Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark mode
 
Thu Apr 18 06:13:06 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
What is an EOG?  
1 Answers
Aug 15 2011 (20:47)
Coach Construction/Seating Arrangements

Entry# 609     
Rang De Basanti^
What is an EOG?

204195 views
1
Aug 15 2011 (19:41)
Blog Post# 220766-8     
Rang De Basanti^   Added by: Rang De Basanti^  Aug 15 2011 (20:47)
What is EOG??(Detailed answer--akin to 10 marks Question...!)
End on Generation (EOG) is the system used on fully air conditioned Rajdhani and Shatabdi trains. The system comprises two power cars per train. Each power car has two DG sets and each DG set is rated at 300 kW. These are mounted inside the power car or the entire power car coach which is dedicated for these power plants. The power generated by these DG sets is utilized for hotel load of the train.
According to estimates EOG concepts bring in multiple advantages to
...
more...
railways and release hauling capacity of locomotives while saving energy efficiency by over 90%.
Release of traction hauled loads can improve average speed of coaches. EOG concept eliminates axle mounted generator and corresponding battery bank and inverter on each coach and replace it with one unit of DG set under the SLR.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy