Disclaimer   
News Super Search
 ♦ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
Full Site Search
  Search  
 
Wed Mar 29, 2017 07:39:02 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Mar 29, 2017 07:39:02 IST
Advanced Search
Trains in the News    Stations in the News   
Page#    19388 news entries  <<prev  next>>
  
पश्चिम मध्य रेल मुख्यालय भवन में एटीएम का लोकार्पण पष्चिम मध्य रेल से चलने वाली स्पेषल गाड़ियों की समय अवधि बढ़ी
  
Mar 22 2017 (16:46)  TRANSLOCATION OF TIPPU SULTAN’S ARMOURY BUILDING (www.swr.indianrailways.gov.in)
back to top
SWR/South Western  -  IR Press Release  

News Entry# 297174     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Jayashree ❖ Amita*^  35885 news posts
The 1.7 K.M. stretch of doubling work near Kaveri Bridge at Srirangapatna, which was pending due to the location of Tippu’s Armouryright in the way of proposed alignment of Double track, will soon be takenup and completed. With the completion of doubling of this stretch, the entire Mysuru-Bengaluru line will become double line.This is made possible as the Tippu’s Armoury, the masonary structure weighing 900 tonnes has been shifted using International expertise by about 130 metres well beyond the limit required for the 2nd Line.
A request was made to Govt. of Karnataka to arrange to shift the monument within the available Railway land.In turn Govt. of Karnataka has agreed the proposal of shifting of monument through cabinet approval and conveyed their
...
more...
decision that the “shifting of the monument has to be carried out by Railways with their own cost”.
Though the Govt. of Karnataka has accorded approval for shifting, the new location was required to be cleared by National Monument Authority of India as the area is a restricted area (100 to 300m from the monument).Railways sought the permission in writing for the same and the permission granted by the Competent authority o­n 14-03-2013 with a validity of 03 years from the date of issue, subsequently extension was granted for o­ne more year.
This being unique work, executed for the first time in India, no agency was readily available and the methodology for the shifting was also not known.Construction organization of South Western Railway has engaged Institution of Engineers (India) for providing consultancy services. Institution of Engineers (India) has submitted their report.In addition, Railways, also has taken the available literature from internet and interacted with the agencies in USA who are executing similar shifting/translocation works through email, Phone and o­ne of the interested working agency of construction organisation has arranged a private visit of the “Expert House Movers”,USA to the monument, interaction could be done with them.With all these inputs, methodology for shifting could be formulated.Approval of Department of Archaeology, Govt. of Karnatka was obtained for the methodology of shifting.Tender schedule also formulated based o­n the above inputs.
Tender for the work invited first time received no response.Two agencies who made JV arrangements with the agencies abroad (with experience of translocation of buildings) participated in the tender floated second time.The work was awarded to M/s. PSL Engineering (Indian based) – Wolfe (USA based) (JV).
The shiftingwas very sensitive and critical work as the same is close to existing ASI heritage monuments, running Railway line, Cauvery river, old/new Railway bridges over the river.Extensive precautions have been taken by protecting the work site with due barricading.Preparatory work for shifting has been started almost two months back.
METHODOLOGY OF SHIFTING:-
PROTECTION TO EXISTING RAILWAY TRACK:The monument is located at 10.1m from the center line of existing Broad Gauge track, to facilitate excavation of 4m from the formation level at the edge of formation 40 nos 1m dia bored cast in situ piles are driven at 1.2m c/c parallel to the existing track.
Zones of load:The building is divided in to 03 zones as per the actual load distribution, and the requirement of jacks to be inserted underneath the structure were arrived based o­n this analysis.
Carry line of the building:As per the approved plan 2’-0” above the floor level is called as the carry line.Armoury building will be carried o­nly above this carry line, the portion underneath this carry line must be reconstructed at the new location.Armoury building is having an irregular boulder filled foundation grouted with sand.For insertion of beams the holes must be cut in the wall, the same can’t be done in the boulders hence the same is done in the main brick masonry walls underneath the carry line.
Insertion of Load frames:For lifting and moving the building above carry line, Load frames consisting of 05 nos. of Main beams, 11 nos. of Cross beams and 31 nos. of needle beams as per the approved drawing.
As per the load distribution of zones of loads there are 37 jacks to be inserted underneath the load frames.All these jacks are connected to the Unified jacking system for simultaneous and synchronized operation to prevent any unequal lifting and damages to the structure.
Lifting of the structure:After insertion of all the beams, the structure to be lifted using Unified Jacking system by 2’-0” and supported o­n wooden cribs for insertion of roll beams, rollers and Push rams.
Movement of structure:The location approved for shifting of the monument by ASI, is diagonally located from the current location.Due to the geometry of the building the building can’t be moved diagonally, the structure must be moved in two mutually perpendicular location to its final location to keep the orientation same.The move involves movement of100m length along the first direction and 30m long in the second direction.
Lowering of Structure:The building will be lowered and integrated o­n the pre-laid foundation at the new location.
First such work in India completed successfully today.
1
Dimensions of Armoury
10 m x 13 m
2
Weight of the Armoury
900Tonnes
3
Age of Monument
Over 200 Years
4
Structure Lifted by
2 Ft.
5
Distance moved
100 m + 30 m = 130 m
6
Distance moved day wise
1st Day : 40 m
2nd Day : 42 m
3rd Day:18 m
4th Day:30 m
7
Shiftingstarted o­n
06.03.2017
8
Shifting completed o­n
10.03.2017
9
Cost of shifting
Rs.13.6 Crores
10
Work executed by
South Western Railway through
M/S PSL - Wolfe JV inco-ordination withArcheological Dept. (GoK)
11
Man power involved
20 Railway officials along with
26 Technicians
(6 - M/s. Wolfe & 20 - M/s. PSL)
12
Method of lifting
Unified jacking system
13
Method of shifting
Hydraulic body push Rams
14
In charge (Railways)
Shri K Ravichandran,
Dy.Chief Engineer/Mysuru
15
In charge (Firm)
Shri Jamin Buckingham
16
Scope of shifting Work
(I)Preparatory Work
(2 months)
§Detailed feasibility & investigative studies
§Protection to existing Railway track.
§Making foundation ready at new location
§Excavation work around the structure
(II)Actual Work
(4 days)
§Insertion of load frames
§Lifting of structure
§Movement of structure
§Lowering of structure
(III)After Shifting
(1.5 months)
§Separatingstructure from beams
§Building Compound wall around the structure
§First such translocation of a structure in India – very important given the historical value of monument involved.
Extremely sensitive as the site is adjacent to existing Railway line, A SI protected monuments, Cauvery river, Railway bridges over the river etc.
Mysuru-bengaluru Doubling project
Last stretch of 1.7 Km pending for translocation of Tippus Armoury
Track linking to be completed by : 31.03.2017
Inspection of Commissioner of Railway Safety and sanction will follow
The entire doubling of 139 Km section will be completed.
Doubling was done in phases
Will help in dealing more trains and reduce running time of trains
Will be immensely helpful in connecting Bengaluru and Mysuru - two most important cities of Karnataka
Ramanagaram-Mysore doubling (93km) with electrification of Kengeri - Mysore (125 km) - Target in 2015-16 is 28 km
Cost sharing pattern : Doubling GoK : Rly – 2/3 : 1/3,
Electrification GoK:Rly – 1:1
Year of sanction-2007-08
Anticipated cost-Rs.874.57 Cr.
  
Mar 22 2017 (16:45)  LICENSED PORTERS (COOLIES) WILL BE CALLED AS “SAYAHAKS” (www.swr.indianrailways.gov.in)
back to top
SWR/South Western  -  IR Press Release  

News Entry# 297173     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Jayashree ❖ Amita*^  35885 news posts
As per the announcement made by Hon’ble Union Minister for Railways during the Budget speech for the year 2016-17, the Licensed Porters (Coolies) will henceforth be called as “Sahayaks”.
This is to improve their self esteem and to shed colonial relic term that was being used.
  
Mar 22 2017 (16:34)  INTRODUCTION OF LOKMANYA TILAK TERMINUS -TATANAGAR ANTYODAYA EXPRESS BI-WEEKLY from 25 th of March (www.cr.indianrailways.gov.in)
back to top
New/Special TrainsCR/Central  -  IR Press Release  

News Entry# 297172   Blog Entry# 2210186     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Southern Railway  80 news posts
INTRODUCTION OF LOKMANYA TILAK TERMINUS -TATANAGAR ANTYODAYA EXPRESS BI-WEEKLY,
Shri Suresh Prabhu, Hon’ble Minister of Railways recently flagged off Inaugural special of Lokmanya Tilak Terminus - Tatanagar Antyodaya Unreserved Superfast Express (bi-weekly). The details of regular services of this train will run as under-
22885/22886 Lokmanya Tilak Terminus - Tatanagar - Lokmanya Tilak Terminus Antyodaya Express Unreserved Superfast Bi-weekly
Train No. 22885 will leave
...
more...
Lokmanya Tilak Terminus at 13.20 hrs o­n every Tuesday and Saturday from 25.3.2017 and will arrive Tatanagar at 14.20 hrs next day.
Train No. 22886 will leave Tatanagar at 21.55 hrs o­n every Sunday and Thursday from 23.3.2017 and will arrive Lokmanya Tilak Terminus at 23.45 hrs next day.
Halts: Igatpuri, Chalisgaon*, Bhusaval, Nagpur, Gondia, Durg, Raipur, Bilaspur, Raigarh, Jharsuguda, Rourkela and Chakradharpur (* The halt at Chalisgaon provided o­n experimental basis for a period of six months)
Composition: 16 Second class coaches.
Bookings : Base fare of unreserved second class of Antyodaya Express train shall be 15% higher than the base fare of unreserved second class of Mail/Express trains and other charges like superfast surcharge, Mela surcharge if applicable etc. shall be levied separately.
Concessional tickets, tickets against free complimentary passes which are not reimbursed and Railway Privilege Passes/PTOs etc not be admissible in Antyodaya train.
--- --- --- --- --- --- --- --- ---

  
318 views
Mar 25 2017 (11:46)
nasik to pune k sapne kb pure honge   256 blog posts   1307 correct pred (63% accurate)
Re# 2210186-1            Tags   Past Edits
WHY THERE IS NO STOP AT NK AND MMR
  
Mar 22 2017 (16:31)  INTRODUCTION OF NEW UNRESERVED DAILY EXPRESS TRAIN BETWEEN SOLAPUR –MIRAJ (www.cr.indianrailways.gov.in)
back to top
New/Special TrainsCR/Central  -  IR Press Release  

News Entry# 297171     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Southern Railway  80 news posts
INTRODUCTION OF NEW UNRESERVED DAILY EXPRESS TRAIN BETWEEN
SOLAPUR –MIRAJ
Shri Suresh Prabhu, Hon’ble Minister of Railways recently flagged off Miraj - Solapur Unreserved Daily Express train. The details of regular services of this train as under-
11309/11310 Solapur – Miraj - Solapur Unreserved Express (Daily)
Train
...
more...
No. 11309 leaving Solapur at 06.00 hrs daily from 19.3.2017 and arriving Miraj at 12.15 hrs same day.
Train No. 11310 leaving Miraj at 15.25 hrs daily from 18.3.2017 and arriving Solapur at 21.00 hrs same day.
Halts: Mohol, Mhada, Kurduwadi, Modlimb, Pandharpur, Sangola, Jath Road, Dhalgaon, Kavathe Mahankal, Salgare and Arag
Comopsition: 12 General second class/Seating coaches.
--- --- --- --- --- --- --- --- ---
Date: March 22, 2017
  
Mar 22 2017 (16:29)  INTRODUCTION OF LOKMANYA TILAK TERMINUS - LUCKNOW AC SUPERFAST EXPRESS WEEKLY -Bookings open from 24.3.2017 (www.cr.indianrailways.gov.in)
back to top
New/Special TrainsCR/Central  -  IR Press Release  

News Entry# 297170     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Southern Railway  80 news posts
INTRODUCTION OF LOKMANYA TILAK TERMINUS - LUCKNOW AC SUPERFAST EXPRESS WEEKLY -Bookings open from 24.3.2017
Shri Suresh Prabhu, Hon’ble Minister of Railways recently announced introduction of Lokmanya Tilak Terminus - Lucknow Air-conditioned Superfast Express (weekly). The details of regular services of this train will run as under-
22121/22122 Lokmanya Tilak Terminus – Lucknow - Lokmanya Tilak Terminus AC Superfast Express (weekly)
Train No.22121 will
...
more...
leave Lokmanya Tilak Terminus at 14.20 hrs o­n every Saturday from 8.4.2017 and arrive Lucknow at 13.45 hrs next day.
Train No. 22122 will leave Lucknow at 16.20 hrs o­n every Sunday from 9.4.2017 and arrive Lokmanya Tilak Terminus at 17.30 hrs next day.
Halts: Thane, Kalyan, Nasik, Jalgaon, Bhusaval, Habibganj, Jhansi, Orai and Kanpur
Composition: o­ne First AC, o­ne First AC cum AC 2-Tier, Four AC 2-Tier and 11 AC 3-Tier
Reservation: Bookings for 22121 AC Superfast Express will open from 24.3.2017 at all PRS locations and through Internet.
--- --- --- --- --- --- --- --- ---
Date: March 22, 2017
  
Mar 22 2017 (13:10)  URS SPECIAL TRAIN BETWEEN KAMAKHYA AND AJMER ( 02 Trips) (www.nr.indianrailways.gov.in)
back to top
New/Special TrainsNR/Northern  -  IR Press Release  

News Entry# 297166     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Jayashree ❖ Amita*^  35885 news posts
For the convenience of rail passengers and to clear extra rush of passengers during Urs Fair , Railways will run the05615/05616 Kamakhya-Ajmer- Kamakhya Urs Special Train as per the following programme :
05615/05616 Kamakhya-Ajmer - Kamakhya Urs Special Train (02 trips)
The 05615 Kamakhya-Ajmer Urs Special Train will depart from Kamakhya at 06.45. p.m. o­n 29.03.2017to reach Ajmer at 09.15 p.m. o­n 31.03.2017 (01 trip). In the return direction, the 05616 Ajmer –Kamakhya Urs Special Train will depart from Ajmer at 07.30 a.m. o­n 01.04.2017to reach Kamakhya at 11.00 a.m. o­n 03.04.2017 (01
...
more...
trip).
Comprising of one AC 2 tier, four AC 3 tier, eight Sleeper Class and two disabled friendly Second class cum Luggage Van coaches, the 05615/05616 Kamakhya-Ajmer- Kamakhya Urs Special Train will stop at Goalpara Town, New Bongaigaon, Kokrajhar, Fakiragram, New Alipurduar, New Coochbehar, Mathabanga, Maynaguri Road, Jalpaiguri Road, New Jalpaiguri,Aluabari Road, Kishanganj, Barsoi, Katihar, Naugachia, Khagaria, Begusarai, Barauni, Hajipur, Sonpur, Chhapra, Ballia, Mohamadabad, Azamgarh, Khorasan Road, Shahganj, Lucknow, Moradabad, Ghaziabad, Delhi, Rewari, Narnaul, Neem Ka Thana, Sri Madhupur, Ringas Jn., Phulera, Kishangarh & Madar stations enroute in both the directions.
…………………..
  
Mar 22 2017 (13:05)  SUMMER SPECIAL TRAIN (www.sr.indianrailways.gov.in)
back to top
New/Special TrainsSR/Southern  -  IR Press Release  

News Entry# 297163   Blog Entry# 2206589     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Jayashree ❖ Amita*^  35885 news posts
The following summer special train will be run to clear the extra rush of traffic
Special fare special train from Chennai Egmore to Hubballi
Train No.07323 Chennai Egmore – Hubballi special fare special train will leave Chennai Egmore at 13.00 hrs. o­n 04th, 06th, 11th, 13th, 18th, 20th, 25th& 27th April, 2017 and reach Hubballi at 04.30 hrs. the next day.
Composition:AC 2-tier –
...
more...
1, AC 3-tier – 2, Sleeper Class – 6, General Second Class – 6 & Luggage-cum-brake van -2 coaches.
Stoppages:Arakkonam, Renigunta, Koduru, Rajampet, Nandalur, Cuddapah, Yerraguntala, Muddanuru, Tadipatri, Gooty, Guntakal, Ballari, Toranagallu, Hosapete, Koppal and Gadag.
Advance reservations for the above train are open

  
1346 views
Mar 22 2017 (15:04)
srinivasvasanthi~   3710 blog posts   13 correct pred (50% accurate)
Re# 2206589-1            Tags   Past Edits
This special Channai to Hubbali via Renigunda ,Guntakkal and ,Bellary train have to be extended to Mumbai LTT via Konkan or Pune routes since no trains are operated in these routes till date for good patronages.
  
Mar 22 2017 (13:05)  INSPECTION OF THE NEWLY CONVERTED BROAD GAUGE RAILWAY LINE BETWEEN PODANUR - POLLACHI AND SPEED TRIAL (www.sr.indianrailways.gov.in)
back to top
SR/Southern  -  IR Press Release  

News Entry# 297162     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Jayashree ❖ Amita*^  35885 news posts
Commissioner of Railway Safety, Southern Circle, Bangalore will inspect the newly converted broad gauge railway line in Podanur – Pollachi section o­n 23rd& 24th March, 2017.
Furthermore, the Commissioner of Railway Safety, Southern Circle, Bangalore will also conduct a high speed trial run in Podanur – Pollachi section o­n 24th March, 2017 between 14.00 hrs. – 19.00 hrs.
All users of railway lines between Podanur – Pollachi are hereby cautioned not to approach / trespass the railway line.
  
Mar 22 2017 (12:01)  W.RLY TO RUN SUPERFAST HOLIDAY SPECIAL TRAIN FROM BANDRA TERMINUS TO BIKANER (www.wr.indianrailways.gov.in)
back to top
New/Special TrainsWR/Western  -  IR Press Release  

News Entry# 297161     
   Tags   Past Edits
This is a new feature showing past edits to this News Post.

Posted by: Jayashree ❖ Amita*^  35885 news posts
For the convenience of passengers during the summer vacation and with a view to clear the extra rush, Weekly Superfast Special train o­n Special fare will be run between Bandra Terminus & Bikaner with effect from 12th April, 2017 to 29th June, 2017. The details of the train is as under:-

·Train No. 09011 / 09012 Bandra Terminus – Bikaner – Bandra Terminus (Weekly) Super fast Special train o­n Special fare
...
more...
[24 services]
Train No.09011 Bandra Terminus - Bikaner (Weekly) Superfast Special train o­n Special fare will leave Bandra Terminus at 11.25 hrs every Wednesday and will reach Bikaner o­n the next day (Thursday) at 9.25 hrs. This train will run from 12th April to 28th June, 2017.
Similarly, Train No 09012 Bikaner - Bandra Terminus (Weekly) Superfast Special train o­n Special fare will leave Bikaner at 14.50 hrs every Thursday and will reach Bandra Terminus o­n the next day (Friday) at 12.45 hrs. This train will run from 13th April to 29th June, 2017.
The train will halt at Borivali, Vapi, Surat, Bharuch, Vadodara, Anand, Nadiad, Ahmedabad, Mehsana Jn., Palanpur, Abu Road, Falna, Marwar Jn., Pali Marwar, Jodhpur, Merta Road, Nagaur and Nokha stations in both directions.
The train will have AC 2 Tier, AC 3 Tier, Sleeper class coaches and Pantry Car.

Booking for train No. 09011 Bandra Terminus - Bikaner (Weekly) Superfast Special train o­n Special fare will be opened from 23rd March, 2017 with Advance Reservation period of 120 days at all Passenger Reservation Centre and IRCTC website.
******
Page#    19388 news entries  <<prev  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site