Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri May 26, 2017 01:56:10 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri May 26, 2017 01:56:10 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 459680-0
Details Edit
Large Station Board;
Entry# 2057552-0
Details Edit
Large Station Board;
Entry# 2057552-0
Details Edit
Platform Pic; Large Station Board;
Entry# 2262320-0

GUR/Ganagapur Road (2 PFs)
ಗಾಣಗಾಪುರ ರೋಡ್     गाणगापुर रोड

Track: Construction - Diesel-Line Doubling

Tel: 08470-266042, Ganagapur Road, Dist Gulbarga
State: Karnataka

Elevation: 445 m above sea level
Zone: CR/Central   Division: Solapur
No Recent News for GUR/Ganagapur Road
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 21
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 2.5/5 (7 votes)
cleanliness - average (1)
porters/escalators - n/a (0)
food - average (1)
transportation - average (1)
lodging - poor (1)
railfanning - average (1)
sightseeing - good (1)
safety - average (1)

Nearby Stations

HHD/Hunsihadgil 6 km     GDGN/Gaudgaon 6 km     KUI/Kulali 13 km     SVG/Sawalgi 14 km     BBD/Bablad 21 km     DUD/Dudhani 23 km     GR/Gulbarga 27 km     HQR/Hirenanduru 36 km     BOT/Boroti 37 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 16 blog entries  next>>
  
★★  General Travel
0 Followers
1113 views
May 04 2017 (13:22)   GUR/Ganagapur Road (2 PFs)

Jay Maharashtra~   323 blog posts   15 correct pred (81% accurate)
Entry# 2262320            Tags   Past Edits
Good village more bakery near 8 km gangapur road #sb...

  
702 views
May 05 2017 (21:04)
Sairaj Shankar IRF~   276 blog posts   14 correct pred (54% accurate)
Re# 2262320-2            Tags   Past Edits
Village Nice...
  
★★  Rail Fanning
0 Followers
1067 views
May 03 2017 (22:27)   12219/Mumbai LTT - Secunderabad AC Duronto Express | GUR/Ganagapur Road (2 PFs) | GY/WDP-4D/40271

pranavsalgarkar942~   29 blog posts
Entry# 2261556            Tags   Past Edits
Indian Railways! Single Line.....Crossing And Overtake.....SC Duronto At Gangapur Road...
Video Link:click here
Trains Included In This Video
11302 SBC-CST Udyan For Crossing Up Loop
12219 LTT SC Duronto Through Main Line Overtook 11013
...
more...
LTT CBE EXPRESS On Down Loop.
LOCATION :Gangapur Road
Date Taken:13 Nov 2016
Hope you will enjoy the video....
  
★  Rail Fanning
0 Followers
3997 views
Nov 22 2016 (08:04)   12627/Karnataka Express (PT) | GUR/Ganagapur Road (2 PFs)

PixelTrailzDotCom*^~   1748 blog posts   52 correct pred (78% accurate)
Entry# 2067540            Tags   Past Edits
Mobile Users : click here
.
New Delhi bound Karnataka Express crossing the Guntakal bound Solapur - Guntakal Passenger at Ganagapur Road. KK had a beautiful run that day
.
Please subscribe for more videos
...
more...
  
Info Update
0 Followers
1029 views
Dec 10 2016 (15:57)   GUR/Ganagapur Road (2 PFs)

AP Spl STS^   1866 blog posts   103 correct pred (64% accurate)
Entry# 2086651            Tags   Past Edits
PR. No. 556 Date: 10th Dec, 2016
Temporary Stoppage to Ten Trains for “Datta Jayanthi” at Ganagapur Station
With a view to facilitate passengers / pilgrims attending Datta Jayanthi at Ganagapur station on Central Railway, ten Express trains are provided temporary stoppage at Ganagapur Station from 12th to 15th December, 2016.
1. Train No. 17031 Mumbai CST-Hyderabad Express will arrive / depart Ganagapur 00:01/00:03
...
more...
hrs from 12th to 15th December, 2016.
2. Train No. 17032 Hyderabad-Mumbai CST Express will arrive / depart Ganagapur at 01:58/02:00 hrs from 12th to 15th December, 2016.
3. Train No. 16339 Mumbai CST-Nagercoil Express will arrive / depart Ganagapur at 22:02/22:04 hrs from 12th to 15th December, 2016.
4. Train No. 16340 Nagercoil-Mumbai CST Express will arrive / depart Ganagapur at 10:13/10:15 hrs from 12th to 15th December, 2016.
5. Train No. 16351 Mumbai-Nagercoil Balaji Express will arrive / depart Ganagapur at 22:02/22:04 hrs from 12th to 15th December, 2016.
6. Train No. 16352 Nagercoil-Mumbai Balaji Express will arrive / depart Ganagapur at 10:13/10:15 hrs from 12th to 15th December, 2016.
7. Train No. 16331 Mumbai CST-Thiruvananthapuram Weekly Express will arrive / depart Ganagapur at 22:02/22:04 hrs from 12th to 15th December, 2016.
8. Train No. 16332 Thiruvananthapuram-Mumbai CST Weekly Express will arrive / depart Ganagapur at 10:13/10:15 hrs from 12th to 15th December, 2016.
9. Train No. 18519 Visakhapatnam-Mumbai LTT Express will arrive / depart Ganagapur at 15:46/15:48 hrs from 12th to 15th December, 2016.
10. Train No. 18520 Mumbai LTT-Visakhapatnam Express will arrive / depart Gangapur at 17:45/17:47 hrs from 12th to 15th December, 2016.
  
General Travel
0 Followers
920 views
Feb 10 2017 (17:01)   GUR/Ganagapur Road (2 PFs)

GKP WAP5^~   2270 blog posts   209 correct pred (73% accurate)
Entry# 2159042            Tags   Past Edits
TEMPORARY STOPPAGE AT GANAGAPUR ROAD
In view of ‘Magh Utsav’ at Ganagapur (Gulbarga District, Karnataka), temporary stoppage has been provided for trains at Ganagapur Road Railway Station from 09.02.2017 to 14.02.2017 as detailed below.
Sl. No.
Description of Train
Timings
...
more...
at Ganagapur
1.
Train No.16339 Mumbai CST – Nagercoil Express
22.07 / 22.09 hrs.
2.
Train No.16351 Mumbai CST – Nagercoil Express
22.07 / 22.09 hrs.
3.
Train No.16331 Mumbai CST – Thiruvananthapuram Express
22.07 / 22.09 hrs.
4.
Train No.16340 Nagercoil – Mumbai CST Express
10.16 / 10.18 hrs.
5.
Train No.16352 Nagercoil – Mumbai CST Express
10.16 / 10.18 hrs.
6.
Train No.16332 Thiruvananthapuram – Mumbai CST Express
10.16 / 10.18 hrs
  
General Travel
0 Followers
4313 views
Apr 08 2015 (21:02)   18519/Vishakapatnam - Mumbai LTT Express (PT) | GUR/Ganagapur Road (2 PFs)
 

Solapur Superfast~   1645 blog posts   66 correct pred (71% accurate)
Entry# 1422530            Tags   Past Edits
Captured from 18519 VSKP - LTT Express
  
0 Followers
1894 views
Jun 20 2012 (16:20)   GUR/Ganagapur Road (2 PFs)
 

RAVI PRAJAPATI*^~   4541 blog posts   954 correct pred (64% accurate)
Entry# 459680            Tags   Past Edits
Ganagapur Road/GUR

  
1857 views
Jun 20 2012 (16:24)
Aap Aaye Bahar Aayi*^~   5878 blog posts   11807 correct pred (66% accurate)
Re# 459680-1            Tags   Past Edits
Tnx, updated.

  
1850 views
Jun 20 2012 (16:24)
Aap Aaye Bahar Aayi*^~   5878 blog posts   11807 correct pred (66% accurate)
Re# 459680-2            Tags   Past Edits
Pic. Source :P
  
★  Rail Fanning
0 Followers
6033 views
Jul 18 2013 (13:12)   11020/Konark Express | GUR/Ganagapur Road (2 PFs)
 

PixelTrailzDotCom*^~   1748 blog posts   52 correct pred (78% accurate)
Entry# 809841            Tags   Past Edits
Horns Blasting 13412 KZJ WDG3A shows who is the boss as it leads the 11020 BBS to CSTM Konark express at Ganagapur Road.
Taken onboard CSTM-SBC Udyan express. Konark is seen overtaking the Gulbarga - Solapur Passenger 57628
  
★★★  Info Update
0 Followers
10954 views
Oct 30 2015 (21:39)   GR/Gulbarga (4 PFs)
 

Guest: 84b334b5   show all posts
Entry# 1633242            Tags   Past Edits
COMPLETE UPDATE ON KALABURAGI DAUND DOUBLING
Pics & Info by:- mukundvs @ SSCI
I started my journey in Karnataka Express from Kalaburagi as on 30/10/2015. These are the pictures clicked at the very best to give latest civil work happening in the north region of Karnataka and how this doubling would improve connectivity with the state of Karnataka.
Pic details
1.
...
more...
Kalaburagi Station
2. New footover bridge coming up @ GR
3. Last sign of electrification , which ends at beginning of the platforms in Kalaburagi
4. The first sign of doubling work after crossing of Kalaburagi towards Akkalkot road. Guess the new contractor has finally started with the work.
5. The tractor trolly at its best to deliver sleepers at its destination
6. Scissor crossing
7. More sleepers being brought in
8. Replacement of scissor crossing by new station, but all this activity was seen after Akkalkot road station, practically work has just begun on Kalaburagi Akkalkot road section, previous contractor had done hardly any job, with little bit of earth work, thank God the contractor has been changed
9. Another view of the upcoming station
10. Points are almost ready, but gain its all in Akkalkot-Hotgi section
11. Work happening at speed on Akkalkot- Hotgi section
12. A day prior to CRS inspection on Solapur div , brings in whole army of railway workers
13. Minor civil work, storm drain
14. More work seen between Mohol Kurduvadi. Looks like this is more on priority thank Kurduvadi- Bhigvan section towards Daund
15. Earth work at its full swing on Mohol- Kurduvadi section.
16. Bridge work happening simultaneously
17. Main benefit of existing bridges is having a room for second line. Saves time and money too.
18. Work is slow after Kurduvadi- Bhigvan section and the only thing is happening is the terrain are being cut, making way for the second line.
19. Won't go too much in details as most of the work is being taken up by CR in Akkalkot Road- Hotgi section and work is at very fast pace between Solapur Kurduvadi Jn. However lots is to be done as hardly any sign of signalling work could be seen. Plus work has just re started on Kalaburagi- Akkalkot road and Kurduvadi- Bhigvan.
Pics & Info by:- mukundvs @ SSCI

  
7753 views
Oct 31 2015 (08:02)
knkprasad956*^~   2233 blog posts
Re# 1633242-1            Tags   Past Edits
Thanks for updates.

  
7403 views
Oct 31 2015 (08:31)
▶ECR97⭐ महाबोधि सुपरफास्ट एक्सप्रेस ⭐ 98NCR◽◀~   14067 blog posts   758 correct pred (69% accurate)
Re# 1633242-2            Tags   Past Edits
Grt shots frnd
Aftr seeing all these
M remembering old Days of
Chhapra Sonpur 2nd Track Coversion Frm Mg to bG
Nd Also electrification

  
7460 views
Oct 31 2015 (13:07)
ranjitg370   2437 blog posts   1141 correct pred (74% accurate)
Re# 1633242-3            Tags   Past Edits
hope bhigwan - gulbarga track doubling work complete on time.
thanks for updating info

  
Dec 08 2015 (21:04)
Sk Mangla*^~   1342 blog posts   77041 correct pred (98% accurate)
Re# 1633242-4            Tags   Past Edits
Wadi-Gulbarga section was doubled in mid-80s...
A wait of 30 years after that !!
  
General Travel
0 Followers
10565 views
Dec 23 2015 (18:31)   12702/Hussain Sagar SF Express (PT) | HYB/Hyderabad Deccan Nampally (6 PFs) | KYN/WDG-3A/13426
 

Shan H Fernandes   948 blog posts   183 correct pred (59% accurate)
Entry# 1688900            Tags   Past Edits
Crazy Boy Racing on the parallel track with Kalyan WDG-3A hauled Hyderabad - Mumbai Hussainsagar Express.
Youtube Video link : click here
Page#    Showing 1 to 10 of 16 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site