Disclaimer   
News Super Search
 ♦ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
Full Site Search
  Search  
 
Sun Apr 30, 2017 11:03:43 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Apr 30, 2017 11:03:43 IST
Advanced Search
Trains in the News    Stations in the News   
<<prev entry    next entry>>
News Entry# 287166
  
Nov 30 2016 (06:54)  ECoR proposes ‘bulb line’ near Visakhapatnam rail station (www.thehindu.com)
back to top
Commentary/Human InterestECoR/East Coast  -  

News Entry# 287166   Blog Entry# 2076661     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: rdb*^  128472 news posts
The East Coast Railway (ECoR) has urged Chief Minister N. Chandrababu Naidu to prevail upon the Visakhapatnam Port Trust to part with land required to construct a ‘bulb line’ elevated corridor near Visakhapatnam railway station.
×
ECoR (Bhubaneswar-Waltair) General Manager Umesh Singh met the Chief Minister here on Tuesday to apprise him about the need for elevated corridor.
The construction of a bulb line
...
more...
enables engines to reverse without changing the direction of the train, thus reducing halting time. There was a need to develop the bulb line through the Vizag Port area and connecting the main line at Gopalapatnam. It would reduce the time required for reversal of trains at the station. It also reduces the halting time and thereby handling capacity of the station, he said, adding that it takes at least 20 minutes for the engine to reverse at Visakhapatnam right now.
The GM said that elevated corridor could be constructed from VPT R&D Yard. It would be helpful in connecting the Visakhapatnam-Howra-Chennai line with Gopalapatnam. The elevated corridor would help in saving 10 minutes time, power, and improve handling capacity at the Viakhapatnam railway station. The proposed elevated corridor would be of 4 km length and costs ₹ 300 crore, he said.
Responding to it, Mr. Naidu said that he would speak to the VPT authorities. Another meeting would be convened thereafter, he said.

5 posts - Thu Dec 01, 2016 - are hidden. Click to open.

  
649 views
Dec 04 2016 (10:54)
B S Reddy~   129 blog posts
Re# 2076661-6            Tags   Past Edits
raillu lopaliki mallinchesariki traffic perigantlunnada. bagundi sambadam 5 nimishallo loco change antiri. tikka sankarrayya batch lekkunnare
Scroll to Top
Scroll to Bottom


Go to Mobile site