Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Feb 24, 2017 21:21:08 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Feb 24, 2017 21:21:08 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by santosh kumar singh
Page#    192 Blog Entries  next>>
  
Rail News
0 Followers
477 views
New/Special TrainsNER/North Eastern  -  
Nov 08 2016 (06:46)   A new express train to be launched today for poll-bound U.P.

rdb*^   126032 news posts
Entry# 2053635   News Entry# 285088         Tags   Past Edits
A new express train will be launched on Tuesday between Gorakhpur and Badshahnagar in the poll-bound Uttar Pradesh to cater to the growing demand of passengers in the region.
The daily Gorakhpur-Badshahnagar Express will be flagged off from Gorakhpur by Railway Minister Suresh Prabhu through video conferencing from Rail Bhawan here, said a senior Railway Ministry official.
Besides the Gorakhpur-Badshahnagar Express, six more new trains, including the first Humsafar service, are slated to be launched by the month-end.
The
...
more...
Gorakhpur-Badshahnagar Express is expected to be a link between Gorakhpur and Lucknow through Barhni and will stop at Anand Nagar, Naugarh, Balrampur, Sohratgarh, Barhni, Tulsipur, Gonda, Barabanki and Malhaur enroute both directions.
Local representatives of Gorakhpur and nearby districts are expected to grace the flagging off function at Gorakhpur.
Ahead of Assembly elections in Uttar Pradesh, the Railways, which has already introduced about 57 trains in the last two-and-half years in the State are gearing up to introduce eight more new trains.
Besides, 142 special trains originating and terminating in the State and 550 specials passing through UP are already being pressed into service to clear the extra rush due to various festivalsin the current fiscal.
The much hyped fully AC-3 Humsafar Express for Gorakhpur will be the first among ten Humsafar trains proposed for various states to be flagged off by railways next month in the election—bound State.
Humsafar AC-3 coaches, specially designed with enhanced aesthetics interior and a new exterior colour scheme, are also equipped with CCTV system, fire detection and prevention system and integrated Braille displays among other facilities.
Train service between Gorakhpur-Lokmanya Tilak Terminus, Gorakhpur-Panvel, Gorakhpur-Bandra Terminus, Ghazipur-Kolkata, Jaunpur-Bandra Terminus, Deendayalu-Antyodaya Express between Mughalsarai-Nizamuddin through Mathura are slated to be launched in the coming days in U.P.

  
1287 views
Nov 09 2016 (12:17)
santosh kumar singh   227 blog posts   70 correct pred (63% accurate)
Re# 2053635-1            Tags   Past Edits
good decision by railway
gorakhpur need more and more train from different location.
  
Rail News
0 Followers
508 views
New/Special TrainsNER/North Eastern  -  
Nov 08 2016 (06:46)   A new express train to be launched today for poll-bound U.P.

rdb*^   126032 news posts
Entry# 2053243   News Entry# 285088         Tags   Past Edits
A new express train will be launched on Tuesday between Gorakhpur and Badshahnagar in the poll-bound Uttar Pradesh to cater to the growing demand of passengers in the region.
The daily Gorakhpur-Badshahnagar Express will be flagged off from Gorakhpur by Railway Minister Suresh Prabhu through video conferencing from Rail Bhawan here, said a senior Railway Ministry official.
Besides the Gorakhpur-Badshahnagar Express, six more new trains, including the first Humsafar service, are slated to be launched by the month-end.
The
...
more...
Gorakhpur-Badshahnagar Express is expected to be a link between Gorakhpur and Lucknow through Barhni and will stop at Anand Nagar, Naugarh, Balrampur, Sohratgarh, Barhni, Tulsipur, Gonda, Barabanki and Malhaur enroute both directions.
Local representatives of Gorakhpur and nearby districts are expected to grace the flagging off function at Gorakhpur.
Ahead of Assembly elections in Uttar Pradesh, the Railways, which has already introduced about 57 trains in the last two-and-half years in the State are gearing up to introduce eight more new trains.
Besides, 142 special trains originating and terminating in the State and 550 specials passing through UP are already being pressed into service to clear the extra rush due to various festivalsin the current fiscal.
The much hyped fully AC-3 Humsafar Express for Gorakhpur will be the first among ten Humsafar trains proposed for various states to be flagged off by railways next month in the election—bound State.
Humsafar AC-3 coaches, specially designed with enhanced aesthetics interior and a new exterior colour scheme, are also equipped with CCTV system, fire detection and prevention system and integrated Braille displays among other facilities.
Train service between Gorakhpur-Lokmanya Tilak Terminus, Gorakhpur-Panvel, Gorakhpur-Bandra Terminus, Ghazipur-Kolkata, Jaunpur-Bandra Terminus, Deendayalu-Antyodaya Express between Mughalsarai-Nizamuddin through Mathura are slated to be launched in the coming days in U.P.

  
506 views
Nov 08 2016 (20:14)
santosh kumar singh   227 blog posts   70 correct pred (63% accurate)
Re# 2053243-1            Tags   Past Edits
good decision by railway
gorakhpur need more and more train from different location.

  
536 views
Nov 08 2016 (20:25)
Montez~   2390 blog posts   1582 correct pred (60% accurate)
Re# 2053243-2            Tags   Past Edits
Yea, exactly
How about few Durontos between GKP and NDLS, CSTM, KOAA, and other metros?
Will that be enough?
Guess not :(
A bunch of Rajdhanis, Shatabdis and Double-Deckers to supplement them would be indispensable
...
more...

How about renaming Indian Railways as Gorakhpur Railways as well?
I believe this much would be sufficient for GKP for the next 2-3 days post which more trains would be required :)
  
Rail News
0 Followers
1552 views
New Facilities/TechnologyNER/North Eastern  -  
Sep 18 2016 (08:00)   जंक्शन से रात आठ बजे रवाना होगी हमसफर एक्सप्रेस
 

santosh kumar singh   182 news posts
Entry# 1994998   News Entry# 280475         Tags   Past Edits
गोरखपुर। वरिष्ठ संवाददातादेश की पहली हमसफर एक्सप्रेस गोरखपुर से आनन्द विहार के बीच अक्तूबर के दूसरे हफ्ते से चलेगी। यह ट्रेन गोरखपुर से रात आठ बजे रवाना होगी और सुबह साढ़े आठ बजे आनंद विहार पहुंच जाएगी। आनन्द विहार से यह रात आठ बजे रवाना होकर सुबह साढ़े आठ बजे गोरखपुर पहुंचेगी। रेलवे ने हमसफर एक्सप्रेस के चलने की टाइमिंग और ट्रेन नंबर जारी कर दिया है। गोरखपुर से चलने वाली ट्रेन का नम्बर 12595 और आनंद विहार से चलने वाली ट्रेन का नंबर 12596 होगा। गोरखपुर से आनन्द विहार जाने वाली यह पहली ट्रेन होगी जो महज 12:30 घंटे में यात्र पूरा करेगी। अभी जो ट्रेनें जाती हैं वह न्यूनतम 14 घंटे का समय लेती है। पूर्वोत्तर रेलवे ने रेलमंत्री सुरेश प्रभु को हमसफर को हरी झण्डी दिखाने के साथ ही कई परियोजनाओं का शुभारम्भ करने के लिए आमंत्रित किया है। अक्तूबर के दूसरे हफ्ते में यह ट्रेन शुरू हो...
more...
सकती है। रेलवे की एक अक्तूबर से जारी होने वाली नई टाइम टेबल में हमसफर को शामिल कर लिया गया है। उसमें इसकी टाइमिंग, चलने के दिन और ट्रेन नम्बर अंकित हो चुके हैं। 29 सितम्बर तक टाइम टेबल छपकर आ जाएगा।
’ सभी कोच वातानुकूलित तृतीय श्रेणी ’ सभी कोच एलएचबी ’ सीसीटीवी कैमरे से लैस बोगियां ’ एंटी फायर डिवाइस’ ब्रेल लिपी में सीट नम्बर ’ हमसफर एक नजर में ’ कहां से कहां तक-गोरखपुर से आनन्द विहार ’ गोरखपुर से चलने का दिन -रविवार, मंगलवार और गुरुवार ’ आनन्द विहार से चलने का दिन-सोमवार, बुधवार और शुक्रवार’ यहां होगा स्टॉपेज-लखनऊ, कानपुर

  
1852 views
Sep 18 2016 (08:25)
GD HS SKD the pride of NER   1337 blog posts   60 correct pred (77% accurate)
Re# 1994998-1            Tags   Past Edits
Yaar ye badi confusion hai kahi likha hai 8:30 aur kahi subah 7:00 baje. Kya hongi actual timings. Ab to bas official TT ka wait kar sakte hai santosh bhai. Waise to shayad aap bhi chahte hoge ki 7:00 baje waali news sahi nikle aur train 11hrs. me delhi pahucha de.

3 posts are hidden.

  
1732 views
Sep 18 2016 (13:19)
GZB WAP7 30211 WITH GD sf AT GORAKHPUR JN~   5151 blog posts   10 correct pred (50% accurate)
Re# 1994998-6            Tags   Past Edits
good lagta hai aaj ki taza khabar hai iri ki pora forum bhara hua hai..........:D

1 posts are hidden.

  
1299 views
Sep 18 2016 (18:30)
Rajat   1426 blog posts   14 correct pred (91% accurate)
Re# 1994998-8            Tags   Past Edits
train ka no. dekhkar ek tassali h ki primary maintenance NR ko nhi mila warna 1-2 coaches humsafar k rajdhani's me dekhne ko milte.

1 posts are hidden.
  
Imaginary
0 Followers
367 views
07
Sep 07 2016 (16:36)   IMG67448/♥♥FIROZPUR-GORAKHPUR SUPERFAST EXPRESS♥♥
 

santosh kumar singh   26 img trains   7 popular
98 green flags   45 red flags   2 green per Train
Entry# 1983958            Tags   Past Edits
good imaginary train
  
Imaginary
0 Followers
367 views
07
Sep 07 2016 (16:30)   IMG48771/♥♥GORAKHPUR-UJJAIN EXPRESS♥♥
 

santosh kumar singh   26 img trains   7 popular
98 green flags   45 red flags   2 green per Train
Entry# 1983950            Tags   Past Edits
nice thought
good train
  
Imaginary
0 Followers
1624 views
22
Sep 02 2016 (15:49)   IMG15243/♥♥Mfp rajdhani♥♥
 

santosh kumar singh   26 img trains   7 popular
98 green flags   45 red flags   2 green per Train
Entry# 1979276            Tags   Past Edits
it cant be a rajdhani

  
364 views
Sep 02 2016 (17:07)
amaljha411   236 blog posts
Re# 1979276-1            Tags   Past Edits
Why

2 posts are hidden.

  
891 views
Sep 02 2016 (20:13)
Enjoying wapies action~   535 blog posts
Re# 1979276-4            Tags   Past Edits
I think railway should introduce a class of premium trains like rajdhani to the important cities with same priority as rajdhani.....

7 posts are hidden.

  
478 views
Sep 03 2016 (22:36)
GKP LKO Section 120kmph Sucessful Trail Done~   2407 blog posts   4 correct pred (100% accurate)
Re# 1979276-12            Tags   Past Edits
Better hoga aap humsafar exp create kare mfp se
  
Imaginary
0 Followers
552 views
Aug 27 2016 (17:44)  
 

santosh kumar singh   26 img trains   7 popular
98 green flags   45 red flags   2 green per Train
Entry# 1974130            Tags   Past Edits
nice train
is it duranto
without stoppage
very nice speed

  
554 views
Aug 27 2016 (17:50)
Waiting MEMU for GD BBK LJN   176 blog posts
Re# 1974130-1            Tags   Past Edits
Not Possible Duronto
  
Imaginary
0 Followers
368 views
08
Aug 27 2016 (17:41)   IMG92542/♥♥LOKMANYA TILAK TERMINUS - GORAKHPUR AC SUPERFAST EXPRESS♥♥
 

santosh kumar singh   26 img trains   7 popular
98 green flags   45 red flags   2 green per Train
Entry# 1974127            Tags   Past Edits
nice train
speeded up more its ac superfast exp
  
Imaginary
0 Followers
470 views
08
Aug 27 2016 (17:40)   IMG24658/♥♥Bandra Terminus - Raxaul Jn Weekly Superfast Express Via Kanpur Central♥♥
 

santosh kumar singh   26 img trains   7 popular
98 green flags   45 red flags   2 green per Train
Entry# 1974124            Tags   Past Edits
nice train
  
Predictions: 16
confirm: 3
rac: 13
wl: 0
Journey: Sun Aug 14, 2016 @ 23:45
Class: Sleeper - SL   |   Tot Seats: Avbl 337
Travel: TNA/Thane   to   MAO/Madgaon Junction   |   548 km / 581 km
10111/Konkan Kanya Express (PT)
Entry# 1945292

Posted by: santosh kumar singh   227 blog posts   70 correct pred (63% accurate)
PNR: 814-xxxxxxx (PRS)   |   Similar PNRs
Posted Status as of: Jul 29 2016 (17:44)
Passenger 1: Waitlist# 45 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 46 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Aug 14 2016 (19:11)
Passenger 1: S3,55 [SL] (Booking Status: W/L 64,GNWL)
Passenger 2: S3,56 [SU] (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart PREPARED

Full PNR Status History (31 statuses)
Status as of: Aug 14 2016 (19:01)
Passenger 1: S3,55 [SL] (Booking Status: W/L 64,GNWL)
Passenger 2: S3,56 [SU] (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart PREPARED

Status as of: Aug 14 2016 (16:48)
Passenger 1: RAC 32 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 33 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 14 2016 (07:14)
Passenger 1: RAC 33 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 34 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 13 2016 (20:34)
Passenger 1: RAC 35 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 36 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 13 2016 (18:26)
Passenger 1: RAC 36 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 37 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 13 2016 (14:04)
Passenger 1: RAC 42 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 43 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 13 2016 (12:19)
Passenger 1: RAC 44 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 45 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 13 2016 (09:38)
Passenger 1: RAC 55 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 56 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 12 2016 (22:13)
Passenger 1: RAC 60 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 61 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 12 2016 (10:14)
Passenger 1: RAC 67 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 68 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 11 2016 (19:33)
Passenger 1: RAC 69 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 70 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 11 2016 (17:43)
Passenger 1: RAC 71 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 72 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 11 2016 (14:59)
Passenger 1: RAC 73 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 74 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 11 2016 (11:40)
Passenger 1: RAC 80 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 81 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 10 2016 (18:15)
Passenger 1: RAC 81 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 82 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 09 2016 (20:58)
Passenger 1: RAC 85 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 86 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 09 2016 (16:39)
Passenger 1: RAC 86 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 87 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 09 2016 (13:05)
Passenger 1: RAC 95 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 96 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 08 2016 (22:40)
Passenger 1: RAC 102 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 103 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 08 2016 (13:58)
Passenger 1: RAC 110 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 111 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 07 2016 (14:10)
Passenger 1: RAC 127 (Booking Status: W/L 64,GNWL)
Passenger 2: RAC 128 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 06 2016 (11:46)
Passenger 1: Waitlist# 3 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 4 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 05 2016 (21:45)
Passenger 1: Waitlist# 4 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 5 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 05 2016 (15:07)
Passenger 1: Waitlist# 10 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 11 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 05 2016 (06:50)
Passenger 1: Waitlist# 15 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 16 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 04 2016 (15:24)
Passenger 1: Waitlist# 18 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 19 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 04 2016 (06:57)
Passenger 1: Waitlist# 26 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 27 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 02 2016 (19:49)
Passenger 1: Waitlist# 30 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 31 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Aug 02 2016 (14:10)
Passenger 1: Waitlist# 35 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 36 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Jul 31 2016 (10:22)
Passenger 1: Waitlist# 38 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 39 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared

Status as of: Jul 29 2016 (17:44)
Passenger 1: Waitlist# 45 (Booking Status: W/L 64,GNWL)
Passenger 2: Waitlist# 46 (Booking Status: W/L 65,GNWL)
Passenger 3: NOSB (Booking Status: NOSB ,GN)
Total Fare:  490
Chart NOT Prepared


  
3625 views
Aug 14 2016 (18:38)
Aditya Siddharth   8900 blog posts   9924 correct pred (85% accurate)
Re# 1945292-1            Tags   Past Edits
PT 73 Avl.

2 posts are hidden.
Page#    192 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Mar 6
Trains with ARP 15 Dep on: Sat Mar 11
Trains with ARP 30 Dep on: Sun Mar 26
Trains with ARP 120 Dep on: Sat Jun 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Yesterday (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site