Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Feb 24, 2017 22:59:00 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Feb 24, 2017 22:59:00 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by cvramana64
Page#    16 Blog Entries  next>>
  
General Travel
0 Followers
1458 views
Nov 23 2013 (14:24)   07407/Tirupati - Adilabad SpecialFare Sabarimala Special
 

cvramana64   22 blog posts   3 correct pred (33% accurate)
Entry# 914721            Tags   Past Edits
07407 new train can be runned via DMM, ATP so that one train is essential. Also make this runs on week ends. There is no express train on week ends in ths route.
  
Social
0 Followers
1065 views
Sep 20 2013 (09:04)  
 

cvramana64   22 blog posts   3 correct pred (33% accurate)
Entry# 856103            Tags   Past Edits
there is no train during nights from anantapur to thirupathi on week ends. public is dependent only on passenger on saturday and sunday. why so. that too the passenger has only two sleeper. coaches.

2 posts - Fri Sep 20, 2013

2 posts - Sat Sep 21, 2013

  
597 views
Sep 21 2013 (22:57)
cvramana64   22 blog posts   3 correct pred (33% accurate)
Re# 856103-5            Tags   Past Edits
good observation. It has only two sleeper coaches. Always full. Do You Know.

  
757 views
Sep 21 2013 (23:05)
RDR   87 blog posts   320 correct pred (68% accurate)
Re# 856103-6            Tags   Past Edits
Sir, Pl go through my blog entry No 828720 posted on 15-08-2013 on this subject and express your feelings.
One thing is clear that we the members/Admins discuss and exchange feelings but No Official from Railways ever bothered to look in to the suggesitons made in this forum.

  
643 views
Sep 21 2013 (23:10)
Boxer Bhai~   38154 blog posts   12668 correct pred (61% accurate)
Re# 856103-7            Tags   Past Edits
no i dont know
gtl-tpty is just like bza-tpty
no proper dedicated overnight train but bza route having passing trains overnight to tpty but , gtl-tpty hardly any!

1 posts are hidden.

  
665 views
Sep 21 2013 (23:14)
Chart Prepared*~   6851 blog posts   167 correct pred (66% accurate)
Re# 856103-9            Tags   Past Edits
plz taag anantapur station for dis blog entry so dat members can easily accessible further

  
687 views
Sep 21 2013 (23:31)
cvramana64   22 blog posts   3 correct pred (33% accurate)
Re# 856103-10            Tags   Past Edits
there are 928 members registered in this region thru this site. All of them should take initiation for proper action from railway board.
  
Site-Related
0 Followers
1398 views
Sep 20 2013 (09:08)  
 

cvramana64   22 blog posts   3 correct pred (33% accurate)
Entry# 856107            Tags   Past Edits
the blog posts/comments should reach railway board and ministry. pl take initiation to enlighten the minds of board and ministry. let them know what the public is really want. all these blog posts should reach railway board for necessary action.

1 posts - Fri Sep 20, 2013

  
609 views
Sep 20 2013 (11:30)
restore pallavan back to TPJ   207 blog posts   108 correct pred (70% accurate)
Re# 856107-2            Tags   Past Edits
please post your omments in pg portal

1 posts are hidden.

  
681 views
Sep 20 2013 (19:11)
Love the weather of Bangalore*^~   5847 blog posts   16805 correct pred (68% accurate)
Re# 856107-4            Tags   Past Edits

  
749 views
Sep 21 2013 (22:59)
cvramana64   22 blog posts   3 correct pred (33% accurate)
Re# 856107-5            Tags   Past Edits
many posts are made. it has no response. Why not the blog posts are brought to the notice of railway board/ministry. What matters.

  
739 views
Sep 21 2013 (23:03)
SGNR HS Inaugural 27 Feb^~   78738 blog posts   5089 correct pred (78% accurate)
Re# 856107-6            Tags   Past Edits
there is option of writing complaint through pgportal . that way , complaint reaches directly to zonal office.

  
756 views
Sep 21 2013 (23:07)
PKV*^~   19082 blog posts   72 correct pred (79% accurate)
Re# 856107-7            Tags   Past Edits
Sir , IR will not take cognizance of any complaint unless it is made through the proper channel , meaning their own machinery for receiving complaints .
  
Info Update
0 Followers
385 views
Sep 20 2013 (08:44)  
 

cvramana64   22 blog posts   3 correct pred (33% accurate)
Entry# 856094            Tags   Past Edits
In NTES no doubt data about train status is being given. But somewhere/data centre it is getting late. It always shows UPDATE WAITING. Train might have left the station even the status is not updated in NTES. What is this. Attach screen shot of todays train. Also chk system date/time. Train has already left anantapur. Bit status differently. Actual Dep was 8.38am.
  
Travel Question
0 Followers
829 views
Aug 30 2013 (10:25)  
 

cvramana64   22 blog posts   3 correct pred (33% accurate)
Entry# 839112            Tags   Past Edits
22879/22880 tpty to bbs is being introduced shortly. again this train routed thru gudur vijayawada. why cant this train routed thru pakala dmm, atp. so that an additional train will be availe for the people in this track. gods sake support this.

  
640 views
Aug 30 2013 (10:26)
Boxer Bhai~   38154 blog posts   12668 correct pred (61% accurate)
Re# 839112-1            Tags   Past Edits
it was vskp-tpty via bza /gdr got snacthed by ecor in last minute

  
618 views
Aug 30 2013 (10:42)
Begins Falls Rises ™   21448 blog posts   1207 correct pred (63% accurate)
Re# 839112-2            Tags   Past Edits
That's very long route.
Better to ask for another train from ATP section. a direct train from there.

  
653 views
Aug 30 2013 (17:14)
RDR   87 blog posts   320 correct pred (68% accurate)
Re# 839112-3            Tags   Past Edits
Good and alternate route needs to be considered by Railways as there are many trains are running via RU-GDR-BZA and will provide additional train service to cater the needs of this region. Trains are badly needed in this route TPTY-DMM-GY-GNT-BZA as the Prashanti Express is overcrowded always.
No matter little more distance as there are numerous trains that take longer route.
One thing is sure that Railway authorities are blind folded while introducing new trains and keep on increasing the train services only to burden already over loaded sections like this (RU-GDR-BZA)
Almost
...
more...
all the new trains proposed/introduced in July 2013 TT are taking the BZA-GDR route only
TRIP HAS ENDED.
Blog  Time-Table

  
1467 views
Jun 24 2013 (19:20)
RDR   87 blog posts   320 correct pred (68% accurate)
Re# 790970-1            Tags   Past Edits
HAPPY JOURNEY
  
General Travel
0 Followers
695 views
Jun 17 2013 (18:34)  
 

cvramana64   22 blog posts   3 correct pred (33% accurate)
Entry# 785722            Tags   Past Edits
Can any body tell me why trainenquiry.com / CRIS is not up to the mark performance. Many of the times. it is not updated. It is not updated even if the train crossed the station also. Can the railways rectify anytime.

  
647 views
Jun 17 2013 (18:52)
SANDY SUDHA OIL CAMMAN PEEPULL BHOOKMARI 2   881 blog posts   8 correct pred (88% accurate)
Re# 785722-1            Tags   Past Edits
Privatise CRIS and train enquiry,only then te things will work.
  
General Travel
0 Followers
431 views
Jun 17 2013 (18:47)  
 

cvramana64   22 blog posts   3 correct pred (33% accurate)
Entry# 785734            Tags   Past Edits
19576 / 19575 vivek exp - tuticorin to okha - This train can be routed thru pakala DMM. So that tranffic congestion when it comes via Krishnarajapuram YNK gets reduced and more over to cater public in this new route.
  
General Travel
0 Followers
590 views
Jun 15 2013 (08:21)  
 

cvramana64   22 blog posts   3 correct pred (33% accurate)
Entry# 783663            Tags   Past Edits
Train Enquiry.com - maintained by CRIS is not giving up to date information at the required time. Sometimes its taking hours to put status into track. Where is the real problem.

  
494 views
Jun 16 2013 (13:36)
SGNR HS Inaugural 27 Feb^~   78738 blog posts   5089 correct pred (78% accurate)
Re# 783663-1            Tags   Past Edits
software is not good ...
  
General Travel
0 Followers
1324 views
Jun 15 2013 (16:24)  
 

RDR   87 blog posts   320 correct pred (68% accurate)
Entry# 784115            Tags   Past Edits
I suggest SCR authorities at Secunderabad to consider diverting 17230/17229 SC-TVC-SC Sabri Express Via KCG-KRNT-DHNE-GY-DMM-PAK and continue through KPD-JTJ-SA -CBE-PGT-SRR-ERN-KTYM-QLN for 3 days and remaining 4 days with existing route as such a diversion will cover the newly laid DMM-PAK route and provide public additional train service to Sabrimala Devoties as well as Kerala bound passergers.
The proposed New Time Table to be implemented from 01-07-2013 has almost ignored while routing the proposed new trains - most of the trains that are proposed to be started either from Bangalore /Chennai to North and Eastern part of India like Kamakhya/Patliputra/Hatia Exp from YPR all are taking JTJ-KPD-MAS/TPTY -GDR- BZA and from Chennai to North like Bikaner Exp is also taking the same
...
more...
route and Nagrsol Exp is taking regular AJJ-RU-HX-GY instead could have taken AJJ-RU-TPTY-PAK-DMM-GY. Even KCG-MAQ Exp is also taking the old route via GY-HX-RU-KPD-JTJ-CBE instead could have taken GY-DMM-PAK-KPD-JTJ-SA-CBE again VSKP-kollam Exp is also taking BZA-GDR-RU-KPC-JTJ-SA-CBE instead could have taken BZA-GNT-DHNE-GY-DMM-PAK-KPD-JTJ-CBE route. This clearly show the way the SWR /SCR/SR neglecting the shorter route of TPTY-PAK-DMM-GY and going on increasing the trains in already over burdened routes and ignoring the new routes and needs of the people of this Region.

15 posts are hidden.

  
868 views
Jun 15 2013 (17:40)
cvramana64   22 blog posts   3 correct pred (33% accurate)
Re# 784115-16            Tags   Past Edits
I DO AGREE. RAILWAY BOARD MUST THINK AND ACT

5 posts are hidden.
Page#    16 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Mar 6
Trains with ARP 15 Dep on: Sat Mar 11
Trains with ARP 30 Dep on: Sun Mar 26
Trains with ARP 120 Dep on: Sat Jun 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Yesterday (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site