Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Mar 24, 2017 18:16:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Mar 24, 2017 18:16:59 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1476321-84
Details Edit
Large Station Board;
Entry# 1625120-0
Details Edit
Large Station Board;
Entry# 1920248-0
Details Edit
Large Station Board;
Entry# 1998873-0

HSR/Hisar Junction (6 PFs)
     हिसार जंक्शन

Track: Single Diesel-Line

Jn. Point - BNW/SDLP/BTI/JHL Railway Rd, Hisar
State: Haryana

Elevation: 212 m above sea level
Zone: NWR/North Western   Division: Bikaner
No Recent News for HSR/Hisar Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 6
Number of Halting Trains: 27
Number of Originating Trains: 13
Number of Terminating Trains: 13
Rating: 4.1/5 (56 votes)
cleanliness - excellent (7)
porters/escalators - good (7)
food - good (7)
transportation - excellent (7)
lodging - good (7)
railfanning - good (7)
sightseeing - good (7)
safety - good (7)

Nearby Stations

RPHR/Raipur Hariyana Junction 5 km     NKN/Nyoli Kalan 10 km     STD/Satrod 11 km     DNX/Dhansu 12 km     MAYR/Mayar 15 km     JKHI/Jakhod Khera 16 km     BFN/Bugana 18 km     CRW/Charaud 19 km     HNS/Hansi 23 km     BVZ/Naloi Barwa 25 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 163 blog entries  next>>
  
Extension needed upto HSR/Hisar Junction.

9 posts - Wed Mar 15, 2017

  
789 views
Mar 15 2017 (13:28)
✩✩✩ Parmeshwar Jat✩✩✩   1107 blog posts   140 correct pred (70% accurate)
Re# 2198174-10            Tags   Past Edits
Mere khud ke bhai h wo JP or BKN jakr train pkdte h bengluru ki.

  
791 views
Mar 15 2017 (13:30)
22481 जोधपुर दिल्ली सराय रोहिल्ला एक्सप्रेस^~   2965 blog posts   255 correct pred (53% accurate)
Re# 2198174-11            Tags   Past Edits
Agar is ko HSR tak kar de to bahut passenger aayenge is train me.

  
778 views
Mar 15 2017 (13:30)
✩✩✩ Parmeshwar Jat✩✩✩   1107 blog posts   140 correct pred (70% accurate)
Re# 2198174-12            Tags   Past Edits
Jarurat h bhai. Pura section suna pda rhta hai.......q ki yha ke log aawaz nhi uthate kbhi....sidhe saade h.
Yha ke log jyadatr Surat, Bengluru, and south me hi job krte hai.

  
Bilkul needed hai.. Totally Agree

  
Yes
  
Rail Fanning
0 Followers
1085 views
Mar 13 2017 (11:45)   12555/Gorakhdham SF Express (PT) | HSR/Hisar Junction (6 PFs) | KYN/WDG-4/12763

ALI™~   1155 blog posts   2134 correct pred (66% accurate)
Entry# 2195953            Tags   Past Edits
One of the first ISO 9001:2015 Certified 12555/56 Gorakhdham Sup Exp standing at @HisarJunction @sureshpprabhu @drmbikaner @gmner_gkp click here

  
891 views
Mar 13 2017 (20:34)
हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Re# 2195953-1            Tags   Past Edits
Thanku bhai mera tweet share krne ke lie... IRI pr bhi post kia h
/blog/post/2195228

  
897 views
Mar 13 2017 (20:38)
ALI™~   1155 blog posts   2134 correct pred (66% accurate)
Re# 2195953-2            Tags   Past Edits
Yes bro...
  
★★  Rail Fanning
0 Followers
1272 views
Mar 12 2017 (17:21)   12556/Gorakhdham SF Express | HSR/Hisar Junction (6 PFs) | KYN/WDG-4/12763

हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Entry# 2195228            Tags   Past Edits
ONE of The First ISO 9001 Certified Train 12555/56 GORAKHDHAM SUPERFAST EXP Lead by "HOLI SPECIAL LINK" KYN/WDG4/12763 Refreshing at #Hisar Junction !!
" It Is One Of The First ISO 9002 Certified Trains Of India, To Be Introduced, Because Of Its Security Features and High Priority In, Indian Railways Network"-Wiki

  
1121 views
Mar 12 2017 (17:27)
▀▄▀▄▀▄ αиιкєт ▄▀▄▀▄▀~   4457 blog posts   331 correct pred (65% accurate)
Re# 2195228-1            Tags   Past Edits
It's 9001:2015 ISO certified train.

  
1096 views
Mar 12 2017 (17:32)
हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Re# 2195228-2            Tags   Past Edits
I think on wiki it is wrong !!

  
1160 views
Mar 12 2017 (19:15)
Abhishek Jaiswal*^~   45163 blog posts   18369 correct pred (70% accurate)
Re# 2195228-3            Tags   Past Edits
Finally they have implemented my suggestion of adding iso tag on train board :) Take a look at @abhie_jaiswal's Tweet: click here
Excellent captures.

  
884 views
Mar 13 2017 (00:43)
GKP LKO Section 120kmph Sucessful Trail Done~   2659 blog posts   5 correct pred (100% accurate)
Re# 2195228-4            Tags   Past Edits
Nice click😊👍
  
★★★  Info Update
Dec 03 2015 (21:50)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Entry# 1669885            Tags   Past Edits
Finally!! Got up early and planned a short trip to Rewari to providing you latest updates on RE-MHU-HSR #Electrification & #Doubling.
Board train : 54835 (HSR-RE PXGR)
Return Board train :59721 (JP-HSR FAST PXGR)
Highlights : ( Statics are in % & acc to my data )
◆◆Doubling
...
more...

●RE-KSI work almost done 99% including track laying,linking and signalling. 1% remainedmained for track linking.
●KSI-MHU work for track laying & linking is done almost 60%.Levelling work done 80%.Remaining work left 20%.
◆◆◆Overall work done 65-70%
◆◆Electrification
●Railway is setting up TSS at STD & RE
●RE-KSI work for pole basic structure is complete on both side (up-dwn) . Pole erected 70%.
●KSI-MHU work for pole basic structure is in progress
●MHU-HSR work for pole basic structure completed till Hansi (HNS) (50KM).
Pole have been erected from MHU to in between BWK-JKZ (35KM).
Wiring & OHE Eqip have been completed till BWN (14KM)
●●Work for Plateforms including increase in height and 2nd platefrom are in progress till BWK.
KSI will now have 3 Plateforms currently only have single.
●● Today i saw heavy load on RE-HSR track met with 10 WDG with 10 different Goods and Coal train
◆◆◆ IMP NEWS: RAILWAY is CONSTRUCTES A BY-PASS LINE TO IGNORE REWARI UNDER WDFC WHICH CONNECT RE-HSR SECTION TO RE-FL SECTION UNDER WDFC. A GREAT RELIEF !! (this is not confirmed news ...but i am informing you as i saw rly constructing bridge and other work just 10km before rewari on HSR-RE section)
Today's Blog Upload
●Doubling
●Electrification
●HSR-RE Pxgr - 54835
●JP-HSR Fast Pxgr - 59721
●DEE-BDTS GR - 12215
●BDTS-DEE GR - 12216
●SLN-ADI Exp - 19404
●VARIOUS WDG LOCO PICS
●Various Station pics
#Hisar

27 posts - Dec 2015

1 posts - Jan 2016

2 posts - Feb 2016

28 posts - Mar 2016

4 posts - Apr 2016

1 posts - May 2016

5 posts - Jul 2016

3 posts - Aug 2016

16 posts - Sep 2016

3 posts - Oct 2016

16 posts - Nov 2016

2 posts - Dec 2016

1 posts - Jan 2017

1 posts - Thu Mar 02, 2017

5 posts - Mon Mar 06, 2017

  
996 views
Mar 06 2017 (14:27)
bti jhl without cross~   332 blog posts   3 correct pred (80% accurate)
Re# 1669885-121            Tags   Past Edits
tum meri bat samaj nhi rahe

  
994 views
Mar 06 2017 (14:32)
HAPPY COLORFULL HOLI FROM JBP ET OHE OMG 😲~   11880 blog posts   21 correct pred (42% accurate)
Re# 1669885-122            Tags   Past Edits
Samjhao bhai phr

  
907 views
Mar 07 2017 (11:19)
हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Re# 1669885-123            Tags   Past Edits
Acc to tweet....it is commissioned...so all done

  
810 views
Mar 07 2017 (13:17)
bti jhl without cross~   332 blog posts   3 correct pred (80% accurate)
Re# 1669885-124            Tags   Past Edits
ok sir g

  
503 views
Mar 12 2017 (09:16)
हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Re# 1669885-125            Tags   Past Edits
Update !! First eloco on section WAG 5 /JHANSI
  
★  Rail Fanning
0 Followers
1701 views
Feb 20 2017 (18:11)   HSR/Hisar Junction (6 PFs) | PTRU/WDG-3A/13531

हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Entry# 2172022            Tags   Past Edits
#ScienceExpress lead by 13531/PTRU/WDG 3A standing on Plateform No. 6 at #HisarJunction
1- PTRU/WDG 3A/13531
2- Science Express
3-TB of Science Express
4- Solar Pannel fitted coaches of #ScienceExpress
...
more...

5- Train standing on PF 6 of Hisar

  
1289 views
Feb 20 2017 (18:35)
Mukesh   21 blog posts
Re# 2172022-1            Tags   Past Edits
I think common problem with NWR Stations is
Lack of facilities even proper flooring...
However, most of them seem cleaner than their eastern counterparts.
Churu Jn.

  
1198 views
Feb 20 2017 (19:01)
रोहित सिंह मुंदालिया   386 blog posts   429 correct pred (66% accurate)
Re# 2172022-2            Tags   Past Edits
Hisar station have proper platform but shed not covering whole platform

  
1148 views
Feb 20 2017 (19:10)
Mukesh   21 blog posts
Re# 2172022-3            Tags   Past Edits
I know, what about flooring?
Same problem is for almost all of NWR stations...
SDLP has only 3 PF despite being junction of four lines.

  
1158 views
Feb 20 2017 (19:35)
रोहित सिंह मुंदालिया   386 blog posts   429 correct pred (66% accurate)
Re# 2172022-4            Tags   Past Edits
Proper flooring bhi hin

  
985 views
Feb 28 2017 (11:43)
bti jhl without cross~   332 blog posts   3 correct pred (80% accurate)
Re# 2172022-5            Tags   Past Edits
when u upload video?
  
★★  Info Update
0 Followers
2779 views
Feb 16 2017 (15:26)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Entry# 2166780            Tags   Past Edits
Hisar-Jakhal #Electrification (Part of MTJ-AWR-RE-HSR-JHL-DUI-LDH Elect.)(where RE-HSR-LDH is on High Rise being feeder route for WDFC) Update !!

Digging work almost completed (source-RF from Jakhal)
Poles being erected on the section
Photo
...
more...
: Poles erected at Hisar on Hisar-Jakhal Section !!

6 posts - Fri Feb 17, 2017

  
2116 views
Feb 17 2017 (19:45)
bti jhl without cross~   332 blog posts   3 correct pred (80% accurate)
Re# 2166780-7            Tags   Past Edits
tell abt doubt?

  
2013 views
Feb 17 2017 (21:50)
हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Re# 2166780-8            Tags   Past Edits
Is saal me eloco bahut muskil hai...kuki abi to hsr-re complete me oct -nov lag jayega !

  
1961 views
Feb 18 2017 (10:30)
bti jhl without cross~   332 blog posts   3 correct pred (80% accurate)
Re# 2166780-9            Tags   Past Edits
ok, but bti rok par jrur start ho jayega

  
1911 views
Feb 18 2017 (13:32)
हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Re# 2166780-10            Tags   Past Edits
Rok-JHL tk ho ajyega ..but BTI dun knw....BTI tk structure bn gye qa ?

  
1031 views
Mar 03 2017 (12:01)
bti jhl without cross~   332 blog posts   3 correct pred (80% accurate)
Re# 2166780-11            Tags   Past Edits
  
General Travel
0 Followers
700 views
Feb 22 2017 (21:38)   HSR/Hisar Junction (6 PFs)

Kirti~   4191 blog posts   1670 correct pred (60% accurate)
Entry# 2174722            Tags   Past Edits
Source - @Science_Express @hisar good response day 03
80 schools approx 4000 students and 400 teachers @drmbikaner @RailMinIndia @IndiaDST @moefcc
Twitter
  
Info Update
0 Followers
1353 views
Feb 10 2017 (14:44)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Entry# 2158843            Tags   Past Edits
WELL IF IT IS TRUE THAN IT'S A GREAT NEWS FOR US !! WOOHOO !! 😉😄😄😁😁 BUT HOW IT WILL GO VIA HSR TO BKN !!
  
General Travel
0 Followers
1030 views
Feb 17 2017 (21:39)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन   1087 blog posts   11 correct pred (58% accurate)
Entry# 2168608            Tags   Past Edits
9th phase of exhibition train Science Express-Climate Action Spl"will arrive &stable at HSR from 20.2.17 to 23.2.17 !!
Source : twitter
  
Info Update
0 Followers
5055 views
Jan 24 2017 (10:19)   JHL/Jakhal Junction (3 PFs)

Ludhiana dhuri jakhal hisar track needs doubling~   440 blog posts   9 correct pred (53% accurate)
Entry# 2138150            Tags   Past Edits
Update on #electrification of ludhiana-dhuri-jakhal-hisar railway track. Work is expected to be complete by dec. 2017.

11 posts - Jan 2017

2 posts - Wed Feb 08, 2017

  
2365 views
Feb 09 2017 (19:56)
Ludhiana dhuri jakhal hisar track needs doubling~   440 blog posts   9 correct pred (53% accurate)
Re# 2138150-20            Tags   Past Edits
ludhiana to kila raipur doubling has been sanctioned.

  
2295 views
Feb 09 2017 (22:51)
Ashwani Mittal   26 blog posts
Re# 2138150-21            Tags   Past Edits
when will start the work?

  
2214 views
Feb 10 2017 (10:12)
Ludhiana dhuri jakhal hisar track needs doubling~   440 blog posts   9 correct pred (53% accurate)
Re# 2138150-22            Tags   Past Edits
abhi to sanction hua hai lets see kb start hota 1 saal ke bheetar hona to chahiye.

  
1911 views
Feb 16 2017 (22:31)
bti jhl without cross~   332 blog posts   3 correct pred (80% accurate)
Re# 2138150-23            Tags   Past Edits
Electric loco WAG 7 arrived first time at JIND jn for trial and trial successful.(on 16/02/2017-9:30)

  
1798 views
Feb 17 2017 (19:52)
Ludhiana dhuri jakhal hisar track needs doubling~   440 blog posts   9 correct pred (53% accurate)
Re# 2138150-24            Tags   Past Edits
wow thats the great news.
Page#    Showing 1 to 10 of 163 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site