Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 21, 2017 02:02:52 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 21, 2017 02:02:52 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by patavinash
Page#    4 Blog Entries  
  
General Travel
0 Followers
3265 views
Sep 19 2015 (23:20)   12056/Dehradun - New Delhi Jan Shatabdi Express
 

patavinash   3 blog posts
Entry# 1594823            Tags   Past Edits
For Train 12056 from Dehradun to New Delhi
Would winter affect schedule in January 2016. I have connecting train from Delhi to Mumbai at 3 PM

5 posts - Sun Sep 20, 2015

  
968 views
Sep 20 2015 (00:29)
Jagdeesh Srivastava~   3721 blog posts   8922 correct pred (72% accurate)
Re# 1594823-6            Tags   Past Edits
Dehradun se mumbai k liye bekr train h...
Aap Haridwar se AC ya BDTS express prefer kar le...
.
Nahi toh break delhi se hi kyun... Lucknow ka bhi dekh sakte h....

  
766 views
Oct 15 2015 (12:54)
patavinash   3 blog posts
Re# 1594823-7            Tags   Past Edits
I have booked for Garib Rath, Want to be sure, that 12056 reaches Delhi on time

  
885 views
Oct 15 2015 (12:58)
arkgood~   2268 blog posts   3940 correct pred (73% accurate)
Re# 1594823-8            Tags   Past Edits
It would be risky because garibrath departs from nzm and ddn janshatabdi arrive at ndls...second it will be fog in north india at that time.....better make other plan.....

  
2083 views
Oct 22 2015 (18:43)
patavinash   3 blog posts
Re# 1594823-9            Tags   Past Edits
Thanks. How to travel between NZM and NDLS. How much time will it take

  
2034 views
Oct 22 2015 (23:13)
arkgood~   2268 blog posts   3940 correct pred (73% accurate)
Re# 1594823-10            Tags   Past Edits
As per experience...By local...it takes around 20 mins
By bus ...it takes 50 mins including traffic factor
Metro is not near nizamuddin station....u can book ur taxi...
  
Predictions: 42
confirm: 0
rac: 42
wl: 0
Journey: Thu Apr 02, 2015 @ 23:45
Class: Sleeper - SL   |   Tot Seats: Avbl 337
Travel: TNA/Thane   to   MAO/Madgaon Junction   |   548 km / 581 km
10111/Konkan Kanya Express (PT)
Entry# 1392921

Posted by: patavinash   3 blog posts
PNR: 873-xxxxxxx    |   Similar PNRs
Posted Status as of: Mar 11 2015 (01:20)
Passenger 1: Waitlist# 142 (Booking Status: W/L 208,GNWL)
Passenger 2: Waitlist# 143 (Booking Status: W/L 209,GNWL)
Passenger 3: Waitlist# 144 (Booking Status: W/L 210,GNWL)
Passenger 4: Waitlist# 145 (Booking Status: W/L 211,GNWL)
Passenger 5: Waitlist# 146 (Booking Status: W/L 212,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 03 2015 (15:52)
Passenger 1: Can/Mod (Booking Status: W/L 208,GNWL)
Passenger 2: Can/Mod (Booking Status: W/L 209,GNWL)
Passenger 3: Can/Mod (Booking Status: W/L 210,GNWL)
Passenger 4: Can/Mod (Booking Status: W/L 211,GNWL)
Passenger 5: RS11 63 (Booking Status: W/L 212,GNWL)
Chart PREPARED

  
1143 views
Apr 02 2015 (11:52)
DJ™^~   15432 blog posts   185349 correct pred (76% accurate)
Re# 1392921-1            Tags   Past Edits
#racallocation is 132 in SL from TNA-MAO
Latest Status as of: Today (9:11AM) Refresh Status
Passenger 1: RAC 131 (Booking Status: W/L 208,GNWL)
Passenger 2: RAC 132 (Booking Status: W/L 209,GNWL)
Passenger 3:
...
more...
Waitlist# 1 (Booking Status: W/L 210,GNWL)
Passenger 4: Waitlist# 2 (Booking Status: W/L 211,GNWL)
Passenger 5: Waitlist# 3 (Booking Status: W/L 212,GNWL)
Chart NOT Prepared
  
Predictions: 22
confirm: 22
rac: 0
wl: 0
Journey: Mon Mar 17, 2014 @ 15:06
Class: 2nd Sitting - 2S   |   Tot Seats: Avbl 710
Travel: THVM/Thivim   to   DR/Dadar Central   |   526 km / 572 km
12052/Madgaon - Dadar Jan Shatabdi Express
Entry# 967468
 

Posted by: patavinash   3 blog posts
PNR: 832-xxxxxxx    |   Similar PNRs
Posted Status as of: Jan 18 2014 (00:54)
Passenger 1: Waitlist# 79 (Booking Status: W/L 79,GNWL)
Passenger 2: Waitlist# 80 (Booking Status: W/L 80,GNWL)
Passenger 3: Waitlist# 81 (Booking Status: W/L 81,GNWL)
Passenger 4: Waitlist# 82 (Booking Status: W/L 82,GNWL)
Passenger 5: Waitlist# 83 (Booking Status: W/L 83,GNWL)
Passenger 6: Waitlist# 84 (Booking Status: W/L 84,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 17 2014 (14:22)
Passenger 1: DE2,60/Coach Position:5 (Booking Status: W/L 79,GNWL)
Passenger 2: DE2,65/Coach Position:5 (Booking Status: W/L 80,GNWL)
Passenger 3: DE2,66/Coach Position:5 (Booking Status: W/L 81,GNWL)
Passenger 4: Can/Mod (Booking Status: W/L 82,GNWL)
Passenger 5: Can/Mod (Booking Status: W/L 83,GNWL)
Passenger 6: Can/Mod (Booking Status: W/L 84,GNWL)
Chart PREPARED

  
1008 views
Mar 17 2014 (13:37)
rdb*^   30518 blog posts   359111 correct pred (79% accurate)
Re# 967468-1            Tags   Past Edits
  
Predictions: 45
confirm: 44
rac: 1
wl: 0
Journey: Mon Nov 25, 2013 @ 22:25
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 54
Travel: BHUJ/Bhuj   to   BDTS/Bandra Terminus   |   841 km / 841 km
19116/Sayaji Nagari Express
Entry# 891530
 

Posted by: patavinash   3 blog posts
PNR: 811-xxxxxxx    |   Similar PNRs
Posted Status as of: Oct 30 2013 (12:48)
Passenger 1: RAC 9 (Booking Status: RAC 12,GNWL)
Passenger 2: RAC 10 (Booking Status: W/L 1,GNWL)
Passenger 3: RAC 11 (Booking Status: W/L 2,GNWL)
Passenger 4: RAC 12 (Booking Status: W/L 3,GNWL)
Passenger 5: Waitlist# 1 (Booking Status: W/L 4,GNWL)
Passenger 6: Waitlist# 2 (Booking Status: W/L 5,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Nov 25 2013 (18:36)
Passenger 1: B2,17 (Booking Status: RAC 12,GNWL)
Passenger 2: B2,20 (Booking Status: W/L 1,GNWL)
Passenger 3: B2,18 (Booking Status: W/L 2,GNWL)
Passenger 4: B2,19 (Booking Status: W/L 3,GNWL)
Passenger 5: B2,21 (Booking Status: W/L 4,GNWL)
Passenger 6: B2,22 (Booking Status: W/L 5,GNWL)
Chart PREPARED

  
1787 views
Nov 04 2013 (10:58)
II Mangalyaan II The Mars Orbiter Mission II Sep 2   1327 blog posts   52730 correct pred (79% accurate)
Re# 891530-1            Tags   Past Edits
#racallocation end to end 12 in 3AC
Page#    4 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 3
Trains with ARP 15 Dep on: Wed Mar 8
Trains with ARP 30 Dep on: Thu Mar 23
Trains with ARP 120 Dep on: Wed Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site