Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jun 29, 2017 09:31:15 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jun 29, 2017 09:31:15 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1474142-0
Details Edit
Front Entrance - Outside; Large Station Board;
Entry# 2251228-0
Details Edit
Front Entrance - Outside; Large Station Board;
Entry# 2251228-0

BGK/Bagalkot (3 PFs)
ಬಾಗಲಕೋಟೆ     बागलकोट

Track: Single Diesel-Line

State Highway 20, Bagalkot
State: Karnataka

Elevation: 542 m above sea level
Zone: SWR/South Western   Division: Hubballi (Hubli)
No Recent News for BGK/Bagalkot
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 24
Number of Originating Trains: 1
Number of Terminating Trains: 1
Rating: /5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Nearby Stations

MGL/Mugalolli H 8 km     SIKI/Sulikeri 9 km     GED/Guledagudda Road 13 km     KLM/Kadlimatti 13 km     KKMI/Kerakalamatti 16 km     JRKT/Jadramakunti 20 km     HESK/Hire-Shellikeri 21 km     SII/Sitimani 25 km     BDM/Badami 27 km     KSAR/Kudala Sangam Road 30 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 45 blog entries  next>>
  
★★  Rail Fanning
0 Followers
837 views
Apr 26 2017 (12:54)   BGK/Bagalkot (3 PFs)

Foamer~   1903 blog posts
Entry# 2251228            Tags   Past Edits
Bagalkot station and the official board giving details of SWR projects.
-
Source : Self.
  
★★★  Info Update
0 Followers
2310 views
Apr 26 2017 (12:15)   KJDI/Khajjidoni (1 PFs) | PUNE/WDG-4D/70588

Foamer~   1903 blog posts
Entry# 2251173            Tags   Past Edits
Bagalkot - Kudachi new Line.
-
New Station: Khajjidoni.
-
When one sees the the rail map of Karnataka sans the red lines, it shows enormous gaps. So under developed is Karnataka in terms of
...
more...
rail network.
Slowly some progress is going on. One such demand and wait for decades for connectivity is in North Karnataka, Bagalkot district.
The Bagalkot-Kudachi line will connect the Gadag-Solapur line to Hubballi-Miraj line.
Having anticipated for some news about the line progress in media and also from others, I just couldn't hold back my curiosity and eagerness to know the line progress. So on Monday evening, I just set off on a 1000+ Kms sojourn to see first-hand what progress the line has made.
-
Hope other railfans waiting for this info are enthused :)
-
-
Pic 1, 3 : Distant view of the lonely PF station.
Pic 2 : Goods EMD which has hauled a Ballast train, parked on the mainline.
Pic 4, 5: The loco is chocked.
Pic 6, 7: Distance marker.
Pic 8: Tipper gets loaded from ballast train.
Pic 9, 10: Lonely tree and flower patch amidst barren land seen from station.
Pic 11: Small station building.
Pic 12-16: 2 RuBs located under the PF. This is the 2nd time I am noticing RuB under PF. The other instance was in Yediyuru - /blog/post/2123749. But here there are 2 RuBs underneath.
Pic 17: Towards Hireshellikeri.
Pic 18: PF line joining mainline.
Pic 19: Lonely wagon at the end of the line.
Pic 20, 21: End of line towards Kudachi.
Pic 22: Land leveling towards Kudachi.
Pic 23: Another newly painted RuB, while coming towards Hireshellikeri.
.
-
Station Info:
Name: Khajjidoni.
No. of PFs: 1 and one Mainline.
Division: UBL.
Zone: SWR.
Address: Khajjidoni village, Bagalkot Taluk, Bagalkot District, Karnataka - 587204.
-
Line Info:
1. Some 30 Kms of the line is completed from Bagalkot.
2. Final Ballast packing has started at Sulikeri end and will complete till here in another week or 10 days.
3. Painting of station has completed at Sulikeri. Other 2 stations and this stations' will be done soon. RuBs and the height barriers were painted last week.
4. Tiling - the jigsaw type tiles work is completed partially and will be done soon.
5. As always in a new line, no signals or automatic track switching. Just one train system and manual switching of tracks.
6. Further land levelling is in progress.
-
The stations list from Bagalkot side.
-
1. Sulikeri.
2. Kerakalamatti.
3. Hireshellikeri.
4. Khajjidoni.
-
P.S.:
1. The above info is whatever I could gather and assess to the best of my ability.
2. Can someone type Hindi name TL for this station? I am unable to type address TL, till the Hindi name is filled. I would like to do address TL :)
-

5 posts - Wed Apr 26, 2017

5 posts are hidden.

  
1596 views
Apr 26 2017 (14:39)
SWR 6th cleanest zone in IR~   4260 blog posts   319 correct pred (69% accurate)
Re# 2251173-18            Tags   Past Edits
Nice pics

  
1489 views
Apr 26 2017 (14:59)
knkprasad956*^~   2251 blog posts
Re# 2251173-19            Tags   Past Edits
A great effort. Thanks for updates

  
1513 views
Apr 26 2017 (15:10)
Foamer~   1903 blog posts
Re# 2251173-20            Tags   Past Edits
Thanks for the appreciation sir.

  
★  
1330 views
Apr 26 2017 (16:22)
Foamer~   1903 blog posts
Re# 2251173-21            Tags   Past Edits
Something I learnt yesterday. The rails seen on the slope are used for laying rails.
-
First the track bed is readied, some ballast is spread and these "short" rails are fitted to the sleeper. And then the track machine comes using these rails to bring the long rails and they replace these rails and then the long rails are welded. These short ones are next used where new track is to be laid.
-

  
1345 views
Apr 26 2017 (16:23)
Gopal*^   13895 blog posts   58560 correct pred (81% accurate)
Re# 2251173-22            Tags   Past Edits
Nice set of pictures,Karthik.
Thanks
  
General Travel
0 Followers
705 views
Mar 23 2017 (18:18)   BGK/Bagalkot (3 PFs)

Railway fan from HPT ಹೊಸಪೇಟೆ~   195 blog posts
Entry# 2208150            Tags   Past Edits
Rayadurga-Kadiridevarapalli, Bagalkot-Kajjidoni and Ginigera-Chikkabenakal sections to open soon. Pc - Mr santosh From FB
  
★  Rail Fanning
0 Followers
6389 views
Jun 03 2016 (10:18)   16536/Gol Gumbaz Express | MVD/Mulvad (1 PFs)
 

SWR 6th cleanest zone in IR~   4260 blog posts   319 correct pred (69% accurate)
Entry# 1877797            Tags   Past Edits
Part of Gadag - Hotgi doubling update.. earth work on full pace near mulvad

  
6181 views
Jun 03 2016 (14:36)
knkprasad956*^~   2251 blog posts
Re# 1877797-1            Tags   Past Edits
Thanks for updates
  
★  Rail Fanning
0 Followers
1551 views
Oct 31 2014 (09:58)   BGK/Bagalkot (3 PFs)
 

KYN WAP7 🚄 🚃 🚃 🚃 🚃 🚃*^~   5523 blog posts   1509 correct pred (75% accurate)
Entry# 1262481            Tags   Past Edits
MLY Jumbo WDM2 Waiting fr clearance orangee orange MLY TWIN WDM2s with Jindal steel rakes.... At Bagalkot... ⌒.⌒ raj —

  
1281 views
Nov 01 2014 (13:32)
KYN WAP7 🚄 🚃 🚃 🚃 🚃 🚃*^~   5523 blog posts   1509 correct pred (75% accurate)
Re# 1262481-1            Tags   Past Edits
one more different angle shot.

  
1250 views
Nov 01 2014 (18:27)
sys tem~   8224 blog posts   75729 correct pred (76% accurate)
Re# 1262481-2            Tags   Past Edits
Maula Ali ke loco ka dabdaba poore south India + Maharashtra me chaya rehta hai ...
Page#    Showing 1 to 5 of 45 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.