Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 21, 2017 18:08:16 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 21, 2017 18:08:16 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by bchandrasekhar23
Page#    5 Blog Entries  
  
★  General Travel
0 Followers
661 views
Feb 26 2015 (14:32)  
 

bchandrasekhar23   3 blog posts   5 correct pred (100% accurate)
Entry# 1380393            Tags   Past Edits
worst railway budget since independence.

  
595 views
Feb 26 2015 (14:35)
Magadh Express NDLS IPR~   5677 blog posts   639 correct pred (71% accurate)
Re# 1380393-1            Tags   Past Edits
ye achchha post hai :P

  
493 views
Feb 26 2015 (15:08)
warriorsultan   1206 blog posts   48 correct pred (81% accurate)
Re# 1380393-2            Tags   Past Edits
Its a slap on all those faces who think that railway budget is all about introduction, extension and increasing frequencies of trains and nothing else. Such people have little economic sense. Someone was saying if not 100 give atleast 30 trains by giving 1-1 trains to each state . Common sense is evidently missing in that statement coz you can still introduce 15 trains and give 1-1 train to each state. My point is all here are obsessed by new trains and new routes and dont look beyond that.
  
Predictions: 14
confirm: 12
rac: 0
wl: 2
Journey: Sat Apr 28, 2012 @ 23:05
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 391
Travel: LTT/Lokmanya Tilak Terminus   to   SC/Secunderabad Junction   |   770 km / 770 km
12219/Mumbai LTT - Secunderabad AC Duronto Express
Entry# 410430
 

Posted by: bchandrasekhar23   3 blog posts   5 correct pred (100% accurate)
PNR: 870-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Apr 28 2012 (15:27)
Passenger 1: Waitlist# 13 (Booking Status: W/L 32,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 29 2012 (01:51)
Passenger 1: B7,6 (Booking Status: W/L 32,CK)
Chart PREPARED
  
Predictions: 12
confirm: 8
rac: 0
wl: 4
Journey: Wed Apr 25, 2012 @ 23:05
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 391
Travel: LTT/Lokmanya Tilak Terminus   to   SC/Secunderabad Junction   |   770 km / 770 km
12219/Mumbai LTT - Secunderabad AC Duronto Express
Entry# 407140
 

Posted by: bchandrasekhar23   3 blog posts   5 correct pred (100% accurate)
PNR: 842-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Apr 25 2012 (14:29)
Passenger 1: Waitlist# 19 (Booking Status: W/L 28,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 25 2012 (20:03)
Passenger 1: B1,31 (Booking Status: W/L 28,CK)
Chart PREPARED
  
Predictions: 10
confirm: 8
rac: 0
wl: 2

[overstamped]
Journey: Tue Mar 13, 2012 @ 06:25
Class: AC 1st Class - 1A   |   Charting: < 20:15
Travel: BCT/Mumbai Central   to   ST/Surat   |   263 km / 493 km
12009/Mumbai Central - Ahmedabad Shatabdi Express
Entry# 371043
 

Posted by: bchandrasekhar23   3 blog posts   5 correct pred (100% accurate)
PNR: 820-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 12 2012 (16:28)
Passenger 1: Waitlist# 5 (Booking Status: W/L 5,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 15 2012 (01:09)
Passenger 1: Can/Mod (Booking Status: W/L 5,CK)
Chart PREPARED

  
1169 views
Mar 12 2012 (17:21)
bchandrasekhar23   3 blog posts   5 correct pred (100% accurate)
Re# 371043-1            Tags   Past Edits
Train Starts at 6.25 AM At what time They prepare chart.

  
1130 views
Mar 12 2012 (17:36)
Vijay Kumar Kourani~   11 blog posts   4245 correct pred (89% accurate)
Re# 371043-2            Tags   Past Edits
chart will be prepared tonight by 10pm

  
957 views
Mar 13 2012 (18:51)
DB*^~   33537 blog posts   224048 correct pred (71% accurate)
Re# 371043-3            Tags   Past Edits
Stamp changed!!
  
0 Followers
420 views
Mar 12 2012 (17:33)  
 

bchandrasekhar23   3 blog posts   5 correct pred (100% accurate)
Entry# 371114            Tags   Past Edits
Train Starts at starting point AT 6.25 am Tomorrow.when final chart will be done.

  
377 views
Mar 12 2012 (17:34)
Guest: 18c2ca8d   show all posts
Re# 371114-1            Tags   Past Edits
Today between 9-11 Pm.

  
384 views
Mar 12 2012 (17:34)
Chetan Malviya   443 blog posts   86 correct pred (66% accurate)
Re# 371114-2            Tags   Past Edits
8.00pm tonight
Page#    5 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 3
Trains with ARP 15 Dep on: Wed Mar 8
Trains with ARP 30 Dep on: Thu Mar 23
Trains with ARP 120 Dep on: Wed Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site