Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed May 24, 2017 21:27:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed May 24, 2017 21:27:59 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 404563-0

CHZ/Charlapalli (2 PFs)
చర్ల్ పల్లి/چرلپللی     चल॔पल्ली

Track: Double Electric-Line

Cherlapalli, Medchal Dist.
State: Telangana

Elevation: 525 m above sea level
Zone: SCR/South Central   Division: Secunderabad
No Recent News for CHZ/Charlapalli
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 26
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 3.5/5 (6 votes)
cleanliness - average (1)
porters/escalators - n/a (0)
food - average (1)
transportation - excellent (1)
lodging - n/a (0)
railfanning - excellent (1)
sightseeing - good (1)
safety - average (1)

Nearby Stations

MLY/Moula Ali 7 km     GT/Ghatkesar 8 km     MJF/Malkajgiri Junction 9 km     DYE/Dayanand Nagar 9 km     SFX/Safilguda 9 km     MLYG/Mouli Ali Gate 9 km     LGD/Lallaguda 10 km     STPD/Sitafalmandi 10 km     LGDH/Lalaguda Gate 10 km     ATC/Arts College 11 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 41 blog entries  next>>
  
General Travel
0 Followers
500 views
Apr 12 2017 (02:27)   CHZ/Charlapalli (2 PFs)

Shiek Kaleem~   185 blog posts
Entry# 2231694            Tags   Past Edits
In a bid to construct satellite terminal at cherlapally to reduce traffic at sc hyderabad railways was in talks with state govt for land acquisition.railways presently has 50 acres land at cherlapally it needs more 50 acres of hcl to construct a good station.but state govt wants precious land from secunderabad station to donate bpl houses.but railways refused it and today scr gm suggested that construction should be started in same 50 acres land.gm also stated that this station would be build in eco friendly manner with large green space.it would be first green field station of hyderabad.this station lies 10 km from city and 5 km from outer ring road.at present there are 4 (2 main line 2 mmts)platforms.more 4 pf can be added.and some place can be left for parking.and there will be congestion for pit lines and shed.since there is no land if railways get land this...
more...
would be be like sc
  
General Travel
0 Followers
2407 views
Mar 30 2017 (18:25)   17230/Sabari Express (PT) | CHZ/Charlapalli (2 PFs)

Shiek Kaleem~   185 blog posts
Entry# 2216265            Tags   Past Edits
Sabari express and goods train near cherlapally
  
General Travel
0 Followers
2292 views
Mar 19 2017 (14:41)   67275/Falaknuma - Bhongir MEMU | CHZ/Charlapalli (2 PFs)

Shiek Kaleem~   185 blog posts
Entry# 2202887            Tags   Past Edits
Mmts phase 2 quadrapling works recorded fully in bw cherlapally ghatkesar.i was travelling with my mom.i train was at blasting speed normally diz train crawls

  
1809 views
Mar 28 2017 (04:34)
highvoltageeee2k3~   218 blog posts
Re# 2202887-1            Tags   Past Edits
awesome work sir.
  
General Travel
0 Followers
2115 views
Mar 19 2017 (11:05)   67265/Warangal - Hyderabad Push Pull Passenger | GT/Ghatkesar (2 PFs)

Shiek Kaleem~   185 blog posts
Entry# 2202642            Tags   Past Edits
Fob works at ghatkesar station for mmts phase 2.warangal hyderabad pushpull memu moving towards hyderabad
  
General Travel
0 Followers
2756 views
Mar 14 2017 (23:08)   MLYC/Moula Ali C Cabin

Shiek Kaleem~   185 blog posts
Entry# 2198005            Tags   Past Edits
This stop siding which will be removed in future for quadrapling works at maulali
  
General Travel
0 Followers
1374 views
Mar 19 2017 (14:34)   67275/Falaknuma - Bhongir MEMU | GT/Ghatkesar (2 PFs)

Shiek Kaleem~   185 blog posts
Entry# 2202875            Tags   Past Edits
Fm bhongir memu departing ghatkesar

  
1339 views
Mar 19 2017 (14:54)
Shiek Kaleem~   185 blog posts
Re# 2202875-1            Tags   Past Edits
Some unlucky captures
  
General Travel
0 Followers
1199 views
Mar 19 2017 (11:12)   CHZ/Charlapalli (2 PFs)

Shiek Kaleem~   185 blog posts
Entry# 2202656            Tags   Past Edits
Cherlapally station building and fob works.captured while travelling

8 posts - Sun Mar 19, 2017

  
758 views
Mar 19 2017 (13:31)
Shiek Kaleem~   185 blog posts
Re# 2202656-9            Tags   Past Edits
Cant do anything but if chz is built terminal like sc they are saying 6 pf.it can become easy for coaching and repairs it is near to sheds.and trains to kcg lingampalli wadi can be operated through bypass.it is very far from city but trains can be operated hassle free

  
738 views
Mar 19 2017 (13:32)
LHB for SCR legends please~   464 blog posts   62 correct pred (74% accurate)
Re# 2202656-10            Tags   Past Edits
Ya. But Shankarpalli was proposed as another terminal and this is way out of the city outskirts. Could be a political-real estate nexus.

  
556 views
Mar 19 2017 (14:32)
Shiek Kaleem~   185 blog posts
Re# 2202656-11            Tags   Past Edits
Even shankarpally is far away from city and then again sanathnagar goods come in between.but since hyderabad is such a big city we must have terminals every where like malkajgiri and bolarum for nizamabad trains.lingamapalli doesnt hv space or it could be for wadi trains hafeezpet or nagulapalli is better.and again falaknuma or umdanagar and cherlapalli and maulali both are important for bza trains.it should be like all trains which coming to city(down trains) should be terminated at terminals and stopped there and later reach sc hyb for coaching facilities and then depart Hyderabad

  
554 views
Mar 19 2017 (14:44)
deepakyerr~   910 blog posts
Re# 2202656-12            Tags   Past Edits
Coaching terminals with pit lines should be developed at Shankarpalli and Cherlapalli. The Trains coming from Vja Kzj via main line or nalgonda mahaboobnagar and through KcG should halt at SC Begumpet Sanantgar Hafeezpet/Hitech LPI and halt at shankarpalli MTM Gautami Cocanada Narayanadri Falaknuma should be extended while trains coming from wadi has to run till Charlapalli. This will decongest SC and be convenient for travellers to board at intermediate stations within Hyd.

  
499 views
Mar 19 2017 (15:54)
Shiek Kaleem~   185 blog posts
Re# 2202656-13            Tags   Past Edits
This will reduce coaching time.controllers at sc we know about them.see delhi mumbai how many terminals they have but in hyd we used to have only sc and nampally.then kcg was made need more
  
Site Suggestion
0 Followers
706 views
Mar 23 2017 (09:53)   CHZ/Charlapalli (2 PFs)

Shiek Kaleem~   185 blog posts
Entry# 2207396            Tags   Past Edits
How can we add fci godown and iocl siding hindustan petroleum siding on map.this are single electrified lines.food corpration of india fci godown is one of the biggest one in hyderabad.goods trains go inside that and there are platforms for loading unloading of civil supplies.and the other one is lgp bottling plant and petrol retail point.here petrol from trains is supplied to city by petrol lorries.ppl of this area had large amount of sound pollution when road were not built but now its ok.add this place#admin #moderator #site
  
General Travel
0 Followers
548 views
Mar 17 2017 (09:35)   CHZ/Charlapalli (2 PFs)

Shivam~   3899 blog posts   1161 correct pred (87% accurate)
Entry# 2200282            Tags   Past Edits
WDG4 twins with Long consist loop for Overtake.
click here
  
Social
0 Followers
882 views
Mar 16 2017 (20:34)   MLYC/Moula Ali C Cabin

Shiek Kaleem~   185 blog posts
Entry# 2199919            Tags   Past Edits
It's raining here heavily since two hours ☺
Page#    Showing 1 to 10 of 41 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site