Disclaimer   
Search Trains
 ♦ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3E
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
2-month Availability Calendar
  Go  
Full Site Search
  Search  
 
Mon Dec 5, 2016 22:04:06 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Dec 5, 2016 22:04:06 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Cost of Periodic Overhaul(POH)of one coach every 12 months  
1 Answers
Jan 14 2012 (5:50PM)
Coach Construction/Seating Arrangements

Entry# 941     
® राहुल जैन ☺आम आदमी झाडू वाले™*^~
Cost of Periodic Overhaul(POH)of one coach every 12 months

1 Followers
3947 views
Jan 14 2012 (4:08PM)
Blog Post# 327340-0     
AKGarg*   Added by: ® राहुल जैन ☺आम आदमी झाडू वाले™*^~  Jan 14 2012 (5:50PM)
Cost of Periodic Overhaul(POH)of one coach every 12 months.
It costs the Indian Railways about 3-4 lakh Rupees for POH of each coach.
In a POH, the broken parts are repaired, light bulbs/tubes replaced, torn seats replaced, suspension overhauled, batteries replaced, wiring repaired if needed, additional charging plug points provided and the coach is repainted.
Scroll to Top
Scroll to Bottom


Go to Mobile site