Timeline UpdatesTrip UpdatesNews PostsPvt PostsPvt PostsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Thu Sep 18, 2014 05:11:10 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
PNR Super Search
PNR Posts/Predictions/Stamps by Happy to Help**
Page#    Showing 1 to 10 of 1907 blog entries  next>>
Predictions: 19
confirm: 1
rac: 0
wl: 18
Journey: Mon Jun 09, 2014 @ 17:25
12293/Mumbai LTT-Allahabad AC Duronto Express
Entry# 1127546
   Posted by: Happy to Help**   860 blog posts   799 correct pred (57% accurate)
PNR: 832-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl 128   |   Charting: < 09:39   |   Similar PNRs
LTT/Mumbai Lokmanya Tilak Terminus   to   ALD/Allahabad Junction   |   1344 km / 1344 km
Original Status as of: Jun 08 2014 (10:57AM)
Passenger 1: Waitlist# 6 (Booking Status: W/L 10,CK)
Passenger 2: Waitlist# 7 (Booking Status: W/L 11,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 09 2014 (1:26PM)
Passenger 1: Waitlist# 2 (Booking Status: W/L 10,CK)
Passenger 2: Waitlist# 3 (Booking Status: W/L 11,CK)
Chart PREPARED
Predictions: 22
confirm: 0
rac: 0
wl: 22
Journey: Mon Jun 09, 2014 @ 00:35
12167/Mumbai LTT - Varanasi SF Express
Entry# 1127544
   Posted by: Happy to Help**   860 blog posts   799 correct pred (57% accurate)
PNR: 872-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl 32   |   Charting: < 16:36   |   Similar PNRs
LTT/Mumbai Lokmanya Tilak Terminus   to   BSB/Varanasi Junction   |   1493 km / 1493 km
Original Status as of: Jun 08 2014 (10:57AM)
Passenger 1: Waitlist# 4 (Booking Status: W/L 7,CK)
Passenger 2: Waitlist# 5 (Booking Status: W/L 8,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 08 2014 (8:59PM)
Passenger 1: Waitlist# 3 (Booking Status: W/L 7,CK)
Passenger 2: Waitlist# 4 (Booking Status: W/L 8,CK)
Chart PREPARED
Predictions: 40
confirm: 6
rac: 28
wl: 6
Journey: Sun Jun 08, 2014 @ 06:45
12506/North East Express
Entry# 1126931

PNR: 245-xxxxxxx    |   AC 2-tier - 2A   |   Tot Seats: Avbl 5   |   Charting: < 05:34   |   Similar PNRs
ANVT/Delhi Anand Vihar Terminal   to   NJP/New Jalpaiguri Junction   |   1458 km / 1866 km
Original Status as of: Jun 07 2014 (5:48PM)
Passenger 1: Waitlist# 4 (Booking Status: W/L 10,GNWL)
Passenger 2: Waitlist# 5 (Booking Status: W/L 11,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 08 2014 (10:11PM)
Passenger 1: A1,10 (Booking Status: W/L 10,GNWL)
Passenger 2: A1,44 (Booking Status: W/L 11,GNWL)
Train Status TRAIN IS RUNNING LATE BY 14 Hour(s) and 10 Minute(s)
Chart PREPARED
Predictions: 10
confirm: 9
rac: 0
wl: 1
Journey: Tue Oct 15, 2013 @ 16:50
12954/August Kranti Rajdhani Express
Entry# 876658
   Posted by: Happy to Help**   860 blog posts   799 correct pred (57% accurate)
PNR: 215-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >4   |   Charting: < 09:44   |   Similar PNRs
NZM/Delhi Hazrat Nizamuddin   to   BVI/Mumbai Borivali   |   1349 km / 1378 km
Original Status as of: Oct 14 2013 (10:27AM)
Passenger 1: Waitlist# 2 (Booking Status: W/L 10,RSWL)
Passenger 2: Waitlist# 3 (Booking Status: W/L 11,RSWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 14 2013 (9:26PM)
Passenger 1: Can/Mod (Booking Status: W/L 10,RSWL)
Passenger 2: Can/Mod (Booking Status: W/L 11,RSWL)
Chart NOT Prepared
Predictions: 54
confirm: 54
rac: 0
wl: 0
Journey: Mon Oct 08, 2012 @ 23:30
17255/Narasapur - Hyderabad Express
Entry# 539320
 
   Posted by: Sree Chandra   3 blog posts   49 correct pred (51% accurate)
PNR: 434-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >48   |   Charting: < 17:05   |   Similar PNRs
GNT/Guntur Junction   to   SC/Secunderabad Junction   |   281 km / 461 km
Original Status as of: Sep 30 2012 (11:04PM)
Passenger 1: Waitlist# 10 (Booking Status: W/L 62,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.
I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: Oct 08 2012 (10:25PM) 
Passenger 1: S1,72/Coach Position:21 (Booking Status: W/L 62,RLGN)
Chart PREPARED

2 Trip Diary Posts are hidden. Click to open.
Predictions: 40
confirm: 35
rac: 1
wl: 4
Journey: Mon Oct 08, 2012 @ 22:35
14313/Mumbai LTT - Bareilly Weekly Express
Entry# 543970
   Posted by: hailvivek   2 blog posts   17 correct pred (58% accurate)
PNR: 842-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >9   |   Charting: < 19:03   |   Similar PNRs
BPL/Bhopal Junction   to   BE/Bareilly Junction   |   782 km / 1606 km
Original Status as of: Oct 06 2012 (1:37PM)
Passenger 1: Waitlist# 8 (Booking Status: W/L 11,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 08 2012 (7:05PM) 
Passenger 1: A1,14 (Booking Status: W/L 11,RLGN)
Chart PREPARED

1668 views
Oct 08 2012 (7:03PM)        

rdb**   20602 blog posts   252369 correct pred (77% accurate)  
Re# 543970-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.

1421 views
Oct 08 2012 (10:12PM)        

CHENNAI EXPRESS   152 blog posts   18109 correct pred (66% accurate)     Ph:+918296142358
Re# 543970-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
aap bareilly kis liye ja rhe ho?
Predictions: 54
confirm: 47
rac: 6
wl: 1
Journey: Mon Oct 08, 2012 @ 22:30
22108/Latur-Mumbai CST SF Express
Entry# 543504
   Posted by: Pratap   417 blog posts   5652 correct pred (74% accurate)
PNR: 810-xxxxxxx    |   AC 2-tier - 2A   |   Tot Seats: Avbl >7   |   Charting: < 17:41   |   Similar PNRs
LUR/Latur   to   CSTM/Mumbai CST   |   528 km / 528 km
Original Status as of: Oct 05 2012 (8:43PM)
Passenger 1: Waitlist# 1 (Booking Status: W/L 2,GNWL)
Passenger 2: Waitlist# 2 (Booking Status: W/L 3,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 09 2012 (10:05AM) 
Passenger 1: HA1,15 (Booking Status: W/L 2,HO)
Passenger 2: HA1,16 (Booking Status: W/L 3,HO)
Chart PREPARED

607 views
Oct 08 2012 (6:54PM)        

Chhota Aadmi**   2131 blog posts   44388 correct pred (88% accurate)  
Re# 543504-3               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
pratap ji, can you please tell how did you get it confirmed through HO quota ? do u know someone is railways or it this a work of an agent ?
Predictions: 25
confirm: 23
rac: 0
wl: 2
Journey: Mon Oct 08, 2012 @ 23:10
14511/Nauchandi Express
Entry# 545677
 
   Posted by: krishnasingh   1 blog posts   19 correct pred (57% accurate)
PNR: 213-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl 13   |   Charting: < 15:13   |   Similar PNRs
LKO/Lucknow Charbagh NR   to   MTC/Meerut City Junction   |   459 km / 774 km
Original Status as of: Oct 08 2012 (4:55PM)
Passenger 1: B1,52/Coach Position:8 (Booking Status: W/L 2,RLGN)
Passenger 2: Waitlist# 2 (Booking Status: W/L 3,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.
I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: Oct 08 2012 (7:34PM) 
Passenger 1: B1,52/Coach Position:8 (Booking Status: W/L 2,RLGN)
Passenger 2: B1,4/Coach Position:8 (Booking Status: W/L 3,RLGN)
Chart PREPARED
Predictions: 33
confirm: 33
rac: 0
wl: 0
Journey: Mon Oct 08, 2012 @ 23:00
11472/Jabalpur - Indore Express
Entry# 545657
   Posted by: R A A Z KUMAR   14 blog posts   951 correct pred (77% accurate)
PNR: 810-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl 32   |   Charting: < 15:17   |   Similar PNRs
JBP/Jabalpur Junction   to   BPL/Bhopal Junction   |   337 km / 554 km
Original Status as of: Oct 08 2012 (4:31PM)
Passenger 1: Waitlist# 2 (Booking Status: W/L 2,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 08 2012 (7:34PM) 
Passenger 1: B1,26/Coach Position:14 (Booking Status: W/L 2,CK)
Chart PREPARED
Predictions: 40
confirm: 31
rac: 9
wl: 0
Journey: Mon Oct 08, 2012 @ 20:40
12290/Nagpur - Mumbai CST Duronto Express
Entry# 545431
   Posted by: LOKESH07   2 blog posts   4328 correct pred (58% accurate)
PNR: 830-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >312   |   Charting: < 12:51   |   Similar PNRs
NGP/Nagpur Junction   to   CSTM/Mumbai CST   |   0 km / 0 km
Original Status as of: Oct 08 2012 (12:41PM)
Passenger 1: RAC 51 (Booking Status: W/L 78,GNWL)
Passenger 2: RAC 52 (Booking Status: W/L 79,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 08 2012 (6:59PM) 
Passenger 1: S6,18/Coach Position:18 (Booking Status: W/L 78,GNWL)
Passenger 2: S6,21/Coach Position:18 (Booking Status: W/L 79,GNWL)
Chart PREPARED
Page#    1907 PNR Entries  next>>

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Sep 28, 2014
Trains with ARP 30 Dep on: Sat Oct 18, 2014
Trains with ARP 60 Dep on: Mon Nov 17, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 1209120
    Sep 07 (03:36PM)


    -@all members: This is an IMPORTANT reminder to all members that NO MONETARY transactions are permitted within the scope of IRI. Members are NOT ALLOWED to borrow/lend money to each other, book rail tickets for each other, introduce themselves as "IRI Members/Admins" and solicit monetary favours, asking to book rail tickets...
  • Entry# 1204822
    Sep 02 (07:04PM)


    With the roll out of new TTs, we are introducing 3 new enhancements: . 1. "To Be Introduced" trains: As the title implies, Admins may add Trains that are announced in the Budget and Not yet introduced, to this list, with WHATEVER tentative TT is available, and whatever sketchy or vague information...
  • Entry# 1193896
    Aug 21 (10:23PM)


    The new IRI logo can now be seen. Actually, we are reluctant to make changes to the logo (for the sake of recognizability and consistency), but some very slight modification was done this time. Here is the post-facto rationalization of the logo: . 1. The Chakra is the Wheel symbolizing Transportation/Travel which...
  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
Scroll to Top
Scroll to Bottom