Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri May 26, 2017 21:03:04 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri May 26, 2017 21:03:04 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 810404-0

IAA/Indara Junction (4 PFs)
اندارا جنکشن     इन्दारा जंक्शन

Track: Construction - Doubling+Electrification

Indara ,Mau
State: Uttar Pradesh

Elevation: 74 m above sea level
Zone: NER/North Eastern   Division: Varanasi
No Recent News for IAA/Indara Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 4
Number of Halting Trains: 34
Number of Originating Trains: 4
Number of Terminating Trains: 4
Rating: /5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Nearby Stations

CKYD/Chakra Road 6 km     KPJ/Kopaganj 7 km     HLP/Haldharpur 7 km     MAU/Mau Junction 8 km     KER/Kiriharapur 14 km     PNRA/Paniara 14 km     PLGH/Paligarh 15 km     RTP/Ratanpura 15 km     GSI/Ghosi 18 km     PPH/Pipri Dih 19 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 26 blog entries  next>>
  
General Travel
0 Followers
2225 views
May 17 2017 (18:06)   GNT/Guntur Junction (7 PFs)

Iri rules are different in different cases^~   81830 blog posts   5226 correct pred (78% accurate)
Entry# 2280565            Tags   Past Edits
Ministry of Railways17-May, 2017 16:30 IST
Cabinet approves construction of double line with electrification between Guntur-Guntakal in Andhra Pradesh
.
Cabinet approves construction of electrified third line between Manmad-Jalgaon in Maharashtra
.
Cabinet
...
more...
approves construction of electrified doubling line between Phephana-Indara and Mau-Shahganj in Uttar Pradesh

2 posts - Wed May 17, 2017

2 posts are hidden.

  
1295 views
May 18 2017 (18:16)
nawabjubair   76 blog posts
Re# 2280565-6            Tags   Past Edits
nandyal also

  
1110 views
May 19 2017 (19:12)
MI nailed the RPS💟💟💕~   912 blog posts   61 correct pred (69% accurate)
Re# 2280565-7            Tags   Past Edits
Do u know that abt this section

  
1048 views
May 19 2017 (19:36)
BRC WAP 7~   663 blog posts   727 correct pred (78% accurate)
Re# 2280565-8            Tags   Past Edits
IR must do doubling of MAHESANA- PALANPUR and KATIHAR - MUKURIA
With high pace

  
884 views
May 20 2017 (06:48)
Hx Bza Penna Express~   304 blog posts
Re# 2280565-9            Tags   Past Edits
It is not idiotic section it is historic section connecting Bezawada with Marmagoa opened in 1888-90 Mr.....

  
777 views
May 20 2017 (13:09)
Litti Chokha   196 blog posts
Re# 2280565-10            Tags   Past Edits
"idiotic section" 😂 😂 😂 😂 😂 correctly said.
  
General Travel
0 Followers
248 views
May 18 2017 (07:33)   IAA/Indara Junction (4 PFs)

यन्त्रविन्यासYantravinyas   19754 blog posts   427 correct pred (89% accurate)
Entry# 2280976            Tags   Past Edits
thank You CCEA for clearing doubling of Indara-Phepna
Like this section
  
★★★  Race Blog
1 Followers
35772 views
Jan 21 2016 (16:59)   02417/Mahamana Express Inaugural Special | BSB/Varanasi Junction (9 PFs)
 

यन्त्रविन्यासYantravinyas   19754 blog posts   427 correct pred (89% accurate)
Entry# 1717327            Tags   Past Edits
********महामना सुपरफास्ट उद्घाटन विशेष एक्सप्रेस *********
***********जौनपुर सुल्तानपुर कि शान *************
============वाराणसी - नई दिल्ली ============
************ Duty chart is out***************
-------------------------------------------------- ---------------
OSD____________________Shiv
...
more...
Kumar Mishra**
LP______________________Mohd Arif**
ALP_____________________Harsh Khatri**
TLP_____________________Prakshya**
RDSO official______________Mridul**
Guard___________________Yantravinyas
Special Invitee____________Amit Singh**
NR LKO Controller__________Twesh
NR MB Controller___________Sajjad**
NR DLI Controller __________Farhan
Section Engineer___________Rohit Kumar Singh(BSB-LKO)
Section Engineer___________Atharva Yadav(LKO-MB)
Section Engineer___________Aman srivastav(MB-NDLS)
TTE-1AC__________________Koush
TTE-2AC__________________Abhishek P Vats
TTE-SL___________________Divyanshu Gupta
OBHS____________________Sparsh D Sharma
AC attendant______________Gaurav NFR
we wish all happy prosperous and safe journey:)

516 posts - Sat Jan 23, 2016

  
16918 views
Jan 23 2016 (14:46)
MB DIVISION NEEDS 150 d~   245 blog posts
Re# 1717327-538            Tags   Past Edits
Hmmmm.... Bhai ye duty chart mein loco pilot aur alp ye aapne kyo bnayya
Means for fun meij lp ka samjh ni aa ra mere

  
17949 views
Feb 15 2016 (01:03)
MB DIVISION NEEDS 150 d~   245 blog posts
Re# 1717327-552            Tags   Past Edits
Sir can u plz tell methat
What is the highest speed achieved by CRS during the MB-GZB ROUTE SPEED TRIAL...
PLZ IF U CAN THEN GIVE ME THE NEWS LINK...

  
17780 views
Feb 15 2016 (02:42)
lipstick spoiler~   1921 blog posts   19 correct pred (79% accurate)
Re# 1717327-553            Tags   Past Edits
I think its 150 but I have read on a blog it is 180.

  
17670 views
Feb 15 2016 (11:32)
MB DIVISION NEEDS 150 d~   245 blog posts
Re# 1717327-554            Tags   Past Edits
Plz can u give the blog link

  
17561 views
Feb 15 2016 (22:25)
12238 Begampura Express~   914 blog posts   32 correct pred (74% accurate)
Re# 1717327-555            Tags   Past Edits
During speed trial it was 120 km/h and during electrification trial it was 115 km/h
  
★  General Travel
0 Followers
12990 views
Nov 11 2016 (10:35)   GKP/Gorakhpur Junction (10 PFs)

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   13437 blog posts   3052 correct pred (65% accurate)
Entry# 2055965            Tags   Past Edits
Tender -
Gonda- Burhwal 3rd Railway Line Project
Mau -Shahganj Doubling
Kushmi-Gorakhpur-Domingarh 3rd Line
Indara- Dohrighar #gc
Bahraich
...
more...
- Mailani #gc

4 posts - Sat Nov 12, 2016

  
11539 views
Nov 12 2016 (18:17)
Aditya Immortal ™ ©~   3101 blog posts   186 correct pred (54% accurate)
Re# 2055965-5            Tags   Past Edits
GKP -JEA Doubling ka tender kab nikle ga any News ....

  
11732 views
Nov 12 2016 (18:19)
Aditya Immortal ™ ©~   3101 blog posts   186 correct pred (54% accurate)
Re# 2055965-6            Tags   Past Edits
Any news for bypass ,agar bnega bhe to usko abhi time hai....

  
11529 views
Nov 12 2016 (18:39)
Aditya Immortal ™ ©~   3101 blog posts   186 correct pred (54% accurate)
Re# 2055965-7            Tags   Past Edits
BTT bypass ka kya hua uski koi news...

  
11539 views
Nov 13 2016 (10:22)
BaBa Ji~   172 blog posts
Re# 2055965-8            Tags   Past Edits
BTT bypass ka tender bahut pehle ho chuka hai...I think 6 months ho gye tender huye..according to DRM BSB work will start soon.

  
5176 views
Feb 23 2017 (07:03)
12952 नई दिल्ली मुंबई राजधानी back to IRI~   6509 blog posts   343 correct pred (78% accurate)
Re# 2055965-9            Tags   Past Edits
Ye to bahut achha GKP skip hona bhi chahiye.
  
★  Rail Fanning
0 Followers
1331 views
Dec 09 2016 (12:22)   72203/Indara - Dohrighat MG Rail Bus | IAA/Indara Junction (4 PFs)

Watching Sachin a Billion Dream^~   34388 blog posts   28151 correct pred (78% accurate)
Entry# 2085267            Tags   Past Edits
Capture for the First Time the Meter Gauge Rail Bus
Indara-Dohrighat Meter Rail Bus...
BG works will begin soon on this section.....
#thinkDKG

  
1262 views
Dec 09 2016 (12:23)
JBP ET OHE OMG 😲 SUPPORTS KKR 😎~   12815 blog posts   22 correct pred (42% accurate)
Re# 2085267-1            Tags   Past Edits
Great finding

  
1289 views
Dec 09 2016 (12:24)
Watching Sachin a Billion Dream^~   34388 blog posts   28151 correct pred (78% accurate)
Re# 2085267-2            Tags   Past Edits
dream rha h isme travel krna but aaj tk nhi kr paya

  
1216 views
Dec 09 2016 (12:38)
JBP ET OHE OMG 😲 SUPPORTS KKR 😎~   12815 blog posts   22 correct pred (42% accurate)
Re# 2085267-3            Tags   Past Edits
सबकी इच्छा है यार

  
1251 views
Dec 09 2016 (12:39)
Watching Sachin a Billion Dream^~   34388 blog posts   28151 correct pred (78% accurate)
Re# 2085267-4            Tags   Past Edits
ab dekho kb ghumte h
  
Site-Related
0 Followers
1921 views
Nov 18 2016 (00:02)   IAA/Indara Junction (4 PFs)

Watching Sachin a Billion Dream^~   34388 blog posts   28151 correct pred (78% accurate)
Entry# 2063642            Tags   Past Edits
kindly update Doubling-electrification work IAA-PEP
#atlas monitor...

  
1820 views
Nov 18 2016 (00:06)
IR no more Safe^~   21743 blog posts   97661 correct pred (75% accurate)
Re# 2063642-1            Tags   Past Edits
source of info ?

  
1800 views
Nov 18 2016 (00:18)
Watching Sachin a Billion Dream^~   34388 blog posts   28151 correct pred (78% accurate)
Re# 2063642-2            Tags   Past Edits
23/10/2016
मनोज सिन्हा ने रविवार को फेफना-इंदारा व मऊ-शाहगंज रेलखंड के दोहरीकरण व विद्युतीकरण कार्य का शिलान्यास किया।
मऊ-शाहगंज ka update dia hua h budget k announce hone k baad se but aage ka nhi dia hua h
so update it

  
1796 views
Nov 18 2016 (00:22)
IR no more Safe^~   21743 blog posts   97661 correct pred (75% accurate)
Re# 2063642-3            Tags   Past Edits

  
1801 views
Nov 18 2016 (00:23)
Watching Sachin a Billion Dream^~   34388 blog posts   28151 correct pred (78% accurate)
Re# 2063642-4            Tags   Past Edits
dhanyawaad
  
★  Info Update
0 Followers
6659 views
Oct 20 2016 (16:29)   IAA/Indara Junction (4 PFs)
 

GKP DIT New Line ROUTE MAP READY~   283 blog posts   15 correct pred (64% accurate)
Entry# 2030366            Tags   Past Edits
Notification of foundation stone laying of gauge conversion of Indara-Dohrighat section
at Indara Junction on 20/10/2016 at 12:PM

  
Oct 20 2016 (19:13)
GKP DIT New Line ROUTE MAP READY~   283 blog posts   15 correct pred (64% accurate)
Re# 2030366-2            Tags   Past Edits
Great…….
Varanasi division of NER is now Meter Gauge free.
Kudos to railways……
Map courtesy to Twitter post - click here

  
5688 views
Oct 23 2016 (13:57)
12952 नई दिल्ली मुंबई राजधानी back to IRI~   6509 blog posts   343 correct pred (78% accurate)
Re# 2030366-6            Tags   Past Edits
IZN Div is also on its way.
  
Info Update
0 Followers
4511 views
Oct 23 2016 (09:20)   PEP/Phephna Junction (1 PFs)
 

Saurabh*^~   8761 blog posts   3328 correct pred (73% accurate)
Entry# 2033198            Tags   Past Edits
Foundation Stone Laying of Phephna - Indara & Mau - Shahganj Doubling and Electrification.
  
General Travel
0 Followers
2598 views
Oct 20 2016 (17:34)   IAA/Indara Junction (4 PFs)
 

shuk RAILWAY is my first crush~   612 blog posts   320 correct pred (57% accurate)
Entry# 2030454            Tags   Past Edits
Railways laid the foundation of Indara-Dohrighat (IAA-DIT) gauge conversion at Indara on 20th October
  
Info Update
0 Followers
2475 views
Oct 19 2016 (21:41)   IAA/Indara Junction (4 PFs)
 

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   13437 blog posts   3052 correct pred (65% accurate)
Entry# 2029571            Tags   Past Edits
माननीय रेल राज्य मंत्री एवं संचार राज्य मंत्री (स्वतंत्र प्रभार), भारत सरकार श्री मनोज सिन्हा द्वारा पूर्वोत्तर रेलवे के वाराणसी मंडल के अन्तर्गत इन्दारा-दोहरीघाट मीटर गेज रेल खण्ड के आमान परिवर्तन का शिलान्यास 20 अक्टूबर, 2016 को इन्दारा जं. स्टेशन पर आयोजित एक समारोह में दोपहर 12.00 बजे किया जायेगा। इस अवसर पर माननीय सांसद श्री राज नारायण राजभर, माननीय सदस्य विधान सभा श्री सुधाकर सिंह तथा माननीय सदस्य विधान परिषद श्री राम जतन राजभर सहित जनप्रतिनिधिगण, पूर्वोत्तर रेलवे के महाप्रबन्धक श्री राजीव मिश्र, वरिष्ठ रेल अधिकारी, कर्मचारी एवं क्षेत्रीय जनता उपस्थित रहेगी।
Another NER section closed for GC #GCNER
Page#    Showing 1 to 10 of 26 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site