Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jan 24, 2017 14:41:51 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jan 24, 2017 14:41:51 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Entry# 930901-0
Entry# 384672-0

BOY/Bhadohi (2 PFs)
بھدوہی     भदोही

Track: Double Electric-Line

Station Road, Bhadohi 221401
State: Uttar Pradesh

Elevation: 89 m above sea level
Zone: NR/Northern   Division: Lucknow Charbagh NR
No Recent News for BOY/Bhadohi
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 46
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 4.7/5 (32 votes)
cleanliness - excellent (4)
porters/escalators - good (4)
food - excellent (4)
transportation - excellent (4)
lodging - excellent (4)
railfanning - excellent (4)
sightseeing - excellent (4)
safety - good (4)

Nearby Stations

PRF/Parsipur 8 km     MOF/Mondh 9 km     SAW/Suriawan 16 km     KEH/Kapseti 16 km     SWPR/Sewapuri 21 km     SQN/Sarai Kansrai 26 km     CHH/Chaukhandi 28 km     JNH/Janghai Junction 31 km     LOT/Lohta 38 km     BYHA/Barya Ram 40 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 32 blog entries  next>>
  
Poll
0 Followers
2586 views
13 votes
Nov 09 2016 (13:56)   18631/Ranchi - Ajmer Garib Nawaz Express | BOY/Bhadohi (2 PFs) | TATA/WAG-7

indian railway~   987 blog posts   9 correct pred (70% accurate)
Entry# 2053723            Tags   Past Edits
IS TRAIN KO BSB BOY JNH ALD Route se jana chahiye kyuki BSB me reversal se bach jayega or time bhi bachega iska BSB me 50 min halt and it can go upto tundla with wappies no need of waggies whats ur opinion dear friends
yes it can be good route without reversal85%11
no reversal is best0%0
can't say about it15%2

  
2375 views
Nov 09 2016 (13:58)
🚉🚉गोरखपुर विद्युत लोको शेड🚎🚎~   1326 blog posts   183 correct pred (73% accurate)
Re# 2053723-1            Tags   Past Edits
Save the time as well as cover up the untouched areas

  
2289 views
Nov 09 2016 (15:29)
indian railway~   987 blog posts   9 correct pred (70% accurate)
Re# 2053723-2            Tags   Past Edits
yeah... right anil pls people vote for this poll

  
2275 views
Nov 09 2016 (16:42)
indian railway~   987 blog posts   9 correct pred (70% accurate)
Re# 2053723-3            Tags   Past Edits
jab ald jana hai to to bsb se train reverse kar kyu rahe hai jab line available hai phir bhi

  
2272 views
Nov 09 2016 (21:18)
🗼🌐 Indian Railway✒✒🎷~   288 blog posts   20 correct pred (66% accurate)
Re# 2053723-4            Tags   Past Edits
BSB se direct ALD routs available hone babjood fly via Mirzapur le ja Raha hai aur BSB me 40 min waste kar Raha hai

  
2284 views
Nov 09 2016 (21:39)
indian railway~   987 blog posts   9 correct pred (70% accurate)
Re# 2053723-5            Tags   Past Edits
HA WAHI ME BOL RAHA HU FALTU ME TRAIN KO REVERSE KARKE BSB SE MZP LEKE JA RAHE HAI MATLAB KUCH NHI PHIR BHI ISLIYE I SUGGEST YE TRAIN KO VIA BOY JNH ALD LEKE JAYE
  
General Travel
0 Followers
5115 views
Feb 02 2016 (01:23)   14207/Padmavat Express | BOY/Bhadohi (2 PFs)
 

Prakhar*^~   4164 blog posts   412 correct pred (82% accurate)
Entry# 1727108            Tags   Past Edits
14207/08 Padmavat Express could have easily extended to Badohi (BOY) had there been Maintaince facilities.
PBH-BOY = 84km only.
.
#make24coacher
  
Poll
0 Followers
788 views
10 votes
Oct 14 2016 (14:27)   BOY/Bhadohi (2 PFs)
 

indian railway~   987 blog posts   9 correct pred (70% accurate)
Entry# 2023144            Tags   Past Edits
kya 12165 ratnagiri sup. exp. ko daily karna chahiye
yes80%8
no0%0
can't say20%2
  
Rail Fanning
0 Followers
598 views
Oct 03 2016 (13:19)   BOY/Bhadohi (2 PFs)
 

indian railway~   987 blog posts   9 correct pred (70% accurate)
Entry# 2009812            Tags   Past Edits
whats is progress of varanasi allahabad via bhadohi dubling of electrification ?????
  
Poll
0 Followers
911 views
1 votes
Sep 09 2016 (21:45)   BOY/Bhadohi (2 PFs)
 

indian railway~   987 blog posts   9 correct pred (70% accurate)
Entry# 1986396            Tags   Past Edits
which station is best in Allahabad Varanasi via (janghai) section ???
(A). JANGHAI JUNCTION (B). BHADOHI (C). PRAYAG (D). PHUPUR100%1

  
896 views
Sep 09 2016 (21:50)
🚉🚉गोरखपुर विद्युत लोको शेड🚎🚎~   1326 blog posts   183 correct pred (73% accurate)
Re# 1986396-1            Tags   Past Edits
Where is Phupur Station?

  
887 views
Sep 09 2016 (22:05)
indian railway~   987 blog posts   9 correct pred (70% accurate)
Re# 1986396-2            Tags   Past Edits
PHULPUR
  
General Travel
0 Followers
1448 views
Sep 09 2016 (16:47)   BOY/Bhadohi (2 PFs)
 

indian railway~   987 blog posts   9 correct pred (70% accurate)
Entry# 1986037            Tags   Past Edits
12165/6 ratnagiri exp. train is running with electric engine or not can anybody know

11 posts - Fri Sep 09, 2016

  
826 views
Sep 09 2016 (17:23)
HAPPY NEW YEAR from JBP ET OHE OMG 😲~   9521 blog posts   14 correct pred (46% accurate)
Re# 1986037-12            Tags   Past Edits
So it means the loco is changed two times

  
825 views
Sep 09 2016 (17:26)
I m back~   3979 blog posts   37 correct pred (62% accurate)
Re# 1986037-13            Tags   Past Edits
Yup...at ald it undergoes rake reversal so no problem in cHanging loco.

  
841 views
Sep 09 2016 (17:29)
indian railway~   987 blog posts   9 correct pred (70% accurate)
Re# 1986037-14            Tags   Past Edits
but i spotted kamayani exp. with LHB rakes only 1 timeand then i always see it with ICF rakes

  
764 views
Sep 09 2016 (21:12)
HAPPY NEW YEAR from JBP ET OHE OMG 😲~   9521 blog posts   14 correct pred (46% accurate)
Re# 1986037-15            Tags   Past Edits
I think 3 rake ha iske aur shayad 1 h rake ko lhb ma ha aur tmne b shayad vhi dkha hoga

  
724 views
Sep 09 2016 (21:50)
indian railway~   987 blog posts   9 correct pred (70% accurate)
Re# 1986037-16            Tags   Past Edits
YA MAY BE
  
General Travel
0 Followers
2226 views
Jul 02 2016 (12:21)   BOY/Bhadohi (2 PFs)
 

shahidrrint   143 blog posts   70 correct pred (69% accurate)
Entry# 1914893            Tags   Past Edits
Today after many many years may be 55 years we alighted on the new double line platform of Bhadohi. From today onwards this new platform has been made operational and the new double line route from Bhadohi to Suryawan onwards Janghai has been fully made operational. Punjab Mail 13005 arrived on dot in Bhadohi on new platform no. 2 which was constructed on the fourth line. Punjab mail departed on the new double line upto Suryawan. Beginning of a new era. We are now looking forward to the completion of Bhadohi Varanasi section double line, which will take another six months at this rapid pace. We have been assured that Allahabad via prayag upto BSB Varanasi will be doubled and operational by the end of this year. We hope this election in UP will give us this gift. All MST holders will have a sigh of relief as the journey time...
more...
from Bhadohi to Varanasi a distance of 46 kms. will be less than an hour. Now it takes from 45 minutes to 3 hours depending upon the trains.

  
2082 views
Jul 06 2016 (15:00)
Durgiana Exp needs LHB Rake with Pantry or Buffet*^~   8776 blog posts   1 correct pred (33% accurate)
Re# 1914893-1            Tags   Past Edits
Picture Details: बदलीपुर के समीप दोहरीकरण के तहत नई ट्रैक को सही करते कर्मचारी। (Non-Interlocking Works near Badlipur LC of Mondh Stn for Track Doubling of the Varanasi - Janghai Section).
.
Image Source from Amar Ujala ENewspaper
  
Rail Fanning
0 Followers
2143 views
Jul 05 2016 (11:05)   75115/Ghazipur City - Prayag DEMU | BOY/Bhadohi (2 PFs)
 

shahidrrint   143 blog posts   70 correct pred (69% accurate)
Entry# 1918374            Tags   Past Edits
New DEMU Ghazipur to Prayag inaugural run arriving Bhadohi
  
Info Update
0 Followers
4822 views
Jun 25 2016 (00:21)   12166/Varanasi - Mumbai LTT (Ratnagiri) SF Express | BOY/Bhadohi (2 PFs)
 

Vaibhav Agarwal*^   6114 blog posts   2568 correct pred (94% accurate)
Entry# 1906196            Tags   Past Edits
Regulation/Rescheduling of trains due to NI work at Bhadohi, Mondh & Suraiwal on 24/6/16

  
4673 views
Jun 26 2016 (19:01)
Vaibhav Agarwal*^   6114 blog posts   2568 correct pred (94% accurate)
Re# 1906196-1            Tags   Past Edits
Upto 29/6/16
  
Rail News
0 Followers
6500 views
Other NewsNER/North Eastern  -  
May 11 2016 (05:20)   पीएम मोदी की काशी में हाई स्पीड ट्रेन के लिए करना होगा इंतजार
 

Subhash   984 news posts
Entry# 1842119   News Entry# 267422         Tags   Past Edits
पीएम मोदी के संसदीय क्षेत्र काशी में हाई स्पीड ट्रेन चलने में अभी देरी है। गतिमान एक्सप्रेस चलायी जा चुकी है और अन्य ट्रेनों में सुविधाएं बढ़ाने के साथ उनकी गति को ठीक करने पर ध्यान दिया जा रहा है। यह बात उत्तर रेलवे के महाप्रबंधक एके पुठिया ने सोमवार को कैंट रेलवे स्टेशन पर मीडिया से बातचीत में कही।
उन्होंने कहा कि रेलवे में हो रहे परिवर्तन सबको दिखायी दे रहे है। रेलराज्य मंत्री मनोह सिन्हा ने हाल में ही गाजीपुर से नई दिल्ली के लिए सुहेलदेव एक्सप्रेस चलायी है। अन्य नयी ट्रेन भी चलायी जानी है, जिस पर अंतिम निर्णय रेलवे बोर्ड करेगा। उन्होंने कहा कि कैंट रेलवे स्टेशन के सेकेंड इंट्री (छावनी की तरफ से) के पास वेटिंग हॉल
...
more...
बन कर लगभग तैयार है। इस वेटिंग हॉल में सेकेंट क्लास में यात्रा करने वाले यात्रियों को रुकने का मौका मिलेगा। यहां पर शौचालय की भी सुविधा उपलब्ध होगी। उन्होंने कहा कि रेलवे स्टेशन पर सोलर पैनल लगाये जा रहे है। वर्तमान में जितने पैनल काम कर रहे है उससे प्रति माह तीन लाख रुपये की बचत हो रही है। कैंट रेलवे स्टेशन पर बिजली कटौती के प्रश्र पर महाप्रबंधक ने कहा कि बिजली सप्लाई सही नहीं होने पर ही विद्युत कटौती हो रही होगी। रेलवे खुद बिजली पैदा नहीं करता है इसलिए अधिक जानकारी विद्युत विभाग के लोग ही दे पायेंगे।
हरियाली पर रेलवे कर रहा काम
कैंट रेलवे स्टेशन पर हरियाली नहीं होने के प्रश्र पर उत्तर रेलवे के महाप्रबंधक एके पुठिया ने कहा कि यहां पर जगह का आभाव है। हम लोगों की प्राथमिकता में साफ-सफाई के साथ हरियाली भी है। रेलवे ट्रैक के चारों तरफ हरियाली लगाने का काम शुरू किया जायेगा।
पिछले साल की तुलना में 10 से 15 प्रतिशत अधिक चलेगी समर ट्रेन
उत्तर रेलवे के महाप्रबंधक एके पुठिया ने कहा कि पिछले साल की तुलना में इस बार 10 से 15 प्रतिशत अधिक समर ट्रेन चलायी जायेगी। ट्रेनों के चलने की जानकारी विज्ञापन एवं सोशल मीडिया के माध्यम से सबको दी जा रही है।
टूरिज्म विभाग व रेलवे में चली रही वार्ता
पर्यटन की दृष्टिकोण से बेहतर यात्री सुविधा देने के लिए पर्यटन व रेलवे विभाग में वार्ता चल रही है। हम लोगों का प्रयास है कि पर्यटक व आम यात्री दोनों को ही अधिक से अधिक सुविधा दी जा सके। कैंट रेलवे स्टेशन पर आटोमेटिक वाटर वेडिंग मशीन लगायी जा रही है। यहां पर चल रही विभिन्न योजनों की समीक्षा करने के बाद स्थिति संतोषजनक मिली है।
सुल्तानपुर रूट को देखने के बाद जायेंगे लखनऊ
उत्तर रेलवे के महाप्रबंधक एके पुठिया ने कहा कि यहां की समीक्षा के बाद सुल्तानपुर रूट पर चल रहे ट्रैक दोहरीकरण व विद्युतिकरण के काम को देखने के बाद लखनऊ रवाना हो जायेंगे।

  
6865 views
May 11 2016 (22:10)
BSB AMH New Line VIA KERAKAT~   159 blog posts   2 correct pred (22% accurate)
Re# 1842119-1            Tags   Past Edits
वाराणसी जंक्शन पुर्वांचल का शान है| इसके लिए जितना काम हो उतना ही अच्छा है| लेकिन आस पडोस के स्टेशन पर भी ध्यान दिया जाए|
Page#    Showing 1 to 10 of 32 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site