Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Mar 30, 2017 17:04:19 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Mar 30, 2017 17:04:19 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1655929-0
Details Edit
Large Station Board;
Entry# 2007245-0
Details Edit
Large Station Board;
Entry# 2007245-0
Details Edit
Large Station Board;
Entry# 1954800-0

GR/Gulbarga (4 PFs)
ಗುಲ್ಬರ್ಗ / گلبرگہ     गुलबर्गा
[Kalaburgi]

Track: Construction - Double-Line Electrification

Station Road, Gulbarga 585101
State: Karnataka

Elevation: 458 m above sea level
Zone: CR/Central   Division: Solapur
No Recent News for GR/Gulbarga
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 4
Number of Halting Trains: 71
Number of Originating Trains: 4
Number of Terminating Trains: 4
Rating: 3.8/5 (131 votes)
cleanliness - good (19)
porters/escalators - good (17)
food - good (15)
transportation - good (17)
lodging - good (16)
railfanning - good (15)
sightseeing - good (16)
safety - good (16)

Nearby Stations

BBD/Bablad 6 km     HQR/Hirenanduru 9 km     SVG/Sawalgi 13 km     MR/Martur 16 km     HHD/Hunsihadgil 21 km     SDB/Shahabad 27 km     GUR/Ganagapur Road 27 km     GDGN/Gaudgaon 33 km     WADI/Wadi Junction 37 km     XX-HLTS/ 38 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 297 blog entries  next>>
  
★  Rail Fanning
0 Followers
3227 views
Oct 13 2016 (15:50)   11307/Gulbarga - Hyderabad InterCity Express | GR/Gulbarga (4 PFs)

RF Z ▶NEVER BOARD A MOVING TRAIN◀*^~   11290 blog posts   2564 correct pred (84% accurate)
Entry# 2022103            Tags   Past Edits
  
Social
0 Followers
2368 views
Mar 21 2017 (16:44)   NZB/Nizamabad Junction (3 PFs)

Rizwan NZB Jn~   257 blog posts   1 correct pred (50% accurate)
Entry# 2205368            Tags   Past Edits
Look how dramatic it is, let's name it as the Golden Ellipse as these stations shall play a vital role between CR and SCR once the proposed lines and other pending projects gets completed. Bodhan-Bidar line (in dotted brown) which is pending to be commissioned would be boon connecting the either sides. Though it may take a lot of time but the future of these stations will make an economical impact in the development of this region.
  
General Travel
0 Followers
2505 views
Dec 07 2016 (17:33)   GR/Gulbarga (4 PFs)

South coastal railway zone hq VSKP~   239 blog posts   21 correct pred (54% accurate)
Entry# 2083410            Tags   Past Edits
This is extended version of 12604/12603.This train is extended to Gulbarga
Please rate and give your valuble suggesions
/train/54772/146/35
/train/54771/35/146

  
421 views
Mar 21 2017 (12:28)
deepakyerr~   831 blog posts
Re# 2083410-1            Tags   Past Edits
Already the daily trains are saturated and run with 120% occupancy throughout the year and extension is not possible and shouldn't be done. The present Gulbarga Sc intercity can be run in that slot as Hubli Sc exp almost acts as a intercity in daytime between Gulbarga Sc.
  
★★  General Travel
0 Followers
5123 views
Dec 06 2016 (12:09)   GR/Gulbarga (4 PFs)

skumarvkulkarni~   1649 blog posts
Entry# 2081920            Tags   Past Edits
Bidar Gulbarga Railway line updates.
The Margutti Tunnel works achieved a major breakthrough
Tunnel boring completed, Both end connected on 3rd December... There is light at the end of tunnel ...

  
4800 views
Dec 06 2016 (12:14)
चली चली मेरी रेल चली~   1025 blog posts   79 correct pred (85% accurate)
Re# 2081920-1            Tags   Past Edits
Thats great. The deadline was 15th Dec but railways managed to complete 12 days early.

  
4746 views
Dec 06 2016 (13:28)
skumarvkulkarni~   1649 blog posts
Re# 2081920-2            Tags   Past Edits
thats how SCR works :-) always ahead of time

  
3165 views
Jan 13 2017 (12:24)
Foamer~   1480 blog posts
Re# 2081920-3            Tags   Past Edits
Any new updates about the line sir? Will the promise of inauguration by March be kept?

  
2194 views
Feb 06 2017 (18:38)
Rockstar Hubbali Janshatabdi~   1939 blog posts   700 correct pred (71% accurate)
Re# 2081920-4            Tags   Past Edits
Have they laid the rails in the full stretch ?? When is the CRS inspection for GR-Bidar line ??

  
1986 views
Feb 07 2017 (10:01)
skumarvkulkarni~   1649 blog posts
Re# 2081920-5            Tags   Past Edits
not yet last time when i visited in Dec Rails were still not laid .. hopefully when I visit next time will get more details.
  
★  General Travel
0 Followers
2765 views
Mar 06 2017 (23:30)   SUR/Solapur (5 PFs)

Solapur JN~   189 blog posts
Entry# 2188365            Tags   Past Edits
Electrification soon to be completed between BGVN to AKOR

2 posts - Tue Mar 07, 2017

3 posts - Wed Mar 08, 2017

  
1617 views
Mar 09 2017 (19:05)
Aslam Shaikh   187 blog posts
Re# 2188365-6            Tags   Past Edits
That's what I was also looking for first electrification and then doubling can happen as and when they eant .

  
1486 views
Mar 10 2017 (11:02)
ranjitg370   2282 blog posts   1141 correct pred (74% accurate)
Re# 2188365-7            Tags   Past Edits
Doubling & Electrification both are very important in this route. I think they should go for electrification along with doubling at the same time. So without any delay it will complete in time.

  
1113 views
Mar 13 2017 (13:48)
Praveen Dusi   23 blog posts   25 correct pred (56% accurate)
Re# 2188365-8            Tags   Past Edits
The Article doesn't say that they will do electrification between Bhigwan and Akalkot Road. But it says that they are planning to electrify the newly doubled Vakav - SUR - Akalkot Road.
But I have my doubts if they will do unless Bhigwan - Vakav is doubled and electrified. In fact IR should try to double the GR - Akalkot road and electrify so that electrification is completed between GTL - SUR.

  
779 views
Mar 18 2017 (01:39)
highvoltageeee2k3   47 blog posts
Re# 2188365-9            Tags   Past Edits
hi Sir,
Between bhigwan and solapur which sections do you think will be completed related to doubling?
Also doubling & electrification between guntakal and wadi how is it going.
Will it be completed this year?

  
739 views
Mar 18 2017 (05:52)
highvoltageeee2k3   47 blog posts
Re# 2188365-10            Tags   Past Edits
What parts are pending between solapur and daund and which ones are challenging and time taking?
  
General Travel
0 Followers
1218 views
Feb 15 2017 (16:37)   GR/Gulbarga (4 PFs)

Kedar Joshi   399 blog posts   4 correct pred (67% accurate)
Entry# 2165560            Tags   Past Edits
GR Rly Division should happen ASAP. Why people of GR are keeping quiet???

  
1131 views
Feb 16 2017 (09:28)
skumarvkulkarni~   1649 blog posts
Re# 2165560-1            Tags   Past Edits
They are sleeping :-)
  
General Travel
0 Followers
4448 views
Feb 06 2017 (16:41)   22133/Solapur - Yesvantpur SF Express (PT) | GR/Gulbarga (4 PFs)

skumarvkulkarni~   1649 blog posts
Entry# 2153568            Tags   Past Edits
PERMANENT AUGMENTATION WITH AC 3-TIER COACH
Railways have decided to permanently augment the Train No.22133/34 Solapur- Yesvantpur – Solapur DailyExpress with o­ne additional Third AC. Coach.
The additional coach will be added to Train No. 22133Solapur- Yesvantpur daily Express with effect from 28.01.2017 and the Train No. 22134 Yesvantpur –Solapur Daily Express with effect from 29.01.2017.
The train will have 22 coaches comprising of
...
more...
One First AC coach,Two AC 2-tier coach ThreeAC 3-tier coaches, Eight Second class Sleeper coaches, SixGeneral Second Class coaches and Two Luggage and Break-van with disabled friendly compartment.
(E.Vijaya)
Chief Public Relations Officer
Hubballi
SWR press release no.188 uploaded today in SWR website
click here

  
3882 views
Feb 06 2017 (16:43)
skumarvkulkarni~   1649 blog posts
Re# 2153568-1            Tags   Past Edits
Now this super hit express will be 22 coacher and will have 6 AC coaches, 8 Sleeper, 8 General(incl guard+ladies).. #admin please update the composition

  
3972 views
Feb 06 2017 (17:00)
Hyderabad Karnataka needs a dedicated train to SBC*^~   9626 blog posts   497 correct pred (74% accurate)
Re# 2153568-2            Tags   Past Edits
2 more Sleeper class should be added as well

  
3933 views
Feb 06 2017 (17:08)
skumarvkulkarni~   1649 blog posts
Re# 2153568-3            Tags   Past Edits
yeah 2 more sleeper coaches should be added which will make it 24 coacher and there is huge demand from Gulbarga also for this

  
2812 views
Feb 15 2017 (16:23)
Kedar Joshi   399 blog posts   4 correct pred (67% accurate)
Re# 2153568-4            Tags   Past Edits
Its a Semi Humsafar train. This train has to be terminated at GR.

  
2840 views
Feb 15 2017 (23:05)
New MAQ MAS Exp via Has Ypr~   4117 blog posts   306 correct pred (68% accurate)
Re# 2153568-5            Tags   Past Edits
It should be diverted to Bidar instead of Solapur from GR, after new line completion.
  
Info Update
0 Followers
4977 views
Jan 28 2017 (09:47)   SUR/Solapur (5 PFs)

Piyush S~   1563 blog posts   65 correct pred (72% accurate)
Entry# 2143066            Tags   Past Edits
#PuneSolapurDoubling
Traffic block from 1st to 5th Feb for interlocking work between Mohol and Wakav.
Trains towards Bangalore/Chennai diverted between Pune and Guntkal via. Miraj, Hubli, Gadag
Trains towards Hyderabad diverted between Kurduwadi and Vikarabad via. Latur.
Source
...
more...

  
4766 views
Jan 29 2017 (07:40)
Piyush S~   1563 blog posts   65 correct pred (72% accurate)
Re# 2143066-1            Tags   Past Edits
Caution started from today itself.. onboarding Hutatma Express.. train covered just 35 Km in last 70 mins.
  
General Travel
0 Followers
12775 views
Mar 24 2016 (14:32)   17015/Visakha Express | BBS/Bhubaneswar (6 PFs)
 

Mangalagiri   335 blog posts
Entry# 1777805            Tags   Past Edits
17015 should be extended till LTT/DR/CSTM as Konark is not sufficient to meets its demands ..

2 posts - Thu Mar 24, 2016

  
8406 views
Mar 24 2016 (18:45)
Boxer Bhai   38476 blog posts   12677 correct pred (61% accurate)
Re# 1777805-4            Tags   Past Edits
question asia poocha hai

  
Mar 27 2016 (09:15)
AAA   353 blog posts
Re# 1777805-5            Tags   Past Edits
It should be extended till ADI

  
10680 views
Mar 27 2016 (12:24)
Guest: 81eb314e   show all posts
Re# 1777805-6            Tags   Past Edits
SAME TIME IT SHOULD BE RE-NAMED AS Lingaraja OR Pinaka,Ekamra EXPRESS WITH MORE MPS.

  
11403 views
Mar 27 2016 (15:45)
Solapur JN~   189 blog posts
Re# 1777805-7            Tags   Past Edits
no news regarding it?

  
10752 views
Mar 27 2016 (18:34)
Mangalagiri   335 blog posts
Re# 1777805-8            Tags   Past Edits
No Change or Reversal Loco is required from VSKP if a powerful diesel loco like WDP4 is attached to it.
Provides good connection from BBS/VSKP/BZA/GNT to ADI
  
★  General Travel
0 Followers
5886 views
Jan 13 2017 (08:48)   11307/Gulbarga - Hyderabad InterCity Express | GR/Gulbarga (4 PFs)

Piyush S~   1563 blog posts   65 correct pred (72% accurate)
Entry# 2125396            Tags   Past Edits
#WhiteElephant
Public from Solapur and Gulbarga blaming Ex-Railway Minister for running Gulbarga - Hyderabad Intercity empty and doing politics for Hubli - Secunderabad (as not beneficiary for SUR purposefully).

4 posts - Fri Jan 13, 2017

1 posts - Sat Jan 14, 2017

4 posts - Tue Jan 17, 2017

1 posts - Wed Jan 18, 2017

  
3561 views
Jan 18 2017 (18:32)
tired f waitng4d PR SCRs train gets LHB rake~   1775 blog posts   36 correct pred (70% accurate)
Re# 2125396-11            Tags   Past Edits
For today's Journey of 17319 UBL SC Express -
Current availability between UBL and GR is SL 87 3A 26 2A 17
Current availability between GR and SC is SL 288 3A 50 2A 31...
Now u can see urself for a normal weekday like today , the demand that exists section wise..
The
...
more...
train has a decent patronage between UBL and GR. People use it as a ICE from GR - SC. Asking every train to pass through SUR with a LR and making a round about is foolishness.

  
3272 views
Jan 19 2017 (09:33)
skumarvkulkarni~   1649 blog posts
Re# 2125396-12            Tags   Past Edits
perferct ... also the Mini siddeshwar should be extended till Gulbarga this is idle since morning at Solapur wasteage of rake can be reduced

  
3483 views
Jan 19 2017 (10:06)
Piyush S~   1563 blog posts   65 correct pred (72% accurate)
Re# 2125396-13            Tags   Past Edits
Bcoz UBL SC is idle for 1 hr at Hotgi.

  
3182 views
Jan 19 2017 (12:26)
tired f waitng4d PR SCRs train gets LHB rake~   1775 blog posts   36 correct pred (70% accurate)
Re# 2125396-16            Tags   Past Edits
I would rather support extension of the said 22139/40 of SUR CSTM SF to BJP/GDG/BAY side with increased CC, with mutual consent f both swr and cr , as the stretch dsnt have a connectivity to Mumbai baring a weekly and a passenger. and for maintanence purpose RSA can be established with a suitable partner or can be maintained at CSTM.

  
3258 views
Jan 20 2017 (18:29)
SLA   1013 blog posts
Re# 2125396-17            Tags   Past Edits
Instead of 06.00hrs where there is 57660 passenger, 07.30hrs or 08.00hrs ex.HYB would be better and in return it can start ex.GR at 15.30hrs to reach HYB at 20.30hrs or as suggested by you.
Page#    Showing 1 to 10 of 297 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site