Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jun 28, 2017 04:32:36 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jun 28, 2017 04:32:36 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 805672-0
Details Edit
Large Station Board;
Entry# 953219-0
Details Edit
Large Station Board;
Entry# 2150694-0
Details Edit
Large Station Board;
Entry# 2150700-0

BTI/Bathinda Junction (7 PFs)
ਬਠਿੰਡਾ ਜੰਕਸ਼ਨ     बठिण्डा जंक्शन

Track: Construction - Doubling+Electrification

Kikar Bazar Rd, Bathinda
State: Punjab

Elevation: 207 m above sea level
Zone: NR/Northern   Division: Ambala
No Recent News for BTI/Bathinda Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 7
Number of Halting Trains: 54
Number of Originating Trains: 17
Number of Terminating Trains: 17
Rating: 3.8/5 (45 votes)
cleanliness - good (7)
porters/escalators - good (5)
food - good (7)
transportation - good (6)
lodging - good (6)
railfanning - good (4)
sightseeing - good (5)
safety - good (5)

Nearby Stations

GSW/Gursar Shnewala 9 km     BTIC/Bathinda Cantt. 9 km     BWX/Bahman Diwana 9 km     KZW/Katar Singhwala 10 km     GNA/Goneana Bhai Jagta 12 km     GHB/Gahri Bhagi 15 km     BHX/Bulluana 16 km     SGA/Shergarh 17 km     SGF/Sangat 17 km     KTF/Kot Fatteh 18 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 105 blog entries  next>>
  
Pic Upload
0 Followers
707 views
Jun 12 2017 (15:00)   BTI/Bathinda Junction (7 PFs)

rohitjoshi1289   18 blog posts
Entry# 2317370            Tags   Past Edits
Update station pic of bathinda junction bti NR Division ambala

  
619 views
Jun 12 2017 (15:05)
➡➡Shoubhik⬅⬅^~   1233 blog posts   272 correct pred (84% accurate)
Re# 2317370-1            Tags   Past Edits
#SB updated

  
502 views
Jun 12 2017 (23:55)
Ashutosh Singh   58 blog posts
Re# 2317370-2            Tags   Past Edits
No sign of electrification at BTI stn.

  
416 views
Jun 13 2017 (21:37)
SGNRTPJ Humsafar Express 14715   114 blog posts
Re# 2317370-3            Tags   Past Edits
Poles have been installed upto Rampuraphul station. And material (sleepers etc.) for doubling of RBR section has also reached at most of the intermediate stations. I saw it on Sunday.
  
General Travel
0 Followers
295 views
Jun 15 2017 (18:19)   BTI/Bathinda Junction (7 PFs)

Tubeligjt to 4 din bhi nahi chali^~   82820 blog posts   5299 correct pred (78% accurate)
Entry# 2321811            Tags   Past Edits
Bathinda - Suratgarh doubling is really necessary
  
General Travel
0 Followers
1032 views
May 16 2017 (17:39)   BTI/Bathinda Junction (7 PFs)

Saurabh~   229 blog posts
Entry# 2279579            Tags   Past Edits
Electrification Poles at Bathinda jn.(Outer) towards Mansa . They are electrifying BTI jn at full swings.
  
Pic Upload
0 Followers
1993 views
Feb 03 2017 (23:05)   BTI/Bathinda Junction (7 PFs)

rohitjoshi1289   18 blog posts
Entry# 2150714            Tags   Past Edits
Upload station pic
  
Info Update
0 Followers
2639 views
Apr 07 2017 (07:46)   HSR/Hisar Junction (6 PFs)

4πu¶am*^~   5960 blog posts   42385 correct pred (87% accurate)
Entry# 2225516            Tags   Past Edits
Tender for Electrification.

  
2385 views
Apr 08 2017 (22:28)
Ashutosh Singh   58 blog posts
Re# 2225516-1            Tags   Past Edits
What is STPS? ??
Page#    Showing 1 to 5 of 105 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.