Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Mar 24, 2017 21:58:38 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Mar 24, 2017 21:58:38 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by tarunsit
Page#    6 Blog Entries  
  
Rail News
0 Followers
1345 views
Commentary/Human InterestSWR/South Western  -  
May 04 2015 (08:19)   Delay in land acquisition holds up laying of rail line
 

rdb*^   127022 news posts
Entry# 1453611   News Entry# 223141         Tags   Past Edits
Only 48.26 acres of land has beenacquired by the Karnataka government
The work on constructing a new rail line between Rayadurga and Tumkur has been lagging owing to the delay on the part of the State government in completing the land acquisition process and handing over the land required for laying the track.
Petition filed
A writ petition was filed by 14 social and
...
more...
voluntary organisations as well as prominent individuals from Ballari and Hosapete.
The organisations, including Ballari District Railway Action Committee, D.R.K. Rangasiri, Ballari, District Chamber of Commerce and Industry and Hosapete Bar Association, sought a direction to the Railways to expedite the construction of the new railway line between Rayadurga and Tumkur.
They also demanded the introduction of additional train services. The petition came up for preliminary hearing recently.
‘No delay’
The Railways, while submitting its arguments before the Division Bench of the Karnataka High Court, has clarified that there has been no delay from its side.
The Railways, in its submission, pointed out that the land acquisition process had not been completed in Karnataka.
The Rayadurga and Tumkur line is a cost-sharing project on 50:50 basis between Karnataka, Andhra Pradesh and the Railways since December 9, 2010 and September 14, 2011 respectively.
The Railways has also said that it developed a number of infrastructure facilities for Ballari, including the doubling of track between Guntakal-Ballari-Hospet, connectivity to Chickjajur and plans for electrification of railway lines. This apart, the number of coaches of the Hampi Express was increased. There were also plans to introduce other trains from Hubballi/Bengaluru/Mysuru connecting Ballari to Howrah, Shirdi, Jodhpur and Ajmer among other places, the Railways said.
The bench was informed that Andhra Pradesh has completed acquisition of 433.38 acres, out of the total requirement of 981.23 acres and handed the land over to the Railways in October. The work was going on in Andhra Pradesh.
Acquisition submitted
In Karnataka, though the land acquisition application was submitted in March, 2010, so far only 48.26 acres of land has been acquired, out of the total requirement of 1,342.51 acres.
The work could not be started due to agitation by land owners for non-payment of compensation by Government of Karnataka, though the Railway had already deposited Rs. 44.41 crore with the Special Land Acquisition Officer.
Detailed estimate
The project was sanctioned during the year 2007-08. Subsequently a detailed estimate was sanctioned by competent authority on July 21, 2009.
After that the Railways applied for land acquisition to both the States — Andhra Pradesh and Karnataka — on October 21, 2009 and on March 18 2010 respectively.
‘Persuade government’
“The grievances of the petitioners are apparently met with, as can be deciphered from the Statements of Objections of the respondents. In view of the matter, there is no more to be decided, except for the railway authorities to persuade the Karnataka government to ensure acquisition of land for the purpose of laying the railway line,” the bench, consisting of Chief Justice D.H. Waghela and Justice Ram Mohan Reddy, noted, while disposing off the petition.
The total length of the project is 206.53 km
102.63 km falls within Karnataka
103.90 km falls within Andhra Pradesh

9 posts are hidden.

  
618 views
May 05 2015 (18:42)
tarunsit   6 blog posts
Re# 1453611-10            Tags   Past Edits
It will never happen under our cm rule as he is not at all interested
  
Rail News
0 Followers
894 views
New/Special TrainsSWR/South Western  -  IR Press Release 
Nov 04 2014 (20:40)   NEW TRAINS FOR KARNATAKA RAJYOTSAVA
 

rdb*^   127022 news posts
Entry# 1274051   News Entry# 200201         Tags   Past Edits
On the occasion of Karnataka Rajyotsava South Western Railway is planning to introduce the regular run of the following trains as announced in the Railway Budget.Accordingly, flagging off ceremonies are planned at various locations as detailed below:-

Train Nos.56925/56926 Bangalore City – Tumkur – Bangalore City (Daily) Fast Passenger, 76521/76522 Yesvantpur – Nelamangala –Yesvantpur DEMU Passenger and Train No.76523/76524 Yesvantpur – Hosur – Yesvantpur DEMU Passenger will be inaugurated byShri D V Sadananda Gowda, Hon’ble Union Minister of Railways at 11.30 hours from, “Yesvantpur Railway Station” .
...
more...

Shri Anantha kumar, Hon’ble Union Minister of Chemicals and fertilizers, Shri D. K. Suresh, Hon’ble Member of Parliament, Shri P.C. Mohan, hon’ble Member of Parliament, Shri Dinesh Gundu Rao, Hon’ble Minister for Food, Civil Supplies and Consumer Affairs, Government of Karnataka,Shri Rama Linga Reddy, Hon’ble Ministerfor Transport and District Incharge of Bangalore Urban, Government of Karnataka and Shri Munirathna, Hon’ble MembeR of Legislative Assembly, will be the special invitees.

Simultaneously, Shri R Dhruvanarayana, Hon’ble Member of Parliament will grace the occasion to flag off Train No.56282/56281 Bangalore City – Chamarajanagar Fast Passenger from Chamarajanagar Railway Station on 01.11.2014.

Shri Prahlad Joshi, Hon’ble Member of Parliament and Shri Suresh Angadi, Hon’ble Member of Parliament has been invited to flag off Train Nos.56921 / 56922 Hubli – Belgaum- Hubli Fast Passenger (Daily) and 17321 / 17322 Hubli – Mumbai (LTT) Weekly Express (via Gadag, Bijapur and Sholapur) from Hubli Railway Station at 11.00 hours.

On 04.11.2014, Ms. Shobha Karandlaje, Hon’ble Member of Parliament has been invited to flag off Chikmagalur – Yesvantpur Fast Passenger (Daily) from Chikmagalur Railway Station at 11.00 hours
The Path, time and composition of the all the new trains will be as follows: -

1.Train No.56925/56926 Bangalore city-Tumkur-Bangalore City (daily) FastPassenger: -
Train No.56925 Bangalore City – Tumkur fast Passenger (daily) leaves Bangalore City at 05.30 hrs and reaches Tumkur at 06.50 hrs.
In the return direction, Train No.56526 Tumkur – Bangalore Fast Passenger (daily) leaves Tumkur at 08.15 hrs and reaches Bangalore City at 09.50 hrs every day.
The train will have stoppages at Yesvantpur, Chikbanavar, Dodbele and Kyatsandra on both directions.
The train will have a composition of 3 Second Class Sleeper coaches, 4 General Second Class coaches, 2 Second Class luggage-cum-brake vans
2.Train No.76521/76522 Yesvantpur-Nelamangala-Yesvantpur Diesel Electrical Multiple Unit
(DEMU) passenger
Train No.76521 Yesvantpur – Nelamangala DEMU Passenger leaves Yesvantpur at 07.30 hrs and reaches Nelamangala at 08.15 hrs.
In the return direction, Train No.76522 Nelamangala – Yesvantpur DEMU Passenger leaves Nelamangala at 8.45 hrs and reaches Nelamangala at 09.40 hrs.
The train will have stoppage Chikbanavar on both directions.
The train will have a composition of 6 Trailing Cars and two Diesel Power Cars.
3.Train No.76523/76524 Yesvantpur-Hosur-Yesvantpur DEMU Passenger: -
Train No.76523 Yesvantpur – Hosur DEMU Passenger leaves Yesvantpur at 14.55 hrs and reaches Hosur at 16.30 hrs every day
In the return direction, Train No.76524 Hosur - YesvantpurDEMU Passenger leaves Hosur at 17.50 hrs and reaches Yesvantpur at 19.20 hrs every day.
The train will have stoppage Hebbal, Banaswadi, Karmelaram and Anekal Road on both directions.
The train will have a composition of 6 Trailing Cars and two Diesel Power Cars.

4.Train No.56281/56282 Chamarajanagar-Bangalore-Chamarajanagar Passenger: -
Train No.56281 Chamarajanagar – Bangalore Passenger leaves Chamarajanagar at 06.55 hrs and reaches Bangalore City at 12.00 hrs.
In the return direction, Train No.56281 Bangalore – Chamarajanagar Passenger leaves Chamarajanagar at 15.30 hrs and reaches Bangalore City at 20.30 hrs.
The train will have stoppages at Nanjanagud, Mysore, Mandya, Maddur, Channapatna, Ramanagaram, Bidadi and Kenger on both directions.
The train will have a composition of 9 General Second Class coaches, 2 Second Class luggage-cum-brake vans.
.

5. Train No.56921/56922 Hubli-Belgaum-Hubli Fast Passenger (Daily): -
Train No.56921 Hubli – Belgaum Fast Passenger (daily)leaves Hubli at 18.00 hrs and reaches Belgaum at 21.30 hrs.
In the return direction, Train No.56922 Belgaum – Hubli Fast Passenger (daily) leaves Belgaum at 06.00 hrs and reaches Hubli at 09.50 hrs.
The train will have stoppages at Dharwad, Alnavar, Londa and Khanapur on both directions.
The train will have a composition of 1 Second Class Sleeper coach, 8 General Second Class coaches, 2 Second Class luggage-cum-brake vans.

6. Train No.17321/17322 Hubli-Lokmanaya Tilak Terminus-Hubli weekly express (via Gadag, Bijapur and Solapur): -
Train No.17321 Hubli – Lokmanya Tilak Terminus Weekly Expressleaves Hubli at 22.30 hrson Saturdays and reaches Lokmanya Tilak Terminus at 16.55 hrs on the next day.
In the return direction, Train No.17322 Lokmanyatilak Terminus - Hubli Weekly Express leaves Lokmanyatilak Terminus at 21.15 hrs on Sunday and reaches Hubli at 17.35 hrs on the next day.
The train will have stoppages at Gadag, Bagalkot, Bijapur, Solapur and Pune on both directions.
The Train will have a composition of 1 Two Tier AC Coach, 1 Three Tier AC Coach, 6 Three Tier Second Class Sleeper Coaches,6 General Second Class Coaches and2 Second Class Sitting cum Luggage Vans.

7. Train No.56277/56278 Chikmagalur-Yesvantpur-Chikmagalur daily fast passenger: -
Train No.56277 Chikmagalur - Yesvantpur daily fast Passenger leaves Chikmagalur at 07.30 hrs and reaches Yesvantpur at 14.15 hrs.
In the return direction, Train No.56278 Yesvantpur - Chikmagalur daily Fast Passenger leaves Yesvantpur at 15.15 hrs and reaches Chikmagalur at 22.20 hrs.
The train will have stoppages at Kadur, Arsikere, Tiptur and Tumkur on both directions.
The train will have a composition of 10 General Second Class coaches, Two Second Class luggage-cum-brake vans.

PUBLIC RELATIONS OFFICER

  
10380 views
Nov 12 2014 (06:06)
tarunsit   6 blog posts
Re# 1274051-1            Tags   Past Edits
The condition of 56925/56926 Bangalore City – Tumkur – Bangalore City is very pathetic. The rakes of shimoga passenger train are used for it, shimoga passenger arrives bangalore city at 5.10 am and this train departs at 5.30 am, giving no sufficient time for cleaning. All the coaches are filled with all kinds of dust and bathrooms make real hell experience. I request railway authorities to do something so that passenger can travel.
  
Rail News
0 Followers
772 views
Commentary/Human InterestSWR/South Western  -  
Jun 22 2014 (10:01)   ‘State should fund railway projects’
 

rdb*^   127022 news posts
Entry# 1143538   News Entry# 181234         Tags   Past Edits
The District Railway Horata Samithi President P. Kodandramaiah asked the State government to expedite the work on Davangere-Chitradurga-Tumkur railway line in the interests of the people in central Karnataka region.Speaking at a meeting of District Railway Horata Samithi meeting on Saturday, he stated that Samithi members had met Union Railway Minister D.V. Sadananda Gowda recently and have convinced him to take up the project on priority basis.

1 posts are hidden.

  
920 views
Jun 22 2014 (19:15)
tarunsit   6 blog posts
Re# 1143538-2            Tags   Past Edits
hope atleast this year, the work on tumkur -davangare railway line will begin.And the state govt act swiftly to give the required land
  
Rail News
0 Followers
1684 views
New/Special TrainsSWR/South Western  -  
Apr 24 2014 (03:57)   Yeshwantpur-Mumbai Weekly Trains
 

rdb*^   127022 news posts
Entry# 1069552   News Entry# 174568         Tags   Past Edits
In order to clear extra rush of passengers, Central Railway has decided to run special weekly express trains between Yeshwanthapur and Mumbai (CSTM) for nine trips in each direction.Accordingly, Yeshwanthapur-Mumbai Weekly Express Special train will depart Yeshwanthapurat 12.10 am on Tuesday, from April 29, and reach Mumbai at 11.30 pm the next day. The special train will arrive/depart Hubli at 8.20/8.30 am. The last service in this direction will be on June 24.In the return direction, Mumbai-Yeshwanthapur Express Special train will depart Mumbai at 5 pm on Wednesday, from April 30, and reach Yeshwanthapur at 4.30 am the next day.
The train will arrive/depart Hubli at 7.50/8 pm. The last service in this direction is on June 25, a release said.

1 posts are hidden.

  
1205 views
Apr 24 2014 (23:55)
tarunsit   6 blog posts
Re# 1069552-3            Tags   Past Edits
good one.does it follow chalukya route

  
1429 views
Apr 25 2014 (11:44)
Vinay Bharadwaj*^~   4709 blog posts   953 correct pred (74% accurate)
Re# 1069552-4            Tags   Past Edits
Yes.. It follows chalukya
  
01
Train Tip
Speed/Punctuality
0 Followers
1709 views
Apr 25 2014 (00:51)   56926/Tumakuru- Bengaluru Passenger (UnReserved)

tarunsit   6 blog posts
Entry# 1070499            Tags   Past Edits
Never try this train. Train is made to stop at yeshvantpur outer almost for an hour. u Will never. reach on time
  
General Travel
0 Followers
453 views
Apr 25 2014 (00:16)  
 

tarunsit   6 blog posts
Entry# 1070490            Tags   Past Edits
The 06502 Tumkur Bangalore special express is of no use.Just for the name sake it is introduced.Never departs or arrives on time, runs slower than a passenger train and moreover it is made to stop at yeshvantpur outer almost for an hour
Page#    6 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Apr 3
Trains with ARP 15 Dep on: Sat Apr 8
Trains with ARP 30 Dep on: Sun Apr 23
Trains with ARP 120 Dep on: Sat Jul 22

  
  

Rail News

  • Steps taken by Railways for Security and Safety  News Entry# 297501
    by: rdb*^  Today (21:40)


    Policing on Railways being a State subject, prevention of crime, registration of cases, their investigation and maintenance of law & order in Railway premises as well as on running trains and security of railway tracks, tunnels & bridges are the statutory responsibility of the State Governments, which they discharge through Government...
  • Easy Access for Persons with Disabilities in Rail Compartments and Toilets  News Entry# 297500
    by: rdb*^  Today (21:39)


    In order to provide additional facilities for Persons with Disabilities (PWDs), Indian Railways has developed designs of coaches having a compartment for PWDs as well as additional features in the lavatories. Some of these features are given below:
    ·...
  • Ro-Ro Freight Service in Indian Railways  News Entry# 297499
    by: rdb*^  Today (21:39)


    Roll-on-Roll-off (RO-RO) service was initially introduced on Konkan Railway during the year 1999. Since then, the service is running on Konkan Railway on Diesel route. On electrified routes, there are operational constraints for running of Ro-Ro service due to Over Head Equipment (OHE). However, during the recent past, trial run of...
  • POS Machines at Rail Reservation Counters  News Entry# 297498
    by: rdb*^  Today (21:38)


    With a view to promoting cashless transaction, it has been decided to install 10,000 Point of Sale (POS) machines in association with State Bank of India at various locations of Indian Railways including ticket counters of Indian Railways.
    ...
  • End to Train Telemetry (EoTT) Device in Trains  News Entry# 297497
    by: rdb*^  Today (21:38)


    The Dedicated Freight Corridor Corporation of India Ltd. (DFCCIL) is an infrastructure provider. End to Train Telemetry (EoTT) device is an alternative of running trains without guard on an exclusive freight corridor.
    (b):...

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site