Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Jun 24, 2017 09:16:56 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Jun 24, 2017 09:16:56 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1501238-0
Details Edit
Large Station Board;
Entry# 1501238-0

ATS/Attabira (1 PFs)
ଅତାବିରା     अताबिरा

Track: Construction - Single-Line Electrification

Pahadsigida Road, Attabira, Dist - Bargarh 768027
State: Odisha

Elevation: 162 m above sea level
Zone: ECoR/East Coast   Division: Sambalpur
No Recent News for ATS/Attabira
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 1
Number of Halting Trains: 12
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: /5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Nearby Stations

GBQ/Godbhaga 8 km     HKG/Hirakud 17 km     BRGA/Bargarh Road 18 km     SBP/Sambalpur Junction 25 km     SBPD/Sambalpur Road 26 km     SBPY/Sambalpur City 30 km     SLRA/Sarla Junction 32 km     BRPL/Barpali 37 km     SSN/Sason 38 km     MANE/Maneswar 39 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 6 blog entries  next>>
  
Info Update
0 Followers
6456 views
May 29 2016 (12:33)   12755/Nagavali Express | ATS/Attabira (1 PFs)
 

Guest: 7131ce16   show all posts
Entry# 1869394            Tags   Past Edits
attabira-bargarh dist odhisa
paxs demanding stoppage of yeswanthpur exp and nagavali exp

  
6218 views
May 29 2016 (12:46)
Guest: 7131ce16   show all posts
Re# 1869394-1            Tags   Past Edits
bargarh is just 18kms may be some huge dmeand

  
6236 views
May 29 2016 (16:11)
utkal andhra~   780 blog posts
Re# 1869394-2            Tags   Past Edits
there are south indian people in good number in the area .The halt will be very useful to the railways.
  
General Travel
0 Followers
2286 views
Dec 25 2016 (12:27)   SWD/Sanawad (1 PFs)

Abhishek Malakar~   153 blog posts
Entry# 2104233            Tags   Past Edits
Old memories
25.12.12
  
★  Info Update
0 Followers
1455 views
Jun 06 2015 (08:04)   ATS/Attabira (1 PFs)
 

Pp*^~   4190 blog posts   124 correct pred (79% accurate)
Entry# 1501238            Tags   Past Edits
Attabira Station.

  
1297 views
Jun 06 2015 (08:33)
Afraaz suhail 🚂🚄🚅~   4255 blog posts   573 correct pred (87% accurate)
Re# 1501238-1            Tags   Past Edits
Bful

  
1180 views
Jun 06 2015 (11:08)
यन्त्रविन्यासYantravinyas   19804 blog posts   427 correct pred (89% accurate)
Re# 1501238-2            Tags   Past Edits
beautiful small station in odisha
  
★  General Travel
2 Followers
40979 views
Dec 04 2014 (09:43)   12844/Ahmedabad - Puri SF Express | SC/Secunderabad Junction (10 PFs)
 

AAA   369 blog posts
Entry# 1295842            Tags   Past Edits
The following lines should be given priority in the coming Budget by either allocating funds or through PPP
i)PAP - CCT/COA - KLPH - NS (Proivdes an alternative route to BZA to the already congested route Via SLO, RJY & EE)
ii)KVR - BDCR (By doing so RJY/KVR & BDCR will become big Junctions like SC, WL/KZJ, GTL, BZA, RU & VSKP and also it reduces the distance from RJY/COA/VSKP to SC,NDLS,LTT, SNSI etc)
iii)NDKD
...
more...
- KHT (Asmentioned by Siva Rama Krishnan it is all weather route through backward areas)
iv) PDPL - KRMR - NZB
v) KYOP - MOB
v) NDL - YA
vi) GNPR - THV(RGDA) : Provides a direct link from NWP - PLH - GNPR - RGDA (Instead of circuitous Via (CHE, CPP, VZM, VBL, RGDA)
vii) Quadrupling and Electrification of BN - SC
viii) Third line from GPT - VSKP

4 posts - Thu Dec 04, 2014

2 posts - Fri Dec 05, 2014

4 posts - Sat Dec 06, 2014

8 posts - Sun Dec 07, 2014

7 posts - Mon Dec 08, 2014

2 posts - Tue Dec 09, 2014

  
22495 views
Dec 09 2014 (14:27)
AAA   369 blog posts
Re# 1295842-28            Tags   Past Edits
Leta line be laid first and then at latter point of time we can think of doubling

  
22488 views
Dec 09 2014 (15:19)
ysk.6669   152 blog posts
Re# 1295842-29            Tags   Past Edits
If the line isn't a double line, a train may end up taking the same time as on the existing route. That was why I was talking about a double line.
Thk u.

  
22324 views
Dec 09 2014 (22:32)
AAA   369 blog posts
Re# 1295842-30            Tags   Past Edits
Let a single line be laid first .. BDCR will come into mainline and Sree Seetha Ramachandra Swamy shrines which is known only to few people will become one the famous temples in India and more trains can be started from BZA, GNT & MTM. Many lines are laid even though ROI is very less the best eg was JAT - UHP - SINA - BRML Line and few lines in North East. It is only for connectivity not Revenue/Profit. That too Khammam Dist in Telangana is one of the most backward Dists.

  
21041 views
Dec 24 2014 (09:49)
Venkat వెంకట్~   13683 blog posts   13 correct pred (87% accurate)
Re# 1295842-31            Tags   Past Edits
Kovvur-Kothhagudam line planned on planes only...No issues for speed.

  
34817 views
Dec 26 2014 (14:35)
Aditya~   2030 blog posts   170 correct pred (68% accurate)
Re# 1295842-32            Tags   Past Edits
  
Info Update
0 Followers
8288 views
Aug 28 2014 (15:20)   18301/Sambalpur - Rayagada Intercity Express (UnReserved) | SBP/Sambalpur Junction (3 PFs)
 

gsmishradmrc   207 blog posts   253 correct pred (57% accurate)
Entry# 1200139            Tags   Past Edits
SBP (d) : 06.00
BRGA (a/d) : 06.40/06.45
BLGR (a/d) : 07.45/07.50
TIG (a/d) : 08.30/08.40
RGDA (a) :
...
more...
13.00
Train slowed down by 10 mins. Avrg speed drops to 46.

  
8151 views
Aug 29 2014 (21:07)
AAA   369 blog posts
Re# 1200139-1            Tags   Past Edits
Train # 18301 & Train # 18511 should have RSA and should be clubbed together. 18301 should be extended to VSKP and from VSKP it should proceed to KRPU as 18512 similarly 18511 after reaching VSKP should proceed towards SBP as 18302. But before that Train # 18511 should be made daily and RSA with 18411 should be removed.
Page#    Showing 1 to 5 of 6 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.