Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Mar 25, 2017 17:37:53 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Mar 25, 2017 17:37:53 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Nishant Pandey
Page#    13 Blog Entries  next>>
  
General Travel
0 Followers
4890 views
Sep 10 2013 (20:53)   04731/Bikaner - Haridwar Special Fare Special | SGNR/Shri Ganganagar Junction (3 PFs)
 

Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Entry# 848570            Tags   Past Edits
SGNR-BKN Successful Run on 9/9/13, 859 Passengers traveled in train with capacity of 650 approx.
click here

4 posts - Wed Sep 18, 2013

  
2603 views
Sep 22 2013 (10:15)
SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Re# 848570-5            Tags   Past Edits
Loco??any one has pic?

  
2528 views
Sep 22 2013 (14:07)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 848570-6            Tags   Past Edits
Sure!! It's in the link of my first post.!! It's WDP 4 :) :)

  
2471 views
Sep 29 2013 (15:42)
SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Re# 848570-7            Tags   Past Edits
WDP3A hai
WDP4 ki shakal to aisi hoti hi nahi.. or wo 4000 HP ki power create karta hai jo 18 coaches ki train ko khichta hai

  
2314 views
Sep 29 2013 (15:55)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 848570-8            Tags   Past Edits
incorrect .. photo me saaf likha hua hai wdp-3a pushpak...

  
3705 views
Oct 03 2013 (19:20)
Trains from SGNR to ASR and BDTS are must   68 blog posts
Re# 848570-9            Tags   Past Edits
I dont think it'll get further extension.....low patronage from SGNR station is the major reason...besides there is already a passenger train to SOG from SGNR stn after 30 min departure of this train....Railways need to sort out this
  
General Travel
0 Followers
2876 views
Sep 05 2013 (20:40)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Entry# 844451            Tags   Past Edits
Chances of sgnr-surat weekly special... Good News!!
click here

  
1148 views
Sep 05 2013 (20:41)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 844451-1            Tags   Past Edits
much needed .. first special .. then as regular

  
1212 views
Sep 12 2013 (23:42)
Trains from SGNR to ASR and BDTS are must   68 blog posts
Re# 844451-2            Tags   Past Edits
yeah it is being said that it will be a weekly train

1 posts are hidden.

  
1064 views
Sep 25 2013 (20:55)
Trains from SGNR to ASR and BDTS are must   68 blog posts
Re# 844451-4            Tags   Past Edits
Well another weekly Puja special train for SGNR. (Train no. 04723)..This time to Jammu via ABS, FZLK, FZR....from 02/10/13 to 27/11/13. Click here...click here

  
1010 views
Sep 25 2013 (23:35)
ARUN SINGH RAJPUROHIT*^~   2077 blog posts   2842 correct pred (65% accurate)
Re# 844451-5            Tags   Past Edits
waave great news!!
plz tag it under 04723
i wish to run this in its old route i.e 04723 via samdhari-jalore-bhildi

4 posts are hidden.
  
General Travel
0 Followers
1986 views
Sep 20 2013 (19:23)   SGNR/Shri Ganganagar Junction (3 PFs)
 

vdnsshukla1978   11 blog posts   20 correct pred (51% accurate)
Entry# 856614            Tags   Past Edits
how to reach ganganagar from ahmedabad

2 posts are hidden.

  
1549 views
Sep 21 2013 (14:32)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 856614-3            Tags   Past Edits
Ahmedabad-Jammu tawi .. to Suratgarh , den take a bus or taxi..
  
General Travel
0 Followers
2479 views
Sep 08 2013 (00:19)   SGNR/Shri Ganganagar Junction (3 PFs)
 

SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Entry# 846374            Tags   Past Edits
Wats d result of hmh-kota sf extension to sgnr???.

  
1142 views
Sep 08 2013 (01:19)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 846374-1            Tags   Past Edits
No CRS Inspection is done for new broad-guage track yet. Possible only after CRS's node. Hopefully, Trains will run by second half of September.

  
1192 views
Sep 17 2013 (09:15)
SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Re# 846374-2            Tags   Past Edits
any source of info..? there is possibility of CRS has to come soon?

4 posts are hidden.

  
1139 views
Sep 18 2013 (12:47)
ckg2012   295 blog posts
Re# 846374-7            Tags   Past Edits
New train need between sri gangnagar to udaipur express via bikaner merta ajmer chittorgarh

2 posts are hidden.
  
General Travel
0 Followers
4305 views
Sep 13 2013 (11:26)   14709/Bikaner - Puri Express | SGNR/Shri Ganganagar Junction (3 PFs)
 

Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Entry# 850647            Tags   Past Edits
BKN-Puri may be extended to jammu via SGNR
click here

  
1677 views
Sep 13 2013 (14:28)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 850647-1            Tags   Past Edits
foolish of bhaskar .. 12489 bkn dadar ka rake h..

  
1641 views
Sep 13 2013 (14:30)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 850647-2            Tags   Past Edits
ise 12489 me tag kero ,, you have tagged wrongly ..

  
1604 views
Sep 13 2013 (15:14)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 850647-3            Tags   Past Edits
Yup!! Updated.

  
1623 views
Sep 13 2013 (18:35)
SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Re# 850647-4            Tags   Past Edits
bikaner dadar nahi.. bikaner puri ka rake jammu tak weekly chalayenge.. 14709/10 ye uska number hai...

9 posts are hidden.

  
3321 views
Sep 16 2013 (09:20)
SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Re# 850647-14            Tags   Past Edits
Keep patience ..abhii to ek hi train start hue hai... abhi bahot sari train milegi...
Hmh-kota ... and mumbai ke liye direct train.. amritsar ke liye bhi train milegi... agar sab thik raha to bikaner ke liye 1-2 hrs me ek train hogi...
  
General Travel
0 Followers
2940 views
Aug 23 2013 (21:26)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Trains from SGNR to ASR and BDTS are must   68 blog posts
Entry# 834732            Tags   Past Edits
DRM Bikaner Division inaugurated new washing line and sick line at SGNR station yesterday. It is possible that DEE-SGNR superfast may soon be extended to Bikaner...and CRS may inspect the newly constructed SGNR-HMH broadgauge line by 15th september. See the link...click here

7 posts are hidden.

  
1233 views
Aug 29 2013 (19:51)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 834732-8            Tags   Past Edits
Thanks for updating guys!!
I am also desperately waiting for daily run of dee-sgnr. Please keep all of us updated in future too.

1 posts are hidden.

  
1163 views
Sep 04 2013 (22:14)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 834732-10            Tags   Past Edits
This is great news. But If they had plan to introduced BKN-BDTS to sgnr, they need not to introduce special train for bikaner (sgnr-dee rake). Now, we may face a poor patronage in sgnr-bkn special as we'll have two trains for bikaner from sgnr, isn't it?

  
1242 views
Sep 05 2013 (00:24)
SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Re# 834732-11            Tags   Past Edits
Intercity. Rquire in day time.. bdts will runs in early morning by 4 and intercity will run by 8.. railway will also intriduce bkn - ldh via sgnr

5 posts are hidden.
  
Rail Budget
0 Followers
2182 views
Aug 31 2013 (13:59)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Entry# 840090            Tags   Past Edits
Does anybody know the status of survey of SGNR-BTI doubling
as this was announced in this budget
Can we expect announcement for doubling of track in next budget?
In addition to this survey of new rail line via padampur was also announced??
But
...
more...
no updates till the date

1 posts - Sun Sep 01, 2013

2 posts are hidden.

  
1279 views
Sep 02 2013 (20:23)
Trains from SGNR to ASR and BDTS are must   68 blog posts
Re# 840090-3            Tags   Past Edits
It hasn't yet started. However the survey of gajsinghpur-sadulpur line has been taken up and it will take two years to complete the survey

  
1129 views
Sep 02 2013 (21:28)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 840090-4            Tags   Past Edits
It's required buddy. Sometime it takes up to 30 mins for crossing in morning trains. You visit sgnr and get the feel of getting stuck in crossing :P :P

  
1299 views
Sep 02 2013 (22:02)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 840090-5            Tags   Past Edits
I got it. It will take 2 years for survey and next 10 years to rail... I got it..!! :D

  
1263 views
Sep 03 2013 (20:18)
Trains from SGNR to ASR and BDTS are must   68 blog posts
Re# 840090-6            Tags   Past Edits
The time line for completing the survey of BTI-SGNR doubling has not yet been finalized. You can check it on NRs website. Also one most not anticipate the doubling work to be started before 5 years at least. Reason:
There are 4 doubling surveys from BTI station has been announced. Among them BTI-FZR will be the first one to complete as it is the main line and SGNR-BTI section is a branch line so there will be competition with the other 2 lines BTI-RPJ and BTI-SOG lines.

  
1165 views
Sep 04 2013 (21:52)
SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Re# 840090-7            Tags   Past Edits
Only 14 rakes run daily... there is no need of doubling.. JP-swm route has more den 20 rakes per day.. railway increased d speed of trains on 132 km track.. and there lot of routes have 4-5 trains per hrs ..

1 posts are hidden.
  
General Travel
0 Followers
2390 views
Aug 30 2013 (20:56)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Trains from SGNR to ASR and BDTS are must   68 blog posts
Entry# 839637            Tags   Past Edits
Congrats to all rail fans from SGNR region. Railways will run tri weekly express train b/w SGNR-BKN wef september 09 2013. See the link..click here

5 posts - Sat Aug 31, 2013

6 posts are hidden.

  
1263 views
Aug 31 2013 (14:29)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 839637-7            Tags   Past Edits
Yes.But It can run daily if each morning they have a rake free to run bw sgnr and bkn. And currently sgnr-dee is tri weekly so sgnr has rake only on mon wed and fri.. once sgnr-dee will be daily then only we can run sgnr-bkn daily. Railway is not going to allot a new rake for this train.!!
Isliye All #AC @AC are in this train..otherwise it should ne CC-2S train...

  
1036 views
Aug 31 2013 (18:45)
SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Re# 839637-8            Tags   Past Edits
nice.. like it

  
1017 views
Aug 31 2013 (19:01)
SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Re# 839637-9            Tags   Past Edits
bus ek hi problem hai Regular karne ke bad time thoda pahle ho jaye to acha hoga.. 2 baje ke bad bahot train miss ho jati hai.. long route ki..isliye 1.50 ki jagah 1.30 ka time hona chahiye..

  
1013 views
Sep 01 2013 (14:08)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 839637-10            Tags   Past Edits
yes, I agree. And did you noticed After lalgarh station it takes 40 minutes for 4 kms... I didnt understand this..

  
1202 views
Sep 03 2013 (09:27)
SGNR🚅🚃🚃🚃🚃🚃🚃🚃🚃TPJ humsafar~   657 blog posts
Re# 839637-11            Tags   Past Edits
single line from lalgarh to bikaner.. bikaner station has 6 pfs.. sometimes all pf having rake of passengertrains and freight trains.. and sometines train reaches late at lalgarh station so system is only 4 km in 45mins.. wen track is clear the train stands up fo 30 mins on bikaner station
  
General Travel
0 Followers
926 views
Sep 02 2013 (21:24)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Entry# 841925            Tags   Past Edits
Preparations for CRS trip... Expecting before 10thh september,
click here
  
General Travel
0 Followers
3653 views
Jul 29 2013 (12:41)   SGNR/Shri Ganganagar Junction (3 PFs)
 

Trains from SGNR to ASR and BDTS are must   68 blog posts
Entry# 816812            Tags   Past Edits
Railways should start SGNR-HMH track ASAP....and try to increase the facilities at both the stations...
see the link...click here

22 posts - Sat Aug 31, 2013

  
1418 views
Aug 31 2013 (14:14)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 816812-23            Tags   Past Edits
very long and circuitous route ..

  
1402 views
Aug 31 2013 (14:19)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 816812-24            Tags   Past Edits
I agree but see the connectivity.. sgnr-bkn-jp all connected by route. And It wasn't taking too much time for sgnr-jp run though.

  
1397 views
Aug 31 2013 (14:26)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 816812-25            Tags   Past Edits
it was a flop that time hence now rlwy didnt start it ..

  
1443 views
Aug 31 2013 (14:36)
Nishant Pandey   28 blog posts   1 correct pred (33% accurate)
Re# 816812-26            Tags   Past Edits
Yes, I dont know why. Perhaps because it was a day train..

  
1414 views
Aug 31 2013 (15:04)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 816812-27            Tags   Past Edits
obviously ,, people are not fool fo long route .... people prefer direct bus

3 posts are hidden.
Page#    13 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Apr 4
Trains with ARP 15 Dep on: Sun Apr 9
Trains with ARP 30 Dep on: Mon Apr 24
Trains with ARP 120 Dep on: Sun Jul 23

  
  

Rail News

  • പുതിയ ട്രെയിനുകള്‍ക്ക് ടൗണ്‍സ്റ്റേഷനില്‍ സ്റ്റോപ്പനുവദിക്കണം  News Entry# 297611
    by: Saran  Today (16:36)


    പാലക്കാട് : പുതുതായി ആരംഭിക്കുന്ന രണ്ട് ട്രെയിനുകള്‍ക്ക് ടൗണ്‍സ്റ്റേഷനില്‍ സ്റ്റോപ്പനുവദിക്കണമെന്നാവശ്യപ്പെട്ട് ശൈവവെള്ളാള സര്‍വീസ് സൊസൈറ്റി പ്രധാനമന്ത്രി, റെയില്‍വേമന്ത്രി, സംസ്ഥാന റെയില്‍വേമന്ത്രി, ഡി.ആര്‍.എം., എം.പി. എന്നിവര്‍ക്ക് നിവേദനംനല്‍കും. എറണാകുളത്തുനിന്ന് രാമേശ്വരത്തേക്കും പുണെയില്‍നിന്ന് തിരുനെല്‍വേലിയിലേക്കുമാണ് ട്രെയിനുകള്‍ തുടങ്ങുന്നത്. പാലക്കാട് ജങ്ഷനിലെത്തുന്ന ഇരു ട്രെയിനുകളും അരമണിക്കൂര്‍ നിര്‍ത്തിയിട്ടശേഷമാണ് പാലക്കാട് ടൗണിനെ നോക്കുകുത്തിയാക്കി കടന്നുപോകുന്നത്. നിത്യേന ആയിരക്കണക്കിനാളുകള്‍ തമിഴ്‌നാട്ടിലെ പൊള്ളാച്ചി, മധുര, പഴനി, രാമേശ്വരം, ദിണ്ടിക്കല്‍ എന്നിവിടങ്ങളിലേക്ക് വിവിധ ആവശ്യങ്ങള്‍ക്കായി പോയിവരുന്നുണ്ട്. എട്ടുവര്‍ഷത്തിന് ശേഷമാണ് പുതിയ രണ്ട്...
  • एसकेलेटर व लिफ्ट का दो साल से लोगों को इंतजार  News Entry# 297610
    by: Divert ShalimarGorakhpur Express via BKSC*^~  Today (15:54)


    जागरण संवाददाता, बोकारो : बोकारो स्टेशन के ए-ग्रेड में शामिल होते ही स्टेशन को हाईटेक बनाने के लिए जोर शोर से घोषणा का काम हो रहा है। यात्रियों को बीते दो वर्षो से स्टेशन पर लिफ्ट, एसकेलेटर लगने का इंतजार हो रहा है। रेल प्रशासन ने जितनी भी घोषणाएं की थीं,...
  • पॉश मशीन से मिलेगा रेलवे आरक्षण टिकट  News Entry# 297609
    by: Divert ShalimarGorakhpur Express via BKSC*^~  Today (15:43)


    बोकारो : रेलवे द्वारा चलाए जा रहे दो दिवसीय डिजिटल कैंपेन का असर स्टेशन व सिटी बुकिंग के आरक्षण केंद्रों पर देखने को मिल रही है। बोकारो स्टेशन पर आरक्षण टिकट का भुगतान ज्यादा से ज्यादा पॉश मशीन से हो इसके लिए यात्रियों में जागरूकता फैलाने के उद्देश्य स्टेशन व सिटी...
  • सवारी गाड़ी से भारी मात्र में कोयला जब्त  News Entry# 297608
    by: Divert ShalimarGorakhpur Express via BKSC*^~  Today (15:41)


    बोकारो : आरपीएफ ने सवारी गाड़ी से भारी मात्र में अवैध कोयला जब्त किया है। जानकारी के अनुसार शुक्रवार को झाड़ग्राम सवारी गाड़ी के विभिन्न बोगियों से सात बोरा अवैध कोयला जब्त किया। मौके पर किसी कि गिरफ्तारी नहीं हो सकी है। आरपीएफ द्वारा बोकारो स्टेशन पर ट्रेनों से हो रही...
  • डीसी रेललाइन को बंद करने की वकालत  News Entry# 297607
    by: Divert ShalimarGorakhpur Express via BKSC*^~  Today (15:37)


    जागरण संवाददाता, धनबाद : डीजीएमएस के प्रभारी डीजी पीके सरकार की अध्यक्षता में हुई दस सदस्यीय कमेटी की बैठक में रेलवे को छोड़कर सभी सदस्यों ने एक स्वर में धनबाद-चंद्रपुरा रेललाइन को असुरक्षित बताते हुए तत्काल प्रभाव से उसे बंद करने की बात की। डीजीएमएस के डीजी ने यात्रियों की सुरक्षा...

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site