Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri May 26, 2017 07:40:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri May 26, 2017 07:40:26 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Pranav Sasidharan Achary
Page#    305 Blog Entries  next>>
  
Poll
0 Followers
1728 views
40 votes
May 10 2017 (14:51)   22691/KSR Bengaluru City - Delhi Hazrat Nizamuddin Rajdhani Express

Iri rules are different in different cases^~   81830 blog posts   5226 correct pred (78% accurate)
Entry# 2271019            Tags   Past Edits
How much Speedup of Bangalore Rajdhani you expect after End to End ELoco in June
Upto 30 mins18%7
30 mins - 1 hour23%9
1 hour - 2 hour20%8
More than 2 hour5%2
I don't expect any Speedup.35%14

  
455 views
May 16 2017 (22:33)
Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Re# 2271019-1            Tags   Past Edits
Max 10 to 15 minutes. Not more than that.

  
675 views
May 16 2017 (23:27)
Iri rules are different in different cases^~   81830 blog posts   5226 correct pred (78% accurate)
Re# 2271019-2            Tags   Past Edits
1 hour slack can be easily reduced. No doubts on it.
More 1 hour Speedup can be done if SWR is as desirous for Sbc Rajdhani as WR is for BCT Rajdhani ( though I myself hugely doubtful over it but Iam hoping to be pleasantly surprised by SWR )

5 posts are hidden.
  
General Travel
0 Followers
467 views
May 15 2017 (08:06)   16312/Kochuveli - Bikaner Express (PT)

Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Entry# 2277591            Tags   Past Edits
A unique train.
Operated by SR TVC division. Runs with LHB rakes belonging to NR but the coaches are based at TVC and KCVL. Pantry car is operated by NR and on board housekeeping is provided by SR MAS division.
  
General Travel
0 Followers
239 views
Apr 29 2017 (12:20)   ROHA/Roha (3 PFs)

Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Entry# 2255556            Tags   Past Edits
Is Roha Panvel section completely electrified
  
Info Update
0 Followers
3217 views
Jun 10 2014 (18:57)   12623/Chennai Central - Thiruvananthapuram Central Mail (PT)
 

Kerala Needs Own WCoR Zone   227 blog posts   17 correct pred (81% accurate)
Entry# 1130525            Tags   Past Edits
The 12623/4 Mail will be routed through Coimbatore from July 1 says SR press release. And that is the end of the legendary ED-PGT nonstop run... The running time of the train will increase and also the number of berths for Kerala passengers will reduce... Only because the ego of some people was to be massaged.

34 posts - Tue Jun 10, 2014

35 posts are hidden.

  
1906 views
Jun 10 2014 (20:00)
Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Re# 1130525-37            Tags   Past Edits
Yes even i agree on the same........trains to TVC from MAQ like Ernad, Parasuram being extended to NCJ......old coaches from MDU division breaking into half at KCVL yard, who cares even if a state like Kerala does exist at the southern tip of India...

1 posts are hidden.

  
1572 views
Jun 10 2014 (20:01)
Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Re# 1130525-39            Tags   Past Edits
TEN BSP ran from TVC earlier as an Express train.......i remember seeing it many times...and it ran via KTYM section when it was an express

  
1728 views
Jun 10 2014 (20:04)
Hyderabad Karnataka needs a dedicated train to SBC*^~   9687 blog posts   497 correct pred (74% accurate)
Re# 1130525-40            Tags   Past Edits
Sir even lots of TN trains got extended to KL but KL did not loose much in extension . Extension of Ernad and Parashuram is an utter wate , Nobody boards that train in that wee hours plus GNWL to TVC is not affected but see ERS-SBC ICE, CBE lost GNWL

  
1754 views
Jun 10 2014 (20:04)
Science is better than Engineering and Technology*^~   13740 blog posts   2 correct pred (100% accurate)
Re# 1130525-41            Tags   Past Edits
Ernad and parasuram caters very meager amount in TN. ok. who cared for tamil nadu ? dont say chennai. there are many parts in tamil nadu which doesnt got proper trains

  
1716 views
Jun 10 2014 (20:06)
Hyderabad Karnataka needs a dedicated train to SBC*^~   9687 blog posts   497 correct pred (74% accurate)
Re# 1130525-42            Tags   Past Edits
Extension of TN trains like Raptisagars , ALLP-BKSC, has impacted MAS very much , North bound people are struggling to get tickets. MAS is in RLWL for these trains.

2 posts are hidden.
  
★  Rail News
0 Followers
12292 views
Other NewsSR/Southern  -  IR Press Release 
Jun 10 2014 (18:58)   DIVERSION OF TRAINS VIA COIMBATORE & PROVISION OF STOPPAGE AT COIMBATORE
 

Kerala Needs Own WCoR Zone   7 news posts
Entry# 1130530   News Entry# 179662         Tags   Past Edits
With effect from 01.07.2014, the following trains will be diverted to run via Coimbatore and will be provided stoppage at Coimbatore.
Train No.12623/12624 Chennai Central – Thiruvananthapuram – Chennai Central Mail leaving originating station from 01.07.2014 will run via. Coimbatore and will be provided stoppage at Coimbatore.
Train No.16527/16528 Yesvantpur – Kannur – Yesvantpur express leaving originating station from 01.07.2014 will run via. Coimbatore and will be provided stoppage at Coimbatore.
...
more...
The stoppage at Podanur for this train will be withdrawn with effect from 10.08.2014. Train No.16527 Yesvantpur – Kannur express leaving Yesvantpur o­n and from 09.08.2014 and Train No.16528 Kannur – Yesvantpur express leaving Kannur o­n and from 09.08.2014 will not stop at Podanur.

4 posts are hidden.

  
1852 views
Jun 10 2014 (19:29)
Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Re# 1130530-5            Tags   Past Edits
Again.....after Alappuzha express now this train also going down the drain.....

183 posts are hidden.
  
General Travel
0 Followers
1848 views
Apr 30 2014 (22:57)  
 

Saravana Yuvaraj Train Journey Lover   3108 blog posts   5581 correct pred (64% accurate)
Entry# 1078764            Tags   Past Edits
My Opinion for IR:
1. Rajdhani should be Upgraded as it should be same as LHB AC
2. Premium train route should connect 2 State's capital, with few stoppages.
3. Duronto should have connection only with Country Capital to State onle.
4.
...
more...
LHB Exp is for every train after higher production.
5. GR is for any connection.
6. ICE is for distance of 500 less Km, either State Capital to other State's capital or even to interior part of a State.
For eg MAS CBE & even a new day train from CBE to TVC.
7. Shatabdi should not be given Stoppage.
8. Yuva should be cancelled.
Any other suggestion

11 posts are hidden.

  
1097 views
May 01 2014 (11:16)
Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Re# 1078764-12            Tags   Past Edits
All these suggestions look good on paper.....except LHB coach induction all others are practically impossible

1 posts are hidden.
  
Predictions: 32
confirm: 32
rac: 0
wl: 0
Journey: Sat Apr 26, 2014 @ 05:27
Class: Sleeper - SL
Travel: BRC/Vadodara Junction   to   KYJ/Kayamkulam Junction   |   1753 km / 2432 km
19578/Jamnagar - Tirunelveli Express
Entry# 1005717
 

PNR: 832-xxxxxxx   |   Similar PNRs
Posted Status as of: Feb 24 2014 (15:49)
Passenger 1: RAC 19 (Booking Status: RAC 19,GNWL)
Passenger 2: RAC 20 (Booking Status: RAC 20,GNWL)
Passenger 3: RAC 21 (Booking Status: RAC 21,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 25 2014 (19:07)
Passenger 1: S3,57 (Booking Status: RAC 19,GNWL)
Passenger 2: S3,58 (Booking Status: RAC 20,GNWL)
Passenger 3: S3,59 (Booking Status: RAC 21,GNWL)
Chart PREPARED

  
1487 views
Apr 18 2014 (19:38)
Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Re# 1005717-1            Tags   Past Edits
Thanks to all the members for their predictions...
  
Predictions: 28
confirm: 0
rac: 0
wl: 28
Journey: Sun Apr 06, 2014 @ 17:25
Class: Sleeper - SL
Travel: YA/Yerraguntla Junction   to   TNA/Thane   |   943 km / 1278 km
11042/Chennai Central - Mumbai CST Express (PT)
Entry# 1047283
 

Posted by: S SADAK HUSSAIN   1 blog posts
PNR: 446-xxxxxxx   |   Similar PNRs
Posted Status as of: Apr 05 2014 (18:02)
Passenger 1: Waitlist# 23 (Booking Status: W/L 30,CK)
Passenger 2: Waitlist# 24 (Booking Status: W/L 31,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 06 2014 (16:30)
Passenger 1: S10,52 (Booking Status: W/L 30,CK)
Passenger 2: S10,60 (Booking Status: W/L 31,CK)
Chart PREPARED

  
1504 views
Apr 06 2014 (12:50)
Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Re# 1047283-1            Tags   Past Edits
Whitewash......:(

  
1356 views
Apr 06 2014 (14:00)
tusherk~   244 blog posts   4091 correct pred (68% accurate)
Re# 1047283-2            Tags   Past Edits
IR ka new rule is train ke liye nehi hai?
  
Predictions: 43
confirm: 43
rac: 0
wl: 0
Journey: Mon Feb 24, 2014 @ 21:25
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 24   |   Charting: < 17:30
Travel: BCT/Mumbai Central   to   LDH/Ludhiana Junction   |   1757 km / 1893 km
12903/Golden Temple Mail (PT)
Entry# 1004595
 

Posted by: MASOOD ALAM   2 blog posts   61 correct pred (64% accurate)
PNR: 812-xxxxxxx   |   Similar PNRs
Posted Status as of: Feb 23 2014 (11:48)
Passenger 1: Waitlist# 1 (Booking Status: W/L 1,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Feb 25 2014 (22:37)
Passenger 1: Can/Mod (Booking Status: W/L 1,CK)
Chart PREPARED

  
2090 views
Feb 24 2014 (18:01)
Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Re# 1004595-1            Tags   Past Edits
Bad luck.....:(.....

2 posts are hidden.
  
General Travel
0 Followers
1695 views
Jan 04 2014 (22:05)   10103/Mandovi Express
 

Amit Pal~   917 blog posts
Entry# 955265            Tags   Past Edits
in konkan railway what is the starting point and end point of ro-ro service??

2 posts are hidden.

  
1422 views
Jan 05 2014 (14:41)
Pranav Sasidharan Achary   457 blog posts   2538 correct pred (62% accurate)
Re# 955265-3            Tags   Past Edits
Kolad to Surathkal

1 posts are hidden.
Page#    305 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Jun 5
Trains with ARP 15 Dep on: Sat Jun 10
Trains with ARP 30 Dep on: Sun Jun 25
Trains with ARP 120 Dep on: Sat Sep 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site