Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Apr 25 05:17:27 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Blog Posts by Sauron still has the ring
Page#    42 Blog Entries  next>>
Info Update
7747 views
0

Jan 08 2020 (10:27)   11077/Jhelum Express (PT)
Abhinandan Dhar
Abhinandan Dhar   54 blog posts
Entry# 4534344            Tags   Past Edits
Any news on LHBfication of this train?
Translate to English
Translate to Hindi
Info Update
7747 views
0

Jan 08 2020 (10:26)   12129/Azad Hind Express (PT)
Abhinandan Dhar
Abhinandan Dhar   54 blog posts
Entry# 4534343            Tags   Past Edits
any news on LHBfication of this train?
Translate to English
Translate to Hindi

1 Public Posts - Wed Jan 08, 2020
General Travel
4107 views
1

Jan 08 2020 (09:11)   12123/Deccan Queen
parag2615
parag2615   618 blog posts
Entry# 4534266            Tags  
News about LHB Dining Car
click here
Translate to English
Translate to Hindi

3358 views
2

Jan 08 2020 (10:21)
Abhinandan Dhar   54 blog posts
Re# 4534266-1              
good ..i just hope coaches do not get mixed up with other train coaches in later days
Translate to English
Translate to Hindi
Travelogue
7643 views
1

Sep 27 2019 (21:07)   12222/Howrah - Pune AC Duronto Express | HWH/Howrah Junction (23 PFs) | SRC/WAP-7
Abhinandan Dhar
Abhinandan Dhar   54 blog posts
Entry# 4440497            Tags   Past Edits
My 2nd travel blog after 20821 travel blog:
So dear friends posting my 2nd blog of travel undertaken by 12222 from Howrah to Pune.
Day 1:
My ticket was already confirmed whilst booking from IRCTC but had got Upper Berth in 2AC in spite of selecting SL while doing the bookings.Anyways IRCTC has its own algorithms for seat allocations but our algorithms of changing
...
more...
seats with our co passengers can even beat IRCTC algorithms.I had this idea in mind of changing seats within our co passengers if it doesn't work then i had to occupy my upper berth only which was allotted.
Reached station by 7.30 am and then enjoyed fresh tea in mitti ka kulhaar which is to be found only in that side of India. After having tea, saw that the platform was still not allotted for 12222, so out of my hunch started walking towards platform 22 and was waiting a bit towards the entrance and then heard that 12222 will depart from platform no. 21. so wrong intuition.Started to walk towards platform 21 and thinking that 2nd AC will be the coaches at the start of the train, so had walked quite a bit towards Mumbai side, but when the train was placed on the platform found my coach to be the last one towards howrah. 2nd time wrong intuition.Again went back and boarded my A3(2nd AC ) coach. It was duronto livery of 2012 made but with the condition of the coached one could make out that it could be very old, with no buttons on reading lamps, no charging points on the SL berths, fixtures were dangling from their originating parts. Anyways kept my luggage on my upper berth and was waiting for TC to come so that seats could have been changed.Found the coach attendant with the occupancy list and what i saw was only 20 seats out of 56 odd seats were booked..rest the entire coach was empty. I asked the attendant to give me any SL seat which he readily gave me.I happily shifted my luggage underneath my allotted seat and sat merrily waiting for train to start.
Sharp at 8.20 am with a shrilling honk SRC P7 started moving out taking our train to the western side of India.Choice of food orders were taken as for me it was all non veg throughout the journey.Newspapers and water bottles were distributed. Our train eventually picked up speed as soon as santragachi shed passed although with jerks which was quite evident during acceleration and deacceleration tht CBC couplers were not fixed yet on these coaches.I was enjoying my view outside as it was sunny and the suburbans trains and stations were passing in a whiff.Breakfast was served just before kharagpur and till this time the train had maintained its speed and schedule only to slow down while passing kharagpur station.After passing kharagpur the train again picked up speed and was moving steadily towards its first halt at Tatanagar at 11.30 am.
The first halt Tatanagar comes sharp at 11.30 am which means that the train is well on its schedule.After a 10 min halt and again the customary jerk we move out of Tatanagar ready to enter the state of Odisha. None of the stations of Odisha be it Rourkela, Jharsugda has any halts for this train.So it skipped all of them and next halt would be Bilaspur which falls in Chattisgarh state.Meanwhile lunch was served at usual time skipping the soup as it has been discontinued except 1A class. Even the sweet dish from the lunch and dinner menu is discontinued.after having a good lunch I decided to take a small nap which ended at 4.00. Tea packets were given and I thought of having black tea keeping the milk sachet aside. Bilaspur was dot on at 5.30 pm. After a brief 10 min halt and with jerk, we started our journey for our next halt at Nagpur(my residence state of Maharashtra).Dinner was served by 8.00 am and while having dinner was watching the illuminated pathway of famous Dongargarh temple through my window.After having dinner and customary vanilla ice cream it was to hit the bed.
Day 2:
Woke up 5.30 am while the train had maintained its good speed, Manmad came sharp at 6.00 am which means it was in its scheduled time. Morning tea was served after the train departed Manmad without any reversal as the entire route is now electrified. Breakfast was served somewhere between 8.30 am and till now the train was going in decent speed in spite of single line route only to stop at belwandi to give way to one speeding train which I missed reading.Daund came sharp at 10 am but with the loco reversal and customary testing of loco attachments it left at 10.30 am. Could see the bypass line fully ready but the station/platform work was in progress and was far from complete.
Yavat, Loni, Uruli passed in a jiffy only to slow down in Hadapsar and continued the same slowed down momentum till Pune station.Arrived Pune station with a delay of 15 minutes and was placed in platform 1 for de- boarding.

Translate to English
Translate to Hindi
Info Update
37198 views
11

Sep 18 2019 (10:24)   12221/Pune - Howrah AC Duronto Express | DD/Daund Junction (6 PFs)
psanga_sur^~
psanga_sur^~   5601 blog posts
Entry# 4431340            Tags  
#DaundBypass
CRS for Daund Bypass line has been completed. Line will be opened for freight traffic soon. Waiting for further updates on passenger traffic.
Translate to English
Translate to Hindi

2 Public Posts - Wed Sep 18, 2019

1 Public Posts - Fri Sep 20, 2019

8900 views
0

Sep 27 2019 (20:20)
Abhinandan Dhar   54 blog posts
Re# 4431340-5              
yes..platform work is still in progress and looks far from completed.
Translate to English
Translate to Hindi
Page#    42 Blog Entries  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy