Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jun 26, 2017 02:47:04 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jun 26, 2017 02:47:04 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 580241-0
Details Edit
Large Station Board;
Entry# 2287185-0
Details Edit
Medium; Platform Pic;
Entry# 2287185-0
Details Edit
Platform Pic; Large Station Board;
Entry# 2204066-0

BSX/Basar (2 PFs)
బాసర్ / باسر     बासर

Track: Single Diesel-Line

Basar, Dist Nirmal
State: Telangana

Elevation: 344 m above sea level
Zone: SCR/South Central   Division: Hyderabad Deccan Nampally
No Recent News for BSX/Basar
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 40
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 4.8/5 (24 votes)
cleanliness - excellent (3)
porters/escalators - excellent (3)
food - good (3)
transportation - excellent (3)
lodging - excellent (3)
railfanning - excellent (3)
sightseeing - excellent (3)
safety - excellent (3)

Nearby Stations

FKB/Fakrabad 8 km     DAB/Dharmabad 10 km     NVT/Navipet 15 km     SQE/Samarala Halt 16 km     CIKA/Chikna 21 km     JKM/Jankampet Junction 23 km     KEK/Karkheli 24 km     NZB/Nizamabad Junction 29 km     BLSA/Bolsa 31 km     YDP/Yedapalli 35 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 33 blog entries  next>>
  
★★  General Travel
0 Followers
14283 views
Dec 29 2016 (15:41)   51421/Pune - Nizamabad Passenger | NZB/Nizamabad Junction (3 PFs) | GY/WDP-4D/40121

Rizwan NZB Jn~   278 blog posts   1 correct pred (50% accurate)
Entry# 2109363            Tags   Past Edits
NZB-KCG Demu hauls from PF3 and gets ready to depart as the KCG-NZB Demu arrives at PF2. While the loco is reversed for the just arrived Pune-NZB Passenger at PF1 which is also getting ready for the rake sharing with NZB-Pandarpur Passenger which departs at the same time but in opposite direction of NZB-KCG.
  
★★  General Travel
0 Followers
2574 views
Apr 17 2017 (14:47)   17058/Devagiri Express (PT) | BSX/Basar (2 PFs) | UBL/WDG-4D/70481

Guest: 7fe41000   show all posts
Entry# 2239327            Tags   Past Edits
17058/Secunderabad-Mumbai CST Devgiri Express at Basar with 70481 WDG4-D UBL loco. #TB #trainboard

  
1072 views
Jun 07 2017 (00:44)
Guest: 7fe40769   show all posts
Re# 2239327-1            Tags   Past Edits
Update as #TB #Trainboard .....

  
949 views
Jun 07 2017 (07:08)
उत्तर पश्चिम रेलवे NWR^~   6085 blog posts   342 correct pred (54% accurate)
Re# 2239327-2            Tags   Past Edits

  
861 views
Jun 07 2017 (07:40)
Guest: 7fe53c22   show all posts
Re# 2239327-3            Tags   Past Edits
Yes
  
Pic Upload
0 Followers
676 views
May 22 2017 (10:41)   BSX/Basar (2 PFs)

Guest: 3b230c64   show all posts
Entry# 2287185            Tags   Past Edits
#SB Pics of Basar railway station...

  
321 views
Jun 07 2017 (00:48)
Guest: 7fe40769   show all posts
Re# 2287185-1            Tags   Past Edits
  
Social
0 Followers
15274 views
Mar 21 2017 (16:44)   NZB/Nizamabad Junction (3 PFs)

Rizwan NZB Jn~   278 blog posts   1 correct pred (50% accurate)
Entry# 2205368            Tags   Past Edits
Look how dramatic it is, let's name it as the Golden Ellipse as these stations shall play a vital role between CR and SCR once the proposed lines and other pending projects gets completed. Bodhan-Bidar line (in dotted brown) which is pending to be commissioned would be boon connecting the either sides. Though it may take a lot of time but the future of these stations will make an economical impact in the development of this region.

3 posts - Wed May 24, 2017

2 posts - Thu May 25, 2017

  
4678 views
May 26 2017 (01:14)
22691 Making of an AC Exp*^~   2248 blog posts   9 correct pred (90% accurate)
Re# 2205368-6            Tags   Past Edits
Do you know the distance of the LTRR - GR line?

  
4667 views
May 26 2017 (11:27)
skumarvkulkarni~   1684 blog posts
Re# 2205368-7            Tags   Past Edits
Gulbarga Latur distance would be arround 140 to 150Kms... instead of connecting to Latur road railway station Gulbarga-Latur new line should connect at Latur . And to answer your question Gulbarga to Latur road distance would 140+22Kms=162 Kms

  
4616 views
May 26 2017 (12:25)
jazzradio   27 blog posts
Re# 2205368-8            Tags   Past Edits
It's going to be Latur- Ausa- Nilanga- Omerga- Aland & Gulbarga, covering a distance of approx. 150 KMs

  
4639 views
May 26 2017 (12:37)
skumarvkulkarni~   1684 blog posts
Re# 2205368-9            Tags   Past Edits
The new Latur-Gulbarga line can branch out from Sultanpur station(new station on Bidar-Gulbarga new line). This can save additionally 10kms for entire Latur-Gulbarga new line construction...
The Latur-Gulbarga should go via
Gulbarga-Sultanpur(already line exist)
Sultanpur-Karnataka Central University (Kadaganchi)
Aland-
...
more...
Khajuri-Umerga
Umerga-Khillari- Ausa-Latur(If it goes via Nilanga it will be round about)

  
4603 views
May 26 2017 (13:08)
jazzradio   27 blog posts
Re# 2205368-10            Tags   Past Edits
I agree, but just a diversion of about 10-20 Kms can bring a Taluka place like Nilanga under a BG line and that can help the people.
If you are aware Usmanabad was no where on the Barshi- Latur narrow guage line, but when the new BG line was put, the route was diverted to cover Usmanabad.
As per MP Ravi Gaikwad, the proposed route is from Ausa- Kasarsirsi- Nilanga- Omerga- Aland, which I believe is being surveyed.
  
★  General Travel
0 Followers
14019 views
Feb 25 2017 (14:38)   NZB/Nizamabad Junction (3 PFs)

Rizwan NZB Jn~   278 blog posts   1 correct pred (50% accurate)
Entry# 2177898            Tags   Past Edits
#Nizamabad- #Karimnagar - #Peddapalli Line ready for operations.
SCR on Wednesday successfully completed the trial run of the Nizamabad-Morthad section of Peddapally-Nizamabad railway line and it took 30 minutes for the train to reach Morthad from Nizamabad, at a speed of upto 120 kmph. The 177KM Peddapally-Nizamabad rail line connecting Senunderabad-Manmad-Mumbai Line to Delhi-Chennai Main Line is now ready for operations as the 42 km stretch between Morthad and NZB was inspected for safety. There were already Demu services running between Morthad and Peddapalli.
click here

4 posts - Sat Feb 25, 2017

1 posts - Sun Feb 26, 2017

  
12341 views
Feb 26 2017 (21:45)
Rizwan NZB Jn~   278 blog posts   1 correct pred (50% accurate)
Re# 2177898-6            Tags   Past Edits
Bhai, Did you leave moderating on this forum ?

  
12388 views
Feb 26 2017 (22:08)
Guest: 3bcd365d   show all posts
Re# 2177898-7            Tags   Past Edits
Personal reasons

  
12346 views
Feb 27 2017 (00:07)
Old AP EXPRESS   142 blog posts   11 correct pred (89% accurate)
Re# 2177898-8            Tags   Past Edits
Great news..👌.the long wait is over..!

  
12322 views
Feb 27 2017 (11:11)
kmukya   45 blog posts
Re# 2177898-9            Tags   Past Edits
But what is the status of electrification ? I heard that they are also electrifying this link.

  
12192 views
Feb 27 2017 (21:16)
Rizwan NZB Jn~   278 blog posts   1 correct pred (50% accurate)
Re# 2177898-10            Tags   Past Edits
I am in Hyderabad for a week. Once I visit Nizamabad, I will notify you.
Page#    Showing 1 to 5 of 33 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.