Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Apr 23 21:36:28 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 1401647-0
Medium; Platform Pic; Large Station Board;
Entry# 1330017-0


MUE/Mudkhed Junction (4 PFs)
मुदखेड़ जंक्शन
मुदखेड़ जंक्शन | مُدکھیڑ جنکشن


Track: Double Electric-Line

Updated: Mar 12 (22:26)
Show ALL Trains
Jn Pt-PAU/MJRI/NZB ,MSH3, Mudkhed, Nanded Dist., Pin-431806
State: Maharashtra

Elevation: 372 m above sea level
Type: Junction   Category: NSG-5
Zone: SCR/South Central   Division: Hazur Sahib Nanded


No Recent News for MUE/Mudkhed Junction
Nearby Stations in the News
Number of Platforms: 4
Number of Halting Trains: 72
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 4.1/5 (31 votes)
cleanliness - excellent (4)
porters/escalators - good (4)
food - good (4)
transportation - good (4)
lodging - good (3)
railfanning - good (4)
sightseeing - good (4)
safety - excellent (4)
Show ALL Trains

Station Forum

Page#    Showing 6 to 10 of 172 blog entries  <<prev  next>>
Travelogue
83029 views
5

Feb 04 (20:02)   07605/Tirupati - Akola Special Fare Special (PT) | NED/Hazur Sahib Nanded (4 PFs) | UBL/WDG-4D/70639
PattasuBalu~
PattasuBalu~   1976 blog posts
Entry# 5961290            Tags   Past Edits
2 compliments
Great:Fantastic fantastic fantastic!!! Great
PART - 3: Special getting special treatment.
.
For those, who have not read
Part - 1: /blog/post/5903996
Part - 2: /blog/post/5913406
.
...
more...

As there used to be gap between the two freight bogies, which was exactly present near the track sided window seat of mine, I was checking the running status of amravati express, eager to see it's link. In a short while, I was able to hear a loud honk following which amaravathi express bound to howrah slowly strolled into platform 2 of Dhone Jn, lead by some WAP 4 locomotive. Could not figure out the shed.
.
After this, went to the platform, strolled towards locomotive and came back, there was some shop selling only idlis and vadas, got some and had my dinner. Cost was 60 rs for 4 idlis and 2 vadas and taste was decent. still 10 minutes was there for departure of my train, and announcement was made for vijayawada bound amaravathi from hubbali at platform 2.
.
Our train departed dhone bang on time. since the whole day for me went in continuous journey and two transits already, was tired enough and laid down bed and started sleeping immediately after the train departing dhone. Actually had an idea that there will be a huge lineup for crossing thereafter till mahabubnagar post which will be double line, and expected that will wake up post kamareddi. Slept for a while and started sweating after some 10 - 15 minutes of sleep to find out that our train has been looped at Bogolu, the very next station of Dhone junction.
.
Wondering that is it looped for crossing with some goods train, started to check the line-up on the opposite that is supposed to cross us within mahabubnagar, and surprised to see that the Passenger train from Kacheguda to Guntakal is more than 3 hours delayed as of now is yet to reach dhone and this is the one that was supposed to cross us. After some 10 mts halt, was able to hear a loud honk of alcos and their chugging and lights started to come closely. It was diamond twins (Guntakal based WDG - 3A twins), powering the puny rake of 12 coaches.
.
Now the status of on time has gone to the status of "delayed by 20 minutes", and again I resumed my sleep. Again, I woke up when my train was stopped at kurnool. When I checked the time in my phone, it was 2215 hrs, so the delay increased from "20 mts" to "1hr20mts". Anyways i expected this to happen due to huge line up at the opposite direction is supposed to cross our train within our train reaches the third double line section we are supposed to witness, and expected to make up the lost time at Kacheguda, and started sleeping again.
.
Woke up for the third time, this time it was 0220 hrs when i woke up and opened the windows to find that my train has just arrived kacheguda with the delay of 40 mts, indicating it had recovered it's delay in third of four double line section this train passes. Surprising to see that there were some deboarding and boarding in this train even at this odd hours. Then, i continued my sleep again.
.
Woke up for the fourth and the last time, this time it was 0510 hrs, and anticipating that our train should have crossed atleast kamareddy by now, opened the window to find that our train has been looped at akanapet platform - 2. So the delay has been increased to 1h40m now. Then, started refreshing myself for the next day, brushed my teeth and heard a distant honk, indicating that it is some EMD hauling the train. As it slowly arrived at platform 1, i actually expected it to be Nanded - Tandur express, but train board indicated it as Krishna express. Now it is getting electric traction till its destination all the way from adilabad.
.
Our train started moving after Krishna express departed akanapet. Since I was travelling after long time in that section and that trains started plying on 17 km new railway line to medak, I was eager to see the bifurcation of line to medak from akanapet, even at those cold dark hours, went to the free left sided window and when i saw, the Kacheguda bound morning passenger train from medak with Guntakal based WDG - 3A in long hood front, was patiently waiting for our train to clear the line to enter the akanapet.
.
Our train eventually started gaining speed once we departed akanapet and slowly, the sun started appearing for the day. Maintained at full speed till we arrived kamareddy platform 2 at 0600 hrs, which is a mainline platform, expected a quick takeoff during departure.Now delay of our train has become 2 hrs. Our train made a slow and a steady departure, though being in mainline platform, and the platform 1 and nearby sick line has been occupied by the goods train, facing towards nizamabad, hauled by gooty based EMDs. Slowly picked up speed and again decelerated this time, and got looped at uppalavai this time. Checked WIMT app to find that the legend of this route, the Ajanta Express is supposed to cross us at anytime and the weekly visakhapatnam from sainagar shirdi is also closely following us.
.
Heard a loud honk, suggestive of ALCO locomotive, negotiating the upgrade towards uppalavai and made a quick entry with ajanta express, skipped at a very good speed. Moula ali based WDG - 3A twins was hauling it. No signs of departure even after ajanta express crossed us. Checked WIMT again to find that the weekly visakhapatnam could cross us at anytime now. This time, a shrill loud honk, and Moula ali based WDG - 3A twins was powering it, and it was sprinting through uppalavai towards its next scheduled halt at kamareddy. After it departed, our train got starter and entered the mainline. Witnessed the beautiful ghat like section that's present between uppalavai - sirnapalli section of Kamareddy - Nizamabad section, lush green forest, chill morning and speed restriction of 80kmph, this time as an extra addition could see electrical poles with wires. Yes, travelled in this section last time when only till medchal these were found.
.
After crossing sirnapalli, our train picked up speed and maintained the MPS, till our train reached dichpalli, the station before nizamabad, and it is a crossing station, and as usual, our train was looped. After some 15 - 20 minutes, Gooty based WDG - 4 twins made a very slow and casual entry with BOXN rakes, entered dichpalli, and we were given starter after a long wait at dichpalli. Arrived nizamabad at platform - 1 around 0810 hrs, now delay increasing to 3 hours. Got down to get some snacks this time, and suddenly our train was given starter, for less than 2 minutes that it halted there. immediately boarded the nearby coach and went to my berth.
.
As our train departed nizamabad, saw some WAG - 5 twins parked in station outers towards mudkhed side, was kind of surprise for me. Last time when i travelled in this section, it was pole free and diesels were dominating this section. Our train picked up MPS and skipped jankampet in a very good speed. Maintained good speed till basar and skipped basar at MPS, till where the electrification works were done when I was travelling, after that, it was a pole free zone, with just the foundation works complete. Crossed the state border and entered Maharashtra, and our train arrived Dharmabad within 30 mts of departing nizamabad, and made a short halt for a minute at platform 1 and departed.
.
As I was heading to Sambhaji Nagar / Aurangabad, before booking, I checked the arrival/departure status at Nanded for a sequence of 4 weeks, indicating that maximum it reaches with a delay of 90 minutes, thought that if not for sachkhand, atleast I can manage to catch the tapovan express to Sambhaji Nagar. So, with the current pace of the train, thought that atleast we could be able to reach Nanded by 0930 hrs and atleast could able to catch Tapovan, and checked for current availability between NED and AWB. since there was no availability in 2S, booked in ACC.
.
After Dharmabad, our train picked up speed and maintained MPS, and slowed down, again this time was looped at karkheli, a station devoid of electric poles at that time, now fully under wires. Waited for 10 minutes and a gooty based EMD twins made entry with BCNA rakes at a decent to good speed. After this crossed, starter was given and we depart karkheli.
.
After giving way for so many trains right from Bogolu, this time, after departing, we maintained good pace till mudkhed outers, anyway after mudkhed it is double line till its only reversal point. I still had the hope to catch Tapovan by now. I went to the left side window and enjoyed our long train, hauled by ALCo twins, beautifully negotiating the huge curve before we enter the mudkhed junction. As we enter, i could see that even the wiring was completed towards adilabad side, and poles were laid in pole pits when i travelled.
.
Unusually, our train made entry into platform - 4 of mudkhed at 0930 hrs, late by 2h40m as of now, taking much loops from the mainline, though the platform 1, 2 was free, this made me to wonder why. Some good amount of deboarding and boarding I was able to see at mudkhed for this train. Some LHB rake was parked at sick line and UBL based WDG - 4D and WDG - 4 was sleeping at platform - 3. After a brief halt of 5 mins, our train departed mudkhed, entered main line after taking multiple loops again, now entering the fourth double line section among 4 double line section that our train supposed to pass through. Slowly, the hope of catching tapovan express started fading away, but still had some hope to catch it.
.
As we enter the mainline, our train starts chugging, as at the home signal in the opposite line, Kalyan based WDP - 4D cab 2 faced, with shining new LHB coaches of devagiri express, was waiting for us to give way for it to enter mudkhed. Sleeper class and unreserved was way much overcrowded. Many coaches had markings of ER. As we crossed it, we maintained MPS of 110 kmph, once we neared Nanded city limits, we started slowing down and as we approach maltekdi, one of the station in Nanded suburbs, our train halted. It was 8 minutes to 10 hrs, and still I had the same 8 minutes to catch Tapovan express, and it is just 3 kms from maltekdi to Nanded.
.
Did I reach Nanded within 10 hrs? Did I catch the tapovan express to Sambhaji Nagar? Stay tuned for the final part.
.
Thanks for reading it patiently.
.
For part - 4, the sequel : /blog/post/5969328

Translate to English
Translate to Hindi

More Posts
0
updating ...
6 wishes
Happy Journey HJ మీ ప్రయాణం ఆహ్లాదకరంగా సాగాలని కోరుకుంటున్నాను உங்கள் பயணம் இனிதே அமைய வாழ்த்துக்கள் शुभ यात्रा शुभ यात्रा
🥳🥳🥳 It's A Long Journeys/Trips In This Plan...!!!! Note :--- This Train Is Diverted From KPD - Katpadi Jn. To GY - Gooty Jn. Diverted Via CTO, PAK, MPL, DMM, ATP, GY.....!!!! Onboard In 🤩 09519 - MDU OKHA Express Special From MDU - Madurai Jn. To OKHA - Okha Next Train :--- Depends On This Train Delay..!!!! 🥳🥳🥳

280 Posts

FmtBlog
27051 views
0

Dec 16 2023 (09:21)
MeghaSyam^~
MeghaSyam^~   149028 blog posts
Re# 5911515-281            Tags  

2 pics

@MUE   3h 49m late
@MUE: Mudkhed Jn &1 km/h Now ✅
Translate to English
Translate to Hindi

FmtBlog
28801 views
0

Dec 16 2023 (09:22)
MeghaSyam^~
MeghaSyam^~   149028 blog posts
Re# 5911515-282            Tags  

10 pics

@MUE   3h 50m late
@MUE: Mudkhed Jn &0 km/h Locos Resting Here ✅
Translate to English
Translate to Hindi

FmtBlog
22106 views
0

Dec 16 2023 (09:22)
MeghaSyam^~
MeghaSyam^~   149028 blog posts
Re# 5911515-283            Tags  
@MUE   3h 50m late
@MUE: Mudkhed Jn &4 km/h Started ✅
Translate to English
Translate to Hindi

FmtBlog
32037 views
0

Dec 16 2023 (09:24)
MeghaSyam^~
MeghaSyam^~   149028 blog posts
Re# 5911515-284            Tags  

14 pics

1 km from @MUE   3h 52m late
@MUE: Mudkhed Jn &26 km/h Leaving - 25 Kmph Joining In Main Line And Gaining Speed ✅
Translate to English
Translate to Hindi

FmtBlog
32519 views
0

Dec 16 2023 (09:26)
MeghaSyam^~
MeghaSyam^~   149028 blog posts
Re# 5911515-285            Tags  

10 pics

@MUE 3 km <--> 6 km @MGC   3h 51m late
@MUE: Mudkhed Jn &98 km/h 100 Kmph Poles Here ✅
Translate to English
Translate to Hindi

More Posts
0
updating ...
3 wishes
உங்கள் பயணம் இனிதே அமைய வாழ்த்துக்கள் शुभ यात्रा Happy Journey
After having a splendid darshan at Shirdi returning back to Hyderabad. Taking The SaiNagar Shirdi - Tirupati Weekly Express.

92 Posts

FmtBlog
35192 views
0

Nov 16 2023 (04:26)
DrSwaroop^~
DrSwaroop^~   109697 blog posts
Re# 5882781-93            Tags  
1 km from @MUE   32m late
@MUE: Mudkhed Jn &30 km/h Slowly Skipping Mudkhed Jn.
Translate to English
Translate to Hindi

FmtBlog
35299 views
0

Nov 16 2023 (04:28)
DrSwaroop^~
DrSwaroop^~   109697 blog posts
Re# 5882781-94            Tags  
@MUE 2 km <--> 4 km @SVN   32m late
@MUE: Mudkhed Jn &39 km/h Line towards Adilabad deviates.
Translate to English
Translate to Hindi

FmtBlog
35161 views
0

Nov 16 2023 (04:29)
DrSwaroop^~
DrSwaroop^~   109697 blog posts
Re# 5882781-95            Tags  
@MUE 2 km <--> 4 km @SVN   33m late
@MUE: Mudkhed Jn &43 km/h We take the line towards Nizamabad Jn.
Translate to English
Translate to Hindi

FmtBlog
35540 views
0

Nov 16 2023 (04:29)
DrSwaroop^~
DrSwaroop^~   109697 blog posts
Re# 5882781-96            Tags  
@MUE 2 km <--> 4 km @SVN   32m late
@MUE: Mudkhed Jn &44 km/h Into SCR Hyderabad Division now.
Translate to English
Translate to Hindi

FmtBlog
35780 views
0

Nov 16 2023 (04:30)
DrSwaroop^~
DrSwaroop^~   109697 blog posts
Re# 5882781-97            Tags  
@MUE 3 km <--> 3 km @SVN   33m late
@MUE: Mudkhed Jn &47 km/h Into 110Kmph MPS stretch now.
Translate to English
Translate to Hindi

More Posts
Info Update
588962 views
8

Oct 01 2023 (11:52)   07053/Kacheguda - Lalgarh Special Fare Special | BKN/Bikaner Junction (6 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   652 blog posts
Entry# 5836837            Tags   Past Edits
1 compliments
Useful
Railways should extend this train 07053/54 Bikaner Kacheguda Express upto Tirupati because this will provide a straight connection to Tirupati station from Bikaner and by following route of Andhra Pradesh Sampark Kranti this train can run upto Tirupati from Kacheguda and primary maintenance of train should be done at Tirupati and secondary maintenence should be done at Lalgarh or Bikaner jn.
Translate to English
Translate to Hindi

More Posts
Info Update
87319 views
1

Oct 14 2023 (17:12)   MUE/Mudkhed Junction (4 PFs)
hrid22~
hrid22~   11748 blog posts
Entry# 5852709            Tags   Past Edits
#Admin #Moderator Source Drm Ned X Handle
After carrying out extensive work on the 20 Km stretch, the speed on the Adilabad- Pimpalkhutti section could be increased from 50 to 100Kmph, thus removing a major operational constraint. SCR HQ recently conveyed the sanction to Nanded Division @RailMinIndia @SCRailwayIndia
Translate to English
Translate to Hindi
Page#    Showing 6 to 10 of 172 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy