Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Fri Sep 19, 2014 09:19:57 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Trains in the News **new    Stations in the News **new

News Super Search        show all languages
<<prev entry    next entry>>
News Entry# 81684  
Jul 07 2012 (1:58PM)  Coal stock accumulates at railway sidings - The New Indian Express (newindianexpress.com)
back to top
Other News

News Entry# 81684     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: ksgopal**  2614 news posts  
Mahanadi Coalfields Limited, often accused of low supply of coal, is now facing problems in stocking coal which is accumulating at its railway sidings in Talcher Coalfields.
The stock at the sidings at Talcher has gone up from 3.22 lakh tonnes on June 1 to 5.07 lakh tonnes on July 1 due to non-availability of rakes, a release by MCL stated.
Against an average requirement of 35 rakes per day, the average availability in June was 25.4 rakes per day leading to accumulation of stock. This has also resulted in critical stock position at the linked power houses, besides hampering the coal production in MCL.
The MCL has requested the authorities concerned to immediately place sufficient rakes so that the stock
...
Read more...
levels of the power houses are restored at the earliest and power generation is not hampered.
Scroll to Top
Scroll to Bottom