Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Feb 26, 2017 07:12:53 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Feb 26, 2017 07:12:53 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Nishant Pandey
Page#    13 Blog Entries  next>>
  
General Travel
0 Followers
4807 views
Sep 10 2013 (20:53)   04731/Bikaner - Haridwar Special Fare Special | SGNR/Shri Ganganagar Junction (3 PFs)
 

Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Entry# 848570            Tags   Past Edits
SGNR-BKN Successful Run on 9/9/13, 859 Passengers traveled in train with capacity of 650 approx.
click here

4 posts - Wed Sep 18, 2013

  
2538 views
Sep 22 2013 (10:15)
SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Re# 848570-5            Tags   Past Edits
Loco??any one has pic?

  
2462 views
Sep 22 2013 (14:07)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 848570-6            Tags   Past Edits
Sure!! It's in the link of my first post.!! It's WDP 4 :) :)

  
2403 views
Sep 29 2013 (15:42)
SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Re# 848570-7            Tags   Past Edits
WDP3A hai
WDP4 ki shakal to aisi hoti hi nahi.. or wo 4000 HP ki power create karta hai jo 18 coaches ki train ko khichta hai

  
2252 views
Sep 29 2013 (15:55)
SGNR HS Inaugural 27 Feb^~   78797 blog posts   5089 correct pred (78% accurate)
Re# 848570-8            Tags   Past Edits
incorrect .. photo me saaf likha hua hai wdp-3a pushpak...

  
3634 views
Oct 03 2013 (19:20)
Trains from SGNR to ASR and BDTS are must   68 blog posts
Re# 848570-9            Tags   Past Edits
I dont think it'll get further extension.....low patronage from SGNR station is the major reason...besides there is already a passenger train to SOG from SGNR stn after 30 min departure of this train....Railways need to sort out this
  
General Travel
0 Followers
2822 views
Sep 05 2013 (20:40)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Entry# 844451            Tags   Past Edits
Chances of sgnr-surat weekly special... Good News!!
click here

  
1134 views
Sep 05 2013 (20:41)
SGNR HS Inaugural 27 Feb^~   78797 blog posts   5089 correct pred (78% accurate)
Re# 844451-1            Tags   Past Edits
much needed .. first special .. then as regular

  
1191 views
Sep 12 2013 (23:42)
Trains from SGNR to ASR and BDTS are must   68 blog posts
Re# 844451-2            Tags   Past Edits
yeah it is being said that it will be a weekly train

1 posts are hidden.

  
1044 views
Sep 25 2013 (20:55)
Trains from SGNR to ASR and BDTS are must   68 blog posts
Re# 844451-4            Tags   Past Edits
Well another weekly Puja special train for SGNR. (Train no. 04723)..This time to Jammu via ABS, FZLK, FZR....from 02/10/13 to 27/11/13. Click here...click here

  
988 views
Sep 25 2013 (23:35)
ARUN SINGH RAJPUROHIT*^~   2077 blog posts   2842 correct pred (66% accurate)
Re# 844451-5            Tags   Past Edits
waave great news!!
plz tag it under 04723
i wish to run this in its old route i.e 04723 via samdhari-jalore-bhildi

4 posts are hidden.
  
General Travel
0 Followers
1835 views
Sep 20 2013 (19:23)   SGNR/Shri Ganganagar Junction (3 PFs)
 

vdnsshukla1978   11 blog posts   20 correct pred (51% accurate)
Entry# 856614            Tags   Past Edits
how to reach ganganagar from ahmedabad

2 posts are hidden.

  
1496 views
Sep 21 2013 (14:32)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 856614-3            Tags   Past Edits
Ahmedabad-Jammu tawi .. to Suratgarh , den take a bus or taxi..
  
General Travel
0 Followers
2439 views
Sep 08 2013 (00:19)   SGNR/Shri Ganganagar Junction (3 PFs)
 

SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Entry# 846374            Tags   Past Edits
Wats d result of hmh-kota sf extension to sgnr???.

  
1128 views
Sep 08 2013 (01:19)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 846374-1            Tags   Past Edits
No CRS Inspection is done for new broad-guage track yet. Possible only after CRS's node. Hopefully, Trains will run by second half of September.

  
1180 views
Sep 17 2013 (09:15)
SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Re# 846374-2            Tags   Past Edits
any source of info..? there is possibility of CRS has to come soon?

4 posts are hidden.

  
1119 views
Sep 18 2013 (12:47)
ckg2012   295 blog posts
Re# 846374-7            Tags   Past Edits
New train need between sri gangnagar to udaipur express via bikaner merta ajmer chittorgarh

2 posts are hidden.
  
General Travel
0 Followers
4265 views
Sep 13 2013 (11:26)   14709/Bikaner - Puri Express | SGNR/Shri Ganganagar Junction (3 PFs)
 

Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Entry# 850647            Tags   Past Edits
BKN-Puri may be extended to jammu via SGNR
click here

  
1663 views
Sep 13 2013 (14:28)
SGNR HS Inaugural 27 Feb^~   78797 blog posts   5089 correct pred (78% accurate)
Re# 850647-1            Tags   Past Edits
foolish of bhaskar .. 12489 bkn dadar ka rake h..

  
1628 views
Sep 13 2013 (14:30)
SGNR HS Inaugural 27 Feb^~   78797 blog posts   5089 correct pred (78% accurate)
Re# 850647-2            Tags   Past Edits
ise 12489 me tag kero ,, you have tagged wrongly ..

  
1591 views
Sep 13 2013 (15:14)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 850647-3            Tags   Past Edits
Yup!! Updated.

  
1604 views
Sep 13 2013 (18:35)
SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Re# 850647-4            Tags   Past Edits
bikaner dadar nahi.. bikaner puri ka rake jammu tak weekly chalayenge.. 14709/10 ye uska number hai...

9 posts are hidden.

  
3291 views
Sep 16 2013 (09:20)
SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Re# 850647-14            Tags   Past Edits
Keep patience ..abhii to ek hi train start hue hai... abhi bahot sari train milegi...
Hmh-kota ... and mumbai ke liye direct train.. amritsar ke liye bhi train milegi... agar sab thik raha to bikaner ke liye 1-2 hrs me ek train hogi...
  
General Travel
0 Followers
2902 views
Aug 23 2013 (21:26)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Trains from SGNR to ASR and BDTS are must   68 blog posts
Entry# 834732            Tags   Past Edits
DRM Bikaner Division inaugurated new washing line and sick line at SGNR station yesterday. It is possible that DEE-SGNR superfast may soon be extended to Bikaner...and CRS may inspect the newly constructed SGNR-HMH broadgauge line by 15th september. See the link...click here

7 posts are hidden.

  
1215 views
Aug 29 2013 (19:51)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 834732-8            Tags   Past Edits
Thanks for updating guys!!
I am also desperately waiting for daily run of dee-sgnr. Please keep all of us updated in future too.

1 posts are hidden.

  
1149 views
Sep 04 2013 (22:14)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 834732-10            Tags   Past Edits
This is great news. But If they had plan to introduced BKN-BDTS to sgnr, they need not to introduce special train for bikaner (sgnr-dee rake). Now, we may face a poor patronage in sgnr-bkn special as we'll have two trains for bikaner from sgnr, isn't it?

  
1218 views
Sep 05 2013 (00:24)
SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Re# 834732-11            Tags   Past Edits
Intercity. Rquire in day time.. bdts will runs in early morning by 4 and intercity will run by 8.. railway will also intriduce bkn - ldh via sgnr

5 posts are hidden.
  
Rail Budget
0 Followers
2144 views
Aug 31 2013 (13:59)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Entry# 840090            Tags   Past Edits
Does anybody know the status of survey of SGNR-BTI doubling
as this was announced in this budget
Can we expect announcement for doubling of track in next budget?
In addition to this survey of new rail line via padampur was also announced??
But
...
more...
no updates till the date

1 posts - Sun Sep 01, 2013

2 posts are hidden.

  
1261 views
Sep 02 2013 (20:23)
Trains from SGNR to ASR and BDTS are must   68 blog posts
Re# 840090-3            Tags   Past Edits
It hasn't yet started. However the survey of gajsinghpur-sadulpur line has been taken up and it will take two years to complete the survey

  
1112 views
Sep 02 2013 (21:28)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 840090-4            Tags   Past Edits
It's required buddy. Sometime it takes up to 30 mins for crossing in morning trains. You visit sgnr and get the feel of getting stuck in crossing :P :P

  
1275 views
Sep 02 2013 (22:02)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 840090-5            Tags   Past Edits
I got it. It will take 2 years for survey and next 10 years to rail... I got it..!! :D

  
1241 views
Sep 03 2013 (20:18)
Trains from SGNR to ASR and BDTS are must   68 blog posts
Re# 840090-6            Tags   Past Edits
The time line for completing the survey of BTI-SGNR doubling has not yet been finalized. You can check it on NRs website. Also one most not anticipate the doubling work to be started before 5 years at least. Reason:
There are 4 doubling surveys from BTI station has been announced. Among them BTI-FZR will be the first one to complete as it is the main line and SGNR-BTI section is a branch line so there will be competition with the other 2 lines BTI-RPJ and BTI-SOG lines.

  
1140 views
Sep 04 2013 (21:52)
SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Re# 840090-7            Tags   Past Edits
Only 14 rakes run daily... there is no need of doubling.. JP-swm route has more den 20 rakes per day.. railway increased d speed of trains on 132 km track.. and there lot of routes have 4-5 trains per hrs ..

1 posts are hidden.
  
General Travel
0 Followers
2345 views
Aug 30 2013 (20:56)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Trains from SGNR to ASR and BDTS are must   68 blog posts
Entry# 839637            Tags   Past Edits
Congrats to all rail fans from SGNR region. Railways will run tri weekly express train b/w SGNR-BKN wef september 09 2013. See the link..click here

5 posts - Sat Aug 31, 2013

6 posts are hidden.

  
1234 views
Aug 31 2013 (14:29)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 839637-7            Tags   Past Edits
Yes.But It can run daily if each morning they have a rake free to run bw sgnr and bkn. And currently sgnr-dee is tri weekly so sgnr has rake only on mon wed and fri.. once sgnr-dee will be daily then only we can run sgnr-bkn daily. Railway is not going to allot a new rake for this train.!!
Isliye All #AC @AC are in this train..otherwise it should ne CC-2S train...

  
1010 views
Aug 31 2013 (18:45)
SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Re# 839637-8            Tags   Past Edits
nice.. like it

  
994 views
Aug 31 2013 (19:01)
SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Re# 839637-9            Tags   Past Edits
bus ek hi problem hai Regular karne ke bad time thoda pahle ho jaye to acha hoga.. 2 baje ke bad bahot train miss ho jati hai.. long route ki..isliye 1.50 ki jagah 1.30 ka time hona chahiye..

  
989 views
Sep 01 2013 (14:08)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 839637-10            Tags   Past Edits
yes, I agree. And did you noticed After lalgarh station it takes 40 minutes for 4 kms... I didnt understand this..

  
1176 views
Sep 03 2013 (09:27)
SGNR๐Ÿš…๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐Ÿšƒ๐ŸšƒTPJ humsafar~   629 blog posts
Re# 839637-11            Tags   Past Edits
single line from lalgarh to bikaner.. bikaner station has 6 pfs.. sometimes all pf having rake of passengertrains and freight trains.. and sometines train reaches late at lalgarh station so system is only 4 km in 45mins.. wen track is clear the train stands up fo 30 mins on bikaner station
  
General Travel
0 Followers
911 views
Sep 02 2013 (21:24)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Entry# 841925            Tags   Past Edits
Preparations for CRS trip... Expecting before 10thh september,
click here
  
General Travel
0 Followers
3606 views
Jul 29 2013 (12:41)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Trains from SGNR to ASR and BDTS are must   68 blog posts
Entry# 816812            Tags   Past Edits
Railways should start SGNR-HMH track ASAP....and try to increase the facilities at both the stations...
see the link...click here

22 posts - Sat Aug 31, 2013

  
1404 views
Aug 31 2013 (14:14)
SGNR HS Inaugural 27 Feb^~   78797 blog posts   5089 correct pred (78% accurate)
Re# 816812-23            Tags   Past Edits
very long and circuitous route ..

  
1385 views
Aug 31 2013 (14:19)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 816812-24            Tags   Past Edits
I agree but see the connectivity.. sgnr-bkn-jp all connected by route. And It wasn't taking too much time for sgnr-jp run though.

  
1382 views
Aug 31 2013 (14:26)
SGNR HS Inaugural 27 Feb^~   78797 blog posts   5089 correct pred (78% accurate)
Re# 816812-25            Tags   Past Edits
it was a flop that time hence now rlwy didnt start it ..

  
1426 views
Aug 31 2013 (14:36)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 816812-26            Tags   Past Edits
Yes, I dont know why. Perhaps because it was a day train..

  
1398 views
Aug 31 2013 (15:04)
SGNR HS Inaugural 27 Feb^~   78797 blog posts   5089 correct pred (78% accurate)
Re# 816812-27            Tags   Past Edits
obviously ,, people are not fool fo long route .... people prefer direct bus

3 posts are hidden.
Page#    13 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Mar 8
Trains with ARP 15 Dep on: Mon Mar 13
Trains with ARP 30 Dep on: Tue Mar 28
Trains with ARP 120 Dep on: Mon Jun 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site