Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jun 29, 2017 14:52:39 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jun 29, 2017 14:52:39 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 801853-0
Details Edit
Front Entrance - Outside; Large Station Board;
Entry# 2301184-0

CLG/Kahalgaon (2 PFs)
كهلگاو     कहलगांव

Track: Construction - Doubling+Electrification

Bhagalpur
State: Bihar

Elevation: 44 m above sea level
Zone: ER/Eastern   Division: Malda Town
No Recent News for CLG/Kahalgaon
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 38
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 3.8/5 (15 votes)
cleanliness - good (2)
porters/escalators - good (2)
food - excellent (1)
transportation - good (2)
lodging - good (2)
railfanning - good (2)
sightseeing - good (2)
safety - good (2)

Nearby Stations

EKC/Ekchari 4 km     BKSL/Bikram Shila 8 km     GGA/Ghoga 10 km     SVRP/Shivanarayanpur 11 km     LKB/Lakshmipur Bhorang 14 km     LMM/Lailakh Mamalkha 16 km     PPT/Pirpainti 20 km     SBO/Sabaur 23 km     AMPL/Ammapali 25 km     MZC/Mirza Cheuki 29 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 14 blog entries  next>>
  
General Travel
0 Followers
388 views
May 31 2017 (10:24)   CLG/Kahalgaon (2 PFs)

मुंगेर पूल पर ट्रेन दो~   479 blog posts   456 correct pred (56% accurate)
Entry# 2301184            Tags   Past Edits
#sb pic
  
Info Update
0 Followers
3163 views
Mar 12 2017 (13:44)   PPT/Pirpainti (2 PFs)

4πu¶am*^~   5966 blog posts   42386 correct pred (87% accurate)
Entry# 2195063            Tags   Past Edits
Pirpainti-Kahalgaon newly doubled section's CRS inspection on 15.03.2017

4 posts - Thu Mar 16, 2017

4 posts - Fri Mar 17, 2017

  
1780 views
Mar 17 2017 (07:42)
4πu¶am*^~   5966 blog posts   42386 correct pred (87% accurate)
Re# 2195063-9            Tags   Past Edits
No idea.
2014 ke baad hum udhar kbhi nhi gye.
SBG/BGP ke RFs aapko bata sakte hain iss baare mein.

  
2046 views
Mar 17 2017 (15:21)
mksald123   568 blog posts   7 correct pred (58% accurate)
Re# 2195063-10            Tags   Past Edits
From Bhagalpur to lailakh 14 km, we can expect completion upto 31 Mar 18 but from lailakh to kahalgaon 16 km there are many major bridges specially the one just before kahalgaon from west, that is called kaua naala. This 16 km stretch is much prone to floods and work here can't be done simply by levelling soil, putting gitti and then sleepers and tracks.
Here, first a 15- 25 feet layer of soil to be laid with arrangements of soil erosion from both sides, which will take time along with above mentioned major pools and very difficult to complete before 31 Mar 18.

  
1750 views
Mar 18 2017 (08:36)
Aditya*^~   4428 blog posts   2416 correct pred (69% accurate)
Re# 2195063-11            Tags   Past Edits
by when SBG - BGP doubling is expected to get completed ?
by when BGP - JMP doubling is expected to get completed ?

  
1747 views
Mar 18 2017 (11:18)
mksald123   568 blog posts   7 correct pred (58% accurate)
Re# 2195063-12            Tags   Past Edits
Sbg - Bgp total 71 KMS
Sbg - Ppt 21 KMS already trains running on double line ( 01 up & 01 down)
Ppt - Clg 20 KMS CRS completed, we can expect trains running on 2nd line by May 17.
Clg- Lmm 16 km will take time ( may be two years/ upto Jan Feb 19)
Lmm
...
more...
- Bgp 14 KMS is expected by Dec 17 to Mar 18.
As far as JMP - BGP is concerned only 3kms patch remains near JMP east end due to the mountain.
Out of that there is no problem with 2 KMS approach which can be made very easy once tunnel inside mountain is made.
But neither IR nor local leadership and rail administration is serious about this.
Isse bhi chaure chaure aur bhayankar pahaar Kalyan Igatpuri Nasik section me hai 500 mtrs wide aur wo bhi 4-4 5-5 Lekin kyoki waha IR ka interest jyada hai isliye aise 10- 12 tunnel bane hai.
Aur Yaha 1862 me jab India ki pahli long railway line (Sahibganj loop) angrejo ne banayi thi to unhonehi ye tunnel banaya Lekin 155 years Baad bhi 300 mtrs ek aur tunnel khodke double line banane ka full fledge interest hi nahi hai.
Kahte hai koi company iss project Ko accept hi nahi kar Rahi.
Interest hai to daam badhau aur foreign ki company Ko tender do, three months me tunnel ban jayega.

  
1616 views
Mar 18 2017 (12:27)
Aditya*^~   4428 blog posts   2416 correct pred (69% accurate)
Re# 2195063-13            Tags   Past Edits
for any work to complete it require more mental resolve than money or muscle power. and in our generation mental resolve is missing.
  
★  General Travel
0 Followers
3434 views
Jan 28 2017 (09:15)   13409/Malda Town - Jamalpur Intercity Express (UnReserved) | CLG/Kahalgaon (2 PFs) | HWH/WDM-3A/16040

DHN needs New Trains~   4845 blog posts   348 correct pred (63% accurate)
Entry# 2143039            Tags   Past Edits
1 compliments
Nice pics
MLDT-JMP Intercity Express led by Howrah WDM 3A 16040 overtook my 13403 Vananchal Express @CLG...
Pictures are blurry as taken inside from the coach!!

  
3174 views
Jan 29 2017 (11:02)
mksald123   568 blog posts   7 correct pred (58% accurate)
Re# 2143039-1            Tags   Past Edits
Nice pictures!
Kindly post updates on pirpainti kahalgaon and sabour ghogha lailak doubling

  
3155 views
Jan 29 2017 (11:32)
DHN needs New Trains~   4845 blog posts   348 correct pred (63% accurate)
Re# 2143039-2            Tags   Past Edits
Only 2nd over bridge are being made!!!
No tracks are being laid out...

  
3018 views
Jan 29 2017 (13:03)
mksald123   568 blog posts   7 correct pred (58% accurate)
Re# 2143039-3            Tags   Past Edits
Ok, Thanks
  
General Travel
0 Followers
7849 views
Oct 22 2016 (13:48)   BGP/Bhagalpur Junction (6 PFs)
 

SBG Loop~   531 blog posts   10 correct pred (50% accurate)
Entry# 2032503            Tags   Past Edits
Another tender wrt electrification of BHW-SBG-JMP-KIUL section. Hopefully, everything ends as per schedule.
  
Social
0 Followers
2818 views
Sep 02 2016 (09:36)   CLG/Kahalgaon (2 PFs)
 

SBG Loop~   531 blog posts   10 correct pred (50% accurate)
Entry# 1978837            Tags   Past Edits
कहलगांव में रेल बनी चारा ट्रेन। जागरणकहलगांव में रेल बनी चारा ट्रेन।
Source: click here

  
2503 views
Sep 04 2016 (12:47)
™Smart City Bhagalpur ®~   1164 blog posts   21 correct pred (78% accurate)
Re# 1978837-1            Tags   Past Edits
Hadd hogai ye to

  
1963 views
Sep 24 2016 (08:18)
SBG Loop~   531 blog posts   10 correct pred (50% accurate)
Re# 1978837-2            Tags   Past Edits
Another One
Source: click here
Page#    Showing 1 to 5 of 14 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.