Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Dec 4, 2016 23:55:52 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Dec 4, 2016 23:55:52 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search

GAI/Gauchhari (3 PFs)
گوچھاري     गौछारी

Track: Construction - Double-Line Electrification

NH31,Dist:-Khagaria,Gauchhari
State: Bihar

Elevation: 40 m above sea level
Zone: ECR/East Central   Division: Sonpur
No Recent News for GAI/Gauchhari
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 8
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 5.0/5 (15 votes)
cleanliness - excellent (2)
porters/escalators - excellent (1)
food - excellent (2)
transportation - excellent (2)
lodging - excellent (2)
railfanning - excellent (2)
sightseeing - excellent (2)
safety - excellent (2)
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 2 of 2 blog entries  
  
General Travel
0 Followers
2016 views

Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
Oct 02 2015 (10:09PM)   15909/Avadh Assam Express | GAI/Gauchhari (3 PFs)
 

mksald123   413 blog posts
Entry# 1606296            Tags   Past Edits
On 19 Nov 2014, I took train Avadh Assam exp from Old Delhi to New Jalpaiguri via Bareilly, Lucknow, Gonda, Gorakhpur, Siwan, Chhapra, Hajipur, Mujaffarpur, Barauni, Mansi, Katihar. The same train I had boarded 05 years back for official visit to New Jalpaiguri. That time the entire track from barabanki to Katihar was 100% single and 100% unelectrified. I was very glad to see this time that the stretch from Barabanki to Hajipur including Sonpur - Hajipur Gandak bridge was 100% doubled and 95% electrified and till today, I hope that the rest 5% electrification work would have also completed. The stretch between Hajipur to Muzaffarpur was single for 45 Kms but 100% electrified too. The stretch from Muzaffarpur to Mansi was again 100% doubled and 100% electrified. My train was only 45 minutes late till Mansi. The winter season had just approached and as my seat was side lower...
more...
in right side of my S7 Coach and diwali and chat puja had passed on 23 and 29 Oct. So there was no rush in my compartment, I was alone sitting or lying at my berth. As usual, I had Several maps of my journey route which I make before proceeding on my journey. The map contained all halts, small, medium and big stations name with Km distance between them. I didn't sleep for the entire distance between Lucknow to Katihar and just amazingly marking in my map the huge progress of Indian railways in 100% doubling and electrifying such a huge distance of more than 800 Kms in 04 years. I was thinking now the lifeline of the nation is finally changing its reputation. The train having only 45 minutes late after 20 hours of journey in UP and Bihar was making me feel awesome. But my feeling was shattered when the train left Mansi, a large no. of local passengers without or general class ticket boarded and sat forcefully on our seats. The Chain pulling was done 02 to 03 places. In spite of this I was concentrated on my work of marking on my map about the progress. Surprising I found , the stretch from Maheshkhunt to Thanabihpur was only 20% doubled as when I was watching through my window in right side, there was no other line there. The train was halted for 20 minutes at a Gauchhari small station for crossing another train from opp direction. Also the progress of electrification work was only 50% between Mansi and Thana bihpur. After Thana bihpur to Katihar again the tracks were 100% doubled except 01 km stretch on river kosi between katrea and kursela and 100% electrified too. But my happy journey had not remained happy as my train had delayed by 03 hours upto Katihar. My name is again being forwarded for recruiting youths at New Jalpaiguri in November this year. As Preferred route reservation to New Jalpaiguri is given by our office via this train only, but I prefer Brahmaputra Mail via Bhagalpur as my mama resides there, can anybody tell me whether situation has changed with any progress in the Mansi Katihar route.
  
General Travel
1 Followers
2268 views

Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
May 13 2013 (5:59PM)   55538/Samastipur - Katihar Passenger (UnReserved) | GAI/Gauchhari (3 PFs)
 

Pained to know Boeing 777 landcrashed   22926 blog posts   21085 correct pred (67% accurate)
Entry# 751674            Tags   Past Edits
Great Move by East Central Rly....Khagaria-Naugacchia Section is now fully doubled....but for precaution its operated as Single Line Section b/w Mansi Jn-Thanabihpur Jn. As a result 12423 DBRT Rajdhani has crossed Narayanpur @ 17:45...the 55538 Dn Samastipur KIR Passenger is alreaddy loop lined 3 stations before i.e.,Gauchhari..Now it'll keep on standing there till Rajdhani crosses...Shameless decision by the controllers...Immediately transfer the KIR-BJU Section either to NFR/ER....Traffic will be as smooth as the Sahibgunj Loop Line Section..These DyC's are totally non-qualified.

1 posts - Mon May 13, 2013

  
2127 views

Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
May 13 2013 (6:08PM)
Pained to know Boeing 777 landcrashed   22926 blog posts   21085 correct pred (67% accurate)
Re# 751674-2            Tags   Past Edits
No I'm following 15483 Mahananda Exp & went through this situation just now...same fate for Mahananda too...its already running 23 Hrs late...still 40 mts before running 13164 Hatey Bazarey Exp is given more preference in crossing that too in Double Line Section...I'm totally mesmerished with the whole system...All seem to be Pawan Bansal's nephew

  
2104 views

Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
May 13 2013 (6:11PM)
Pained to know Boeing 777 landcrashed   22926 blog posts   21085 correct pred (67% accurate)
Re# 751674-3            Tags   Past Edits
When all the trains are running @ an avg 45-60 kmph b/w MNE-NNA...How is RAjdhani running @ constant 100 kmph...?? Smells fishy :P

  
2094 views

Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
May 13 2013 (6:11PM)
MKS*^~   18638 blog posts   1797 correct pred (78% accurate)
Re# 751674-4            Tags   Past Edits
sab golmaal hai bhai..ECR bhi kisise kam nahi hai trains delay krne mein...

  
2093 views

Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
May 13 2013 (6:13PM)
MKS*^~   18638 blog posts   1797 correct pred (78% accurate)
Re# 751674-5            Tags   Past Edits
The current senario of Mahananda is only because of controllers of ECR & NCR...God knows when it will run on time.

  
2092 views

Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
May 13 2013 (6:16PM)
Pained to know Boeing 777 landcrashed   22926 blog posts   21085 correct pred (67% accurate)
Re# 751674-6            Tags   Past Edits
I know when a train is 23 Hrs late...it'll get less priority..but whats the point in giving crossing to a train which is before time..??? That too Hatey Bazarey is not that popular...runs half empty all through the year
Page#    Showing 1 to 2 of 2 blog entries  

Scroll to Top
Scroll to Bottom


Go to Mobile site