Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 21, 2017 08:54:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 21, 2017 08:54:42 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Dipesh Tripathi
Page#    12 Blog Entries  next>>
  
Predictions: 23
confirm: 23
rac: 0
wl: 0
Journey: Tue Jun 02, 2015 @ 23:10
Class: Sleeper - SL   |   Tot Seats: Avbl 24
Travel: STA/Satna Junction   to   LTT/Lokmanya Tilak Terminus   |   1165 km / 1912 km
12335/Bhagalpur - Mumbai LTT SF Express
Entry# 1415771

Posted by: Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
PNR: 613-xxxxxxx    |   Similar PNRs
Posted Status as of: Apr 02 2015 (18:42)
Passenger 1: RAC 4 (Booking Status: W/L 2,RLGN)
Passenger 2: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 3: Waitlist# 2 (Booking Status: W/L 4,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 04 2015 (13:12)
Passenger 1: Can/Mod (Booking Status: W/L 2,RLGN)
Passenger 2: Can/Mod (Booking Status: W/L 3,RLGN)
Passenger 3: Can/Mod (Booking Status: W/L 4,RLGN)
Chart PREPARED

  
1644 views
Apr 02 2015 (19:09)
DJ™^~   15435 blog posts   185350 correct pred (76% accurate)
Re# 1415771-1            Tags   Past Edits
#racallocation is 4 in SL from STA-LTT
Latest Status as of: Today (6:55PM)  Refresh Status
Passenger 1: RAC 4 (Booking Status: W/L 2,RLGN)
Passenger 2: Waitlist# 1 (Booking Status: W/L 3,RLGN)
Passenger 3: Waitlist# 2 (Booking Status: W/L 4,RLGN)
Chart
...
more...
NOT Prepared
  
Rail News
0 Followers
1093 views
New/Special Trains
Mar 09 2015 (17:23)   SPECIAL TRAINS 2015 :: Bandra - Allhabad
 

Jubs   1220 news posts
Entry# 1391589   News Entry# 215885         Tags   Past Edits
Western Railway announced Weekly Special trains between Bandra Terminals - Allahabad. 26 services for the Trains. Following are the details.

  
3077 views
Mar 09 2015 (19:39)
Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
Re# 1391589-1            Tags   Past Edits
There is no clear information whether the tickets of all journey dates will open on 10th or just some. Any idea?

  
2447 views
Mar 09 2015 (23:33)
S Verma*^~   5978 blog posts   119116 correct pred (89% accurate)
Re# 1391589-2            Tags   Past Edits
All journey Dates (60dayARP) Open in 10th March.
  
Travel Question
0 Followers
984 views
Jun 02 2014 (12:06)  
 

Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
Entry# 1120220            Tags   Past Edits
Under what circumstances are extra coaches attached in a train?
Say in Duronto when are the extra coaches attached?

  
837 views
Jun 02 2014 (12:25)
NM   93 blog posts   2796 correct pred (70% accurate)
Re# 1120220-1            Tags   Past Edits
Extra coaches are added to handle the seasonal rush in a few trains.
Rarely they are also added while transporting coaches.

  
741 views
Jun 02 2014 (12:45)
Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
Re# 1120220-2            Tags   Past Edits
Are any extra coaches added in #LTT-ALD Duronto ?
  
Travel Question
0 Followers
1624 views
Jun 02 2014 (11:55)   12727/Godavari SF Express
 

swagatkb   15 blog posts
Entry# 1120200            Tags   Past Edits
Traveling on 3rd june , just booked a tatkal ticket to sc with waiting list WL20 and WL21. will it get confirmed or should i cancel my ticket
Incase i cancel now will i get my refund

6 posts are hidden.

  
1354 views
Jun 02 2014 (12:07)
Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
Re# 1120200-7            Tags   Past Edits
Yes you will get your refund as long as its in waiting.

1 posts are hidden.
  
Predictions: 27
confirm: 1
rac: 26
wl: 0
Journey: Mon Jun 02, 2014 @ 17:25
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 286
Travel: LTT/Lokmanya Tilak Terminus   to   ALD/Allahabad Junction   |   1343 km / 1343 km
12293/Mumbai LTT - Allahabad AC Duronto Express
Entry# 1104703

Posted by: Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
PNR: 844-xxxxxxx    |   Similar PNRs
Posted Status as of: May 21 2014 (05:26)
Passenger 1: Waitlist# 68 (Booking Status: W/L 105,GNWL)
Passenger 2: Waitlist# 69 (Booking Status: W/L 106,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 02 2014 (14:00)
Passenger 1: RB8 47/Coach Position:2 (Booking Status: W/L 105,GNWL)
Passenger 2: RB8 47/Coach Position:2 (Booking Status: W/L 106,GNWL)
Chart PREPARED

  
1246 views
Jun 01 2014 (23:55)
S Verma*^~   5978 blog posts   119116 correct pred (89% accurate)
Re# 1104703-2            Tags   Past Edits
#Racallocation 48 in 3AC
  
Predictions: 14
confirm: 0
rac: 0
wl: 14
Journey: Tue May 20, 2014 @ 22:15
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 82   |   Charting: < 18:15
Travel: LTT/Lokmanya Tilak Terminus   to   STA/Satna Junction   |   1165 km / 1693 km
13202/Mumbai LTT - Rajendra Nagar Patna Janta Express
Entry# 1102954
 

Posted by: Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
PNR: 862-xxxxxxx    |   Similar PNRs
Posted Status as of: May 19 2014 (16:53)
Passenger 1: Confirmed (Booking Status: B1,3,CK)
Passenger 2: Confirmed (Booking Status: B1,4,CK)
Passenger 3: Waitlist# 7 (Booking Status: W/L 7,CK)
Passenger 4: Waitlist# 8 (Booking Status: W/L 8,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 20 2014 (21:33)
Passenger 1: B1,3/Coach Position:20 (Booking Status: B1,3,CK)
Passenger 2: B1,4/Coach Position:20 (Booking Status: B1,4,CK)
Passenger 3: Waitlist# 3 (Booking Status: W/L 7,CK)
Passenger 4: Waitlist# 4 (Booking Status: W/L 8,CK)
Chart PREPARED

  
1021 views
May 20 2014 (21:24)
DB*^~   33537 blog posts   224048 correct pred (71% accurate)
Re# 1102954-1            Tags   Past Edits
  
Predictions: 27
confirm: 0
rac: 5
wl: 22
Journey: Tue May 13, 2014 @ 00:35
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 100   |   Charting: < 20:30
Travel: LTT/Lokmanya Tilak Terminus   to   STA/Satna Junction   |   1165 km / 1492 km
12167/Mumbai LTT - Varanasi SF Express (PT)
Entry# 1062346
 

Posted by: Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
PNR: 832-xxxxxxx    |   Similar PNRs
Posted Status as of: Apr 18 2014 (14:01)
Passenger 1: Waitlist# 30 (Booking Status: W/L 68,GNWL)
Passenger 2: Waitlist# 31 (Booking Status: W/L 69,GNWL)
Passenger 3: Waitlist# 32 (Booking Status: W/L 70,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 13 2014 (21:40)
Passenger 1: RB1 63/Coach Position:8 (Booking Status: W/L 68,GNWL)
Passenger 2: RB1 63/Coach Position:8 (Booking Status: W/L 69,GNWL)
Passenger 3: Waitlist# 1 (Booking Status: W/L 70,GNWL)
Chart PREPARED

  
1271 views
May 09 2014 (02:48)
Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
Re# 1062346-1            Tags   Past Edits
What are the chances of it getting confirmed?
  
Predictions: 50
confirm: 36
rac: 8
wl: 6
Journey: Sat Nov 02, 2013 @ 02:10
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 16   |   Charting: < 20:15
Travel: JP/Jaipur Junction   to   HWH/Howrah Junction   |   1505 km / 1815 km
12308/Jodhpur - Howrah SF Express (PT)
Entry# 841490
 

Posted by: IR no more Safe^~   18803 blog posts   93874 correct pred (74% accurate)
PNR: 245-xxxxxxx    |   Similar PNRs
Posted Status as of: Sep 02 2013 (13:03)
Passenger 1: Waitlist# 28 (Booking Status: W/L 32,GNWL)
Passenger 2: Waitlist# 29 (Booking Status: W/L 33,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Nov 02 2013 (19:56)
Passenger 1: B1,27 (Booking Status: W/L 32,HO)
Passenger 2: B1,30 (Booking Status: W/L 33,HO)
Chart PREPARED

9 posts are hidden.

  
2075 views
Oct 31 2013 (22:36)
Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
Re# 841490-11            Tags   Past Edits
this will get confirmed....
extra coacches lag rahe hai so dont worry..

  
2060 views
Oct 31 2013 (22:40)
IR no more Safe^~   18803 blog posts   93874 correct pred (74% accurate)
Re# 841490-12            Tags   Past Edits
bt it has 24 coach... so chances of dat a very less i think... r u sure ?

  
1971 views
Nov 01 2013 (00:47)
Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
Re# 841490-13            Tags   Past Edits
positive...

  
1859 views
Nov 01 2013 (16:31)
IR no more Safe^~   18803 blog posts   93874 correct pred (74% accurate)
Re# 841490-14            Tags   Past Edits
Thanks. ... got HO...

  
1687 views
Nov 01 2013 (23:38)
Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
Re# 841490-15            Tags   Past Edits
congrats!
have a happy journey!
  
General Travel
0 Followers
2104 views
Nov 01 2013 (00:51)   12167/Mumbai LTT - Varanasi SF Express (PT)
 

Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
Entry# 893436            Tags   Past Edits
Can any 1 please inform how many extra coaches are there in the train running in festive season?
  
Predictions: 14
confirm: 9
rac: 4
wl: 1
Journey: Thu Nov 07, 2013 @ 00:35
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 100   |   Charting: < 20:30
Travel: LTT/Lokmanya Tilak Terminus   to   STA/Satna Junction   |   1165 km / 1492 km
12167/Mumbai LTT - Varanasi SF Express (PT)
Entry# 887300
 

Posted by: Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
PNR: 811-xxxxxxx    |   Similar PNRs
Posted Status as of: Oct 25 2013 (23:50)
Passenger 1: Waitlist# 21 (Booking Status: W/L 40,GNWL)
Passenger 2: Waitlist# 22 (Booking Status: W/L 41,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Is there any chance of it getting confirmed? If not are there any alternatives? Thanks.

Latest Status as of: Nov 07 2013 (18:04)
Passenger 1: Can/Mod (Booking Status: W/L 40,GNWL)
Passenger 2: Can/Mod (Booking Status: W/L 41,GNWL)
Chart PREPARED

  
1204 views
Oct 31 2013 (23:37)
Dipesh Tripathi   14 blog posts   195 correct pred (64% accurate)
Re# 887300-1            Tags   Past Edits
What are the chances of it getting confirmed?? If less are there any alternatives? Please suggest..
Page#    12 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 3
Trains with ARP 15 Dep on: Wed Mar 8
Trains with ARP 30 Dep on: Thu Mar 23
Trains with ARP 120 Dep on: Wed Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site