Respected Sir, Very Good morning, two new trains 14010 & 14020 Patalkot exp & kahanvally Exp from Delhi Sarai Rohilla to Chhindwara are to be started from 5th and 8th Sep.2011 respectively. There is a discrepancy in time table from Betul to Amla. It is a 23 km starch but time shown is 1hr and 27minutes (dep. from Betul 04.33 arr. at Amla is 06.00) it should be corrected to 05.00 and the rest of the time table is corrected accordingly upto Chhindwara.