Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jun 23, 2017 04:14:37 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jun 23, 2017 04:14:37 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 384230-0
Details Edit
Large Station Board;
Entry# 442070-0
Details Edit
Large Station Board;
Entry# 2044018-0

BVRT/Bhimavaram Town (2 PFs)
భీమవరం టౌన్     भीमावरम टाउन

Track: Construction - Doubling+Electrification

sri sai nilayam, Bhimavaram
State: Andhra Pradesh

Elevation: 8 m above sea level
Zone: SCR/South Central   Division: Vijayawada
No Recent News for BVRT/Bhimavaram Town
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 37
Number of Originating Trains: 1
Number of Terminating Trains: 1
Rating: 3.5/5 (25 votes)
cleanliness - good (4)
porters/escalators - average (3)
food - average (4)
transportation - good (4)
lodging - good (3)
railfanning - good (2)
sightseeing - excellent (2)
safety - good (3)

Nearby Stations

BVRM/Bhimavaram Junction 2 km     VND/Vendra 6 km     PAGM/Pennada Agraharam 7 km     UNDI/Undi 8 km     SGKM/Srungavruksham 9 km     LKSH/Lakshminarayanapuram 9 km     CKV/Cherukuvada 12 km     AVLI/Aravalli 12 km     VVM/Viravasaram 13 km     SVDC/Sivadevunichikkala 15 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 47 blog entries  next>>
  
General Travel
0 Followers
569 views
Jun 08 2017 (11:13)   BZA/Vijayawada Junction (10 PFs)

xxxx~   794 blog posts   36 correct pred (56% accurate)
Entry# 2311507            Tags   Past Edits
Vijayawada-Bhimavaram, Narsapur-Machilipatnam doubling and electrification works going on, says DRM
South Central Railway (SCR), Vijayawada Divisional Railway Manager (DRM), R. Dhananjayulu, who took stock of the situation in the division after taking charge on April 17 this year, has focussed on expediting the new projects, including connectivity to the A.P. capital city Amaravati. Priority is being given for safety, passenger amenities and increasing passenger and freight revenues in the division, the DRM said in an interview with The Hindu.
Vijayawada railway station recently bagged the fourth place in cleanliness. What is your response?
...
more...

The credit goes to the passengers who are cooperating with the railway authorities in maintaining hygienic conditions in Vijayawada station premises as well as on moving trains. I congratulate the staff for the achievement. About 200 sanitation staff were deployed in the station with cleaning machines and 150 staff were arranged to clean the bogies.
What are the steps being taken to maintain quality in food items and drinking water in canteens on platforms?
SCR will supply Krishna water in the station after purification. We clean water tanks and take up chlorination frequently.
Officials concerned will conduct random checking and the water being supplied through tanks is cent per cent safe.
As regards food items, we will conduct surprise checks in canteens and check quality of food. Railways will not compromise on food quality and we will not hesitate to cancel licences, if any vendor fails to maintain standards.
What is the status of new projects in the division?
We are waiting for approval for rail connectivity to new Capital, Amaravati. The Vijayawada-Bhimavaram, Narsapur-Machilipatnam doubling and electrification works are going on. Likewise, third line works are under progress between Vijayawada-Kazipet and Vijayawada-Gudur-Chennai. As part, the Vijayawada-Kondapalli third line will be commissioned shortly.
How are the earnings of Vijayawada division?
Going to the previous year’s figures, the freight revenue is not good as coal imports from other countries have stopped. Instead, we are focussing on alternative loadings such as fertilizers, bauxite, laterite, aluminium fins and gypsum. This year, both the passenger and freight revenue earnings show positive growth in the last two months.
54 surveillance cameras
Explain about security on stations and running trains.
In all, 54 surveillance cameras were installed in Vijayawada railway station. The GRP and RPF identified vulnerable trains and sections and there were no major thefts and the crime rate has come down in the division.
What are the benefits of Route Relay Interlocking (RRI), which was completed recently in Vijayawada station?
RRI has increased operational manoeuvrability and safety. More than 700 routes are possible after RRI, which was taken up with advanced technology.
Give details on passenger amenities in stations.
In Vijayawada railway station, escalators were provided on platforms 2 to 7, and now we are installing escalators on 8 and 9 platforms. Besides, lifts were provided.
The bids will be opened by this month end for Station Re-Development Programme which will provide more facilities for the commuters.
What are the steps being taken to prevent accidents at railway gates?
We have 23 unmanned level crossing gates in Vijayawada Railway Division. We will remove all the unmanned gates by this year end in a phased manner.
click here
  
Rail Fanning
0 Followers
842 views
Mar 11 2017 (19:05)   57382/Narasapur - Guntur Passenger (UnReserved) | BVRT/Bhimavaram Town (2 PFs)

Railfan Z bids adieu to SR*^~   11502 blog posts   2583 correct pred (84% accurate)
Entry# 2194275            Tags   Past Edits
82 Down Guntur Passenger enters into BVRT on a rather sunny morning.
  
Poll
0 Followers
21055 views
17 votes
Nov 27 2016 (11:05)   17214/Nagarsol - Narsapur (Via Warangal) Express | NZB/Nizamabad Junction (3 PFs)

Rizwan NZB Jn~   278 blog posts   1 correct pred (50% accurate)
Entry# 2072710            Tags   Past Edits
Which train should be diverted to Nizamabad-Peddapalli-Warangal from NZB-SC-WL
17214/Nagarsol - Narsapur (Via Warangal) Express6%1
18510/Hazur Sahib Nanded - Visakhapatnam Express24%4
18310/Hazur Sahib Nanded - Sambalpur Express6%1
18504/Sainagar Shirdi - Vishakapatnam Express65%11

  
20208 views
Nov 27 2016 (17:40)
Shubham NZB Jn~   211 blog posts   3 correct pred (75% accurate)
Re# 2072710-1            Tags   Past Edits
there is no option for 2 selection first preference is vskp snsi exp but ned vskp is also my choice....it is needed as well....

  
19941 views
Nov 28 2016 (12:27)
Shubham NZB Jn~   211 blog posts   3 correct pred (75% accurate)
Re# 2072710-2            Tags   Past Edits
there is no option for 2 selection first preference is vskp snsi exp but ned vskp is also my choice....it is needed as well....

  
19817 views
Nov 29 2016 (15:22)
12952 GKP Trip 28 June BSK~   6737 blog posts   343 correct pred (77% accurate)
Re# 2072710-3            Tags   Past Edits
Provide one option for none of them.

  
19645 views
Nov 29 2016 (21:06)
venugopal.mech7   36 blog posts   31 correct pred (84% accurate)
Re# 2072710-4            Tags   Past Edits
18503/18504 is my best option
  
Info Update
0 Followers
1162 views
Nov 01 2016 (12:46)   BVRT/Bhimavaram Town (2 PFs)
 

ఆంద్రప్రదేశ్ ప్రత్యేక హోదా^   2088 blog posts   108 correct pred (65% accurate)
Entry# 2044018            Tags   Past Edits
#SB PIC from MAJNU TELUGU MOVIE
  
Travel Question
0 Followers
2626 views
Aug 24 2016 (17:07)   18519/Vishakapatnam - Mumbai LTT Express (PT) | BVRT/Bhimavaram Town (2 PFs)
 

murali6032   666 blog posts   1130 correct pred (66% accurate)
Entry# 1971497            Tags   Past Edits
Guys how's rush in unreserved coaches of 18519 from BVRT to BZA , I have connecting train at BZA want to catch it. Any one travelled recently in this exp ? I have some luggage also

  
Aug 24 2016 (17:22)
SRG*^~   35613 blog posts   171854 correct pred (76% accurate)
Re# 1971497-1            Tags   Past Edits
UR is bit free in this, you have 6 UR coaches in this train.
Page#    Showing 1 to 5 of 47 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.