............

  
1786 views
Aug 09 2015 (20:42)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1560989-14            Tags   Past Edits
still at aurangabad @8.40 pm

  
1754 views
Aug 09 2015 (20:59)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1560989-15            Tags   Past Edits
janshatabdi train at chikalthan

  
1818 views
Aug 09 2015 (22:01)
عمران جاوید   3746 blog posts   900 correct pred (63% accurate)
Re# 1560989-16            Tags   Past Edits
Train Name JANSHATABDI EXPRESS
Station AURANGABAD (AWB)
Date 09-Aug-2015
Sch. Arrival 09-Aug 20:35
Act. Arrival 09-Aug 19:56
Delay
...
more...
Arrival No Delay
Sch. Departure 09-Aug 20:40
Act. Departure 09-Aug 20:40
Delay Departure No Delay
Last Location Arrived at JALNA (J) at 09-Aug 21:40 No Delay (62 Kms. ahead) .

1 posts are hidden.
  
Rail News
1 Followers
2420 views
New Facilities/TechnologySCR/South Central  -  IR Press Release 
Aug 07 2015 (14:52)   rain No. 12071/12072 Dadar – Aurangabad Janshatabdi Express to be Extended upto Jalna from 9th August 2015
 

knkprasad956*^~   529 news posts
Entry# 1559704   News Entry# 236816         Tags   Past Edits
he Ministry of Railways has extended Train No. 12071/12072 Dadar – Aurangabad Janshatabdi Express to run upto Jalna with effect from 9thAugust 2015. Shri Raosaheb Patil Danve, Hon’ble Member of Parliament Jalna will flag off the extended train from Jalna o­n 9th August, 2015.
Accordingly, with effect from 9th August 2015:-
Train No. 12071 Dadar – Jalna Janshatabdi Express will depart Dadar at 14:00 hrs (as at present), arrive/depart Manmad at 18:10/18:20 hrs arrive / depart Aurangabad at 20:35/20:40 hrs and arrive Jalna at 21:40 hrs.
In
...
more...
the return direction, Train No. 12072 Jalna – Dadar Janshatabdi Express will depart Jalna at 04:45 hrs, arrive/depart Aurangabad at 05:40/06:00 hrs, arrive/depart Manmad at 07:50/07/55 hrs and arrive Dadar at 12:30 hrs (as at present).

3 posts are hidden.

  
6534 views
Aug 07 2015 (16:58)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1559704-4            Tags   Past Edits
congratulation for jalnekar...................

  
6562 views
Aug 07 2015 (16:59)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1559704-5            Tags   Past Edits
admin please update..........
  
General Travel
0 Followers
1164 views
Jun 26 2015 (03:17)  
 

ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Entry# 1524362            Tags   Past Edits
dear all i wold like to book ticket for me in break journey for CST to mamad vidharba express on 29 june 2015 and from manmad to aurangabad. devgiri express at manmad 2.10 my question is i am travelling by 29 from CST to manmad on 29 june so manmad to aurangabad which date i have to book ???? on 29 june or 30 th june please guide......

  
1045 views
Jun 26 2015 (07:26)
The Spectacular KR   349 blog posts   465 correct pred (73% accurate)
Re# 1524362-1            Tags   Past Edits
30th June from Manmad to Aurangabad in 17057-Devagiri Exp as it departs 2.20 a.m. from Manmad..

  
938 views
Jun 26 2015 (23:07)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1524362-2            Tags   Past Edits
thanks
  
General Travel
0 Followers
1143 views
Jun 11 2015 (22:12)  
 

ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Entry# 1508860            Tags   Past Edits
admin please update 12225 kaiyfiyat express with e-catering facility...............
  
Rail News
0 Followers
1455 views
Commentary/Human InterestCR/Central  -  
Jun 02 2015 (22:20)   Maharashtra government sanctions Rs 1413 crore for Ahmednagar-Beed-Parli Vaijnath railway line
 

rdb*^   129386 news posts
Entry# 1497240   News Entry# 227416         Tags   Past Edits
MUMBAI: Maharashtra Government today sanctioned Rs 1,413 crore for the much-delayed Ahmednagar-Beed-Parli Vaijnath railway line project.
With the investment of Rs 1,413 crore, the state government will be a 50 per cent equity holder in the project which is estimated to worth Rs 2,826 crore, with Centre doing the rest of funding.
"This decision on the eve of first 'smrutidin' (death anniversary) of our beloved leader Gopinathji Munde is a tribute and a step towards fulfilling his dreams," Chief Minister Devendra Fadnavis tweeted.
The
...
more...
amount would be made available in phases through budgetary provision.
The decision is taken because the project, once completed, will help in expediting development in the backward rural areas, an official from the Chief Minister's Office (CMO) said.
The state government had in 2009 decided to share Rs 505 crore of the total cost (Rs 1,010 crore) of the project. However, slow progress on its implementation resulted into escalation of cost.
The land acquisition for the project is in final stages and the new railway line will boost infrastructure development in Marathwada region, the official said.

2 posts are hidden.

  
1054 views
Jun 03 2015 (19:45)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1497240-3            Tags   Past Edits
nothing will change

  
1055 views
Jun 03 2015 (19:45)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1497240-4            Tags   Past Edits
good news
  
General Travel
0 Followers
1219 views
Jun 02 2015 (20:59)  
 

ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Entry# 1497158            Tags   Past Edits
Work on new railway line in Marathwada gets boost
Rail connectivity in the region was a dream project of the late union minister and BJP leader Gopinath Munde
PUBLISHED: 17:20 JUNE 2, 2015 Gulf News
BY PAMELA RAGHUNATH, CORRESPONDENT
SHARERssShare
...
more...
on facebookShare on twitter Add on google plus Send Email to Friend Addthis 0
Mumbai The much-awaited Ahmednagar-Beed-Parli Vaijnath 261-km railway project got a boost today as the Maharashtra government decided to share 50 per cent of the cost of construction.
Rail connectivity in the Marathwada region, where this route passes through, was a dream project of the late union minister and BJP leader Gopinath Munde, who hailed from this region. Munde died exactly a year back on June 3, 2014 in an accident and this step would be a tribute to the late senior BJP leader. Hastening of this project, encumbered by land acquisition to lay the tracks, will bring a huge relief to the people of this region, who have been waiting for rail connectivity for decades.
Today, the state cabinet took a decision to participate in the building of the new railway line by spending Rs14.13 billion (Dh813.5 million) of the total estimated cost of Rs28.26 billion.
The Marathwada region in the interior of the state has seen far less development than Western Maharashtra and the new railway line would go a long way in bringing economic progress to this zone.
While there is no deadline for the completion of the project, the cabinet took a decision to complete it as early as possible. Financial provisions for the project would be made available in phases.
Due to the delay in construction, the cost of the project has gone up when in February 2009, the construction cost stood at Rs10.10 billion with a decision that Rs5.05 billion would be the state’s share. Work on the project is currently in progress.
Last week, Maharashtra Chief Secretary Swadheen Kshatriya had briefed Prime Minister Narendra Modi in a video conference that the land acquisition process for this railway line was almost complete.
Apparently, Modi had instructed Kshatriya that the rail line should be completed within a stipulated time. The 261-km long railway line will need 1,650 hectares of land, out of which 1,250 hectares has been acquired by the state government. He also informed Modi that the final cost of the project would be conveyed to the railway ministry.

  
1132 views
Jun 02 2015 (21:03)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1497158-1            Tags   Past Edits
abhi to bahot kaam bakhi hai.....

  
1123 views
Jun 02 2015 (21:03)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1497158-2            Tags   Past Edits
khali boost dene se kaam nahi hota...

  
1129 views
Jun 02 2015 (21:05)
ahemadnagarbeedraiwayline after 30 year not comp   63 blog posts
Re# 1497158-3            Tags   Past Edits
15 km completed.....from narayandoh to amalner work is going on.....and also 7.5 km tender issued from rahmoha to khokarmoha....still 35 km pending to reach beed
Page#    42 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Jun 7
Trains with ARP 15 Dep on: Mon Jun 12
Trains with ARP 30 Dep on: Tue Jun 27
Trains with ARP 120 Dep on: Mon Sep 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site