Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jun 23, 2017 18:06:06 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jun 23, 2017 18:06:06 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by amar22nov~
Page#    5 Blog Entries  
  
Rail News
0 Followers
299 views
IR AffairsCR/Central  -  
May 29 2017 (19:29)   Tejas Express: Railways to provide Rs 30 headphones after 337 stolen

Electric Loco Shed Soon at BSP~   6 news posts
Entry# 2299025   News Entry# 303840         Tags   Past Edits
A total of 337 headphones distributed to passengers for the entertainment systems on-board the Mumbai-Goa Tejas Express were stolen in just four round trips after it debuted last Monday, a railway source said.
For its fifth trip on Saturday from CST, the Indian Railway Catering and Tourism Corporation (IRCTC) provided low-cost headphones.
The IRCTC spokesperson did not confirm the number of missing headphones, but said that it had bought 1,000 headphones, each costing Rs30
The
...
more...
Indian Railway had introduced the systems to provide a flight-like travel experience for passengers.
The train has 990 seats across 13 passenger coaches, including an executive coach that has more comfortable seats with neck and leg rests.
The system has preloaded games, movies and songs, besides FM channels. For the first four trips, headphones of a leading brand were handed over to passengers before the start of the journey.
However, after the first trip itself, the train came back with fewer headphones, damaged infotainment screens and waste strewn all over.
The cost of each headphone was around Rs200. The new ones will cost Rs30 each, a source said.
“Many passengers do not return the headphones before alighting and take those with them thinking that its cost was included in their ticket fare,”said an attendant on the train.
He said the on-board staff are now afraid that IRCTC might recover the cost of missing headphones from their salary.
Without catering services, a Tejas Express chair-car and executive-car ticket between Mumbai and Goa costs Rs 1,285 and Rs2,585, respectively.

  
2221 views
May 29 2017 (20:45)
amar22nov~   4 blog posts   170 correct pred (67% accurate)
Re# 2299025-1            Tags   Past Edits
WHY SPENDING THIS MUCH COST FOR C....PUBLIC . JUST RUN JANSADHARAN...THOSE WHO WANT TO TRAVEL WELL AND GOOD...IF NOT ..THEN TAKE FLIGHT...OR BY THEIR OWN VEHICLE. INDIAN PUBLIC IS bc.
  
Rail News
0 Followers
594 views
Other NewsECR/East Central  -  
May 05 2017 (10:57)   2020 तक किऊल-गया रेलखंड का दोहरीकरण होगा पूरा : मनोज सिन्हा

Anand Mohan Mishra~   89 news posts
Entry# 2265582   News Entry# 301652         Tags   Past Edits
केन्द्रीयसंचार राज्य मंत्री (स्वतंत्र प्रभार) और रेल राज्यमंत्री मनोज सिन्हा ने कहा कि किऊल-गया रेलखंड का दोहरीकरण मार्च 2020 तक पूरा कर लिया जाएगा, जबकि तिलैया-किऊल रेलखंड के विद्युतीकरण का काम 2018 तक पूरा कर लिया जाएगा। गुरुवार को नवादा रेलवे स्टेशन परिसर में आयोजित एक कार्यक्रम में राज्यमंत्री मनोज सिन्हा किऊल-गया रेलखंड के दोहरीकरण और विद्युतीकरण का शुभारंभ कर रहे थे। इस मौके पर केन्द्रीय लघु सूक्ष्म और मध्यम उद्यम राज्य मंत्री गिरिराज सिंह, जमुई सांसद चिराग पासवान, हिसुआ विधायक अनिल सिंह, वारिसलीगंज विधायक अरुणा देवी, भाजपा जिलाध्यक्ष शशिभूषण कुमार बबलू समेत अनेक अधिकारी मौजूद थे। उन्होंने कहा कि प्रधानमंत्री नरेंद्र मोदी 2015-16 के बजट में किऊल-गया रेलखंड के दोहरीकरण का निर्णय लिया। 2017-18 तक लखीसराय, करौटा, पतनेर, सिरारी, शेखपुरा, जबकि 2018-19 तक मानपुर-तिलैया तक दोहरीकरण कर लिया जाएगा। बाकी बचे स्टेशनों तक 2019-20 तक काम पूरा कर लिया जाएगा। रेल राज्यमंत्री ने कहा कि करीब 1200 करोड़ रुपए की...
more...
लागत की यह योजना है। इसके तहत किऊल-गया तक 129 किलोमीटर दोहरीकरण और तिलैया से किऊल तक 87 किलोमीटर विद्युतीकरण की योजना शामिल है। योजना के मुताबिक, 22 बड़े और 25 छोटे पुलों का निर्माण किया जाना है।
आजादीके बाद बिहार में सर्वाधिक आवंटन
रेलराज्यमंत्री ने कहा कि 1950 के बाद से बिहार को रेलमंत्री मिलते रहे हैं। विचार किया कि बिहार के लिए विशेष करने की जरूरत नहीं है, लेकिन जब आगे बढ़ा तो बिहार की स्थिति बाकी राज्यों जैसी ही मिली।
केन्दुआ में सोलर चरखा का वितरण
रेलराज्यमंत्री मनोज सिन्हा ने नगर के केन्दुआ में 35 महिलाओं के बीच सोलर चरखा का वितरण किया। उन्होंने कहा कि सोलर चरखा महिला सशक्तीकरण की दिशा में महत्वपूर्ण कड़ी है। यह रोजगार का सशक्त माध्यम बनेगा।
किऊल-गया रेलखंड एक नजर
{किऊल-गयादोहरीकरण- 129 किमी
{ तिलैया-किऊल विद्युतीकरण-87 किमी
{ कुल स्टेशन - 29 { जंक्शन- 3 (लखीसराय, तिलैया, मानपुर) {क्रासिंग स्टेशन- 9 { हाॅल्ट- 17 { ब्रिज- 32 बड़ा, 304 छोटा।
बरियारपुर में एक आैर प्लेटफार्म बनेगा : डीआरएम
मुंगेर| मुंगेरसांसद वीणा देवी एवं मालदा मंडल के डीआरएम मोहित सिन्हा ने प्रखंड क्षेत्र में पड़ने वाले रेलवे स्टेशनों एवं हाल्ट का निरीक्षण किया। निरीक्षण के क्रम में उन्होंने खड़िया पीपरा हाल्ट, घोरघट हाल्ट, कल्याणपुर तथा बरियारपुर स्टेशनों का निरीक्षण किया। सांसद अधिकारी ने इस दौरान स्थानीय ग्रामीणों यात्रियों से भी बात कर समस्याओं को जानने और उसके निदान करने की कोशिश की। डीआरएम ने कहा कि पेयजल शौचालय की व्यवस्था जल्द ही की जाएगी।
मोदी के पीएम बनने के बाद कई सौगात
2014के पहले विभिन्न रेल परियोजनाओं के लिए पांच वर्षों का औसत आवंटन 1100 करोड़ रुपए का था। नरेंद्र मोदी के प्रधानमंत्री बनने के बाद बिहार को कई सौगात दी गई है। बिहार में 48000 करोड़ रुपए की विभिन्न रेल परियोजनाएं चल रही है। इसमें सिर्फ 3696 करोड़ रुपए की योजनाएं 2017-18 की है। पहले की तुलना 226 प्रतिशत की बढ़ोतरी राशि आवंटन में दर्ज हुई है। बिहार में आजादी के बाद यह अबतक का सर्वाधिक आवंटन है। इसके पहले इसका तिहाई और चौथाई राशि भी शायद ही आवंटित होती थी। राज्यमंत्री ने कहा कि पिछले ढाई सालों में बिहार में अमान परिवर्तन का काम तेजी से हुआ है। बिहार की जनता को दो पुल सौंपा गया है। मुंगेर का पुल बनाना हो या फिर मोकामा का। पीएम की पहल के बाद पूरा हुआ है। तीसरा पुल मोकामा में निर्माण के बाद मुश्किलें आसान हो जाएंगी।

  
761 views
May 06 2017 (14:19)
amar22nov~   4 blog posts   170 correct pred (67% accurate)
Re# 2265582-1            Tags   Past Edits
Admin...........Kindly Update on MAP

1 posts are hidden.
  
Rail Budget
0 Followers
961 views
Jul 15 2016 (21:38)  
 

amar22nov~   4 blog posts   170 correct pred (67% accurate)
Entry# 1930980            Tags   Past Edits
*Following railway routes must be covered from or via Bhagalpur
1. BGP TO LKO/SPC/DDN/CDG/ASR/SVDK (Via MGR-BJU-SPP-GKP)
2. BGP TO JYG/RXL/NKE/SMI/MKI/DBG/MBI (Via MGR-BJU-SPJ)
3. BGP TO SHC/PRNA/FBG/JBN (Via MGR-MNE)
4. BGP TO PSGHT/JRBM/SCL/BHRB/AGTL/NHLN
5.
...
more...
BGP TO GAYA/GHD/SGRL/KTE/BPL/UJN/ADI/BHUJ/RJT/OKHA/PBR/SM NH
6. BGP TO BAKA/DGHR/JSME/ASN/PRR/TATA/ROU/SBP/TIG/VSKP/BZA/M S/RMM/NCJ/TVC/HAD/ERS/ALLP/MAJN/HYB/SC/PUNE/NGP/BS P/R/JDB/KRDL/PURI
7. BGP TO MUV/ALY/IDH/JP/FL/MKN/JU/JSM/BME/BKN
*Following routes must be implemented now
1. DNR-PNBE-MKA-BGS-SHC-PRNA-JBN (Morning from Both End 5:00 AM Daily Intercity Exp)
2. DNR-PPTA-HJP-BJU-SHC-PRNA-JBN (Evening from Both End 7:30 PM Daily Intercity Exp)
3. JSME-DGHR-BAKA-BGP-MGR-KGG-SHC-PRNA-JBN (Evening from Both End 6:00 PM Daily Intercity Exp)
4. RPH-DUMK-HSDA-BGP-MGR-SKJ-BJU-SPJ-SKI-JYG (Morning from Both End 5:00 AM Daily Intercity Exp)
5. JSME-DGHR-BAKA-BGP-MGR-SKJ-BJU-MFP-SGL-NKE (TRI WEEKLY FROM BOTH SIDE Intercity Exp)
6. JSME-DGHR-BAKA-BGP-MGR-SKJ-BJU-MFP-SGL-RXL (BI WEEKLY FROM BOTH SIDE Intercity Exp)
7. JSME-DGHR-BAKA-BGP-MGR-SKJ-BJU-DBG-SMI-RXL (BI WEEKLY FROM BOTH SIDE Intercity Exp)
*** Need attention towards BHAGALPUR and RANCHI originating/passing trains. Must run on time with proper priority and facilities.
*** Kindly do needful to connect both RANCHI and BHAGALPUR with whole INDIA.
*Following railway routes must be covered from or via RANCHI
1. RNC TO LKO/MB/DDN/CDG/ASR/SVDK (Via GAYA-MGS-BSB-SLN)
2. RNC TO JYG/RXL/NKE/SMI/MKI/DBG/MBI
3. RNC TO SHC/PRNA/FBG/JBN
4. RNC TO PSGHT/JRBM/SCL/BHRB/AGTL/NHLN
5. RNC TO GAYA/GHD/SGRL/KTE/BPL/UJN/ADI/BHUJ/RJT/OKHA/PBR/SM NH
6. RNC TO TATA/ROU/SBP/TIG/VSKP/BZA/MS/RMM/NCJ/TVC/HAD/ERS/A LLP/MAJN/HYB/SC/PUNE/NGP/BSP/R/JDB/KRDL/PURI
7. RNC TO MUV/ALY/IDH/JP/FL/MKN/JU/JSM/BME/BKN
*** NEED TO MINIMIZE THE LOCO CHANGE/REVERSAL TIME BY IMPLEMENTING Y SECTION BYPASS AT ALL CROSSING STATIONS.
  
Rail Budget
0 Followers
713 views
Jan 28 2016 (00:48)  
 

amar22nov~   4 blog posts   170 correct pred (67% accurate)
Entry# 1722912            Tags   Past Edits
Bhagalpur - Tatanagar/ Bhagalpur - Hatia (Ranchi)
Need Train on daily basis from Bhagalpur with 24-26 coach, 50% coach diverted to Hatia (ranchi) & rest 50% to tatanagar at asansol or purulia station.
route as below:
1. bhagalpur-banka-deoghar-jasidih-asansol-damodar-pu rulia-chandil-tatanagar
2.
...
more...
bhagalpur-banka-deoghar-jasidih-asansol-damodar-pu rulia-kotshila-muri-tatisilwai-ranchi-hatia
TRIP HAS ENDED.
Blog  Time-Table

  
1733 views
Jun 11 2015 (12:47)
Mahaparinirwan Express DSJ Gaya Monthly~   1309 blog posts   13799 correct pred (70% accurate)
Re# 1500931-1            Tags   Past Edits
Better option was to try in 18623/Rajendra Nagar - Hatia Express /train/615/1388/384
Gaya at: 1am night, reaches Ranchi @ 8:10 am. Journey Duration= 7 hours 15minutes (Avg Speed: 43 km/hr).
Status (as of Today) GNWL# 92 / WL# 57 in 3AC class.
And it might have less on Jun 05 (7:45PM)
Page#    5 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Jul 3
Trains with ARP 15 Dep on: Sat Jul 8
Trains with ARP 30 Dep on: Sun Jul 23
Trains with ARP 120 Dep on: Sat Oct 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.