Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jan 23, 2017 08:04:49 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jan 23, 2017 08:04:49 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search

KBJ/Kantabanji (2 PFs)
କଣ୍ଟାବାଞ୍ଝି     कांटाबांजी

Track: Construction - Diesel-Line Doubling

Bolangir
State: Odisha

Elevation: 304 m above sea level
Zone: ECoR/East Coast   Division: Sambalpur
No Recent News for KBJ/Kantabanji
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 38
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 2.7/5 (23 votes)
cleanliness - average (3)
porters/escalators - average (2)
food - average (3)
transportation - average (3)
lodging - average (3)
railfanning - average (3)
sightseeing - good (3)
safety - average (3)

Nearby Stations

TRKR/Turekala Road 13 km     MRBL/Muribahal 16 km     HSK/Harishanker Road 23 km     RNBT/Rahenbata 25 km     TIG/Titlagarh Junction 33 km     LKNA/Lakhna 39 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 15 blog entries  next>>
  
General Travel
0 Followers
11529 views
Oct 21 2016 (12:40)   JRC/Jalandhar Cantt. Junction (3 PFs)

WAP7   75 blog posts
Entry# 2031336            Tags   Past Edits
22706 Jammu Tawi - Tirupati Humsafar Express should be diverted Via Katni, R, VSKP & BZA instead of the circuitous route from WL i.e, Via SC, RC, AD & GTL

5 posts - Fri Oct 21, 2016

  
10907 views
Oct 21 2016 (15:49)
Venkat వెంకట్   1632 blog posts
Re# 2031336-6            Tags   Past Edits
even via VSKP it will circular.
We need it via BZA, WL with almost a slot like MAS raj from BZA to NDLS

  
10876 views
Oct 21 2016 (16:26)
WAP7   75 blog posts
Re# 2031336-7            Tags   Past Edits
if it is via vskp it will cover all 3 major cities ..

  
10927 views
Oct 21 2016 (16:37)
RCF Kapurthala in February^~   28015 blog posts   22255 correct pred (75% accurate)
Re# 2031336-8            Tags   Past Edits
From north there is no connectivity to Hyderabad but we have connectivity to VSKP via Hirakud so train route is ok

  
10891 views
Oct 21 2016 (16:53)
SCR Godavari Express~   2353 blog posts   11 correct pred (91% accurate)
Re# 2031336-9            Tags   Past Edits
This train/rake belongs to GTL div..so it was given that route and stops are also given like that.. if it runs Via VSKP.. it cannot cover GTL div and more over it will be more circuitous....so no way possible..

  
7280 views
Nov 16 2016 (10:09)
deepakyerr~   695 blog posts
Re# 2031336-10            Tags   Past Edits
What is the use of connecting cities when already AP AC connects Vskp BZA sections. Just think who I'll be interested to travel from tirupati NLR via vskp raipur whichbus circuitous route when you they are trains running in lesser routes.
  
★  General Travel
0 Followers
17398 views
Apr 12 2016 (08:46)   22847/Visakhapatnam - Mumbai LTT SF Express | LTT/Lokmanya Tilak Terminus (5 PFs)
 

WAP7   75 blog posts
Entry# 1799556            Tags   Past Edits
I had travelled by the 22847 LTT Express from Visakhapatnam to Mumbai. The train was filled to capacity and wait listed passengers had also boarded this train in the down stations at Bobbili, Rayagada, Titlagarh, Kantabanji… as this is the only train to India's commercial capital from this region, says Karunakar, who travelled by this train recently.
Many people with general tickets boarded the train till Raipur and Durg as it is serving as a daytime Intercity Express. Many pilgrims from Vizianagaram, Rayagada and other places, find this train convenient to visit Sri Shirdi Sai Baba temple. They alight at Manmad and go by road.
Since
...
more...
this train has such high patronage, we request the East Coast Railway to initiate the following: Increase the number of coaches from the present 19 to 24 by adding a few AC coaches as there is huge demand, convert the train into a daily (as it caters to the needs of people going to both Mumbai and Shirdi) by slightly changing its timings as this slot is filled and run as a daily two-pair Inter-city (like 12805/6 Janmabhoomi Express) from Visakhapatnam to Raipur/Bilaspur/Korba and vice-versa as it reduces the load on this train.

  
15646 views
Apr 12 2016 (09:45)
AAA   349 blog posts
Re# 1799556-1            Tags   Past Edits
Agree with Karunakar ..
This train should be made daily as it caters to the needs of People of North Coastal AP & South Western Odisha .. going to Shirdi & Mumbai ..
A day time ICE from VSKP to R/BSP/KRBA reduces the load on 12807 Samata SF Exp
If made daily then in a way it reduces the load on 18519/20 and 18503/4
...
more...
..
So ya these r good sugg to be implemented ..

  
Apr 13 2016 (15:51)
Save Jallikattu   1861 blog posts   4 correct pred (66% accurate)
Re# 1799556-2            Tags   Past Edits
yes.. Indeed the frequency of this train should be increased...
  
★★  General Travel
1 Followers
28048 views
Aug 18 2015 (22:06)   SVDK/Shri Mata Vaishno Devi Katra (3 PFs)
 

Guest: 7d62dc5f   show all posts
Entry# 1568444            Tags   Past Edits
Lot of people from Odisha Visit Mahalakshmi Temple (Vaishnodevi Mata) in Katra, J&K.
But we do not have trains from this state.
Similarly many people visit Amritsar as it is home to the Harmandir Sahib (Golden Temple) and Jallianwala Bagh (one tri weekly train)..
Similarly many people visit Chandigarh/Kalka as it is closer to Shimla ..
So
...
more...
if there is one train to SVDK Via UHP, JAT, PTKC, JRC (with slip coaches to ASR & JUC) .. LDH, CDG, UMB, SRE, MTC, NDLS, CNB, MGS/ALD/BSB, ADRA, KGP, BBS from BAM

7 posts - Aug 2015

4 posts - Mon Sep 07, 2015

1 posts - Tue Sep 08, 2015

  
22705 views
Sep 08 2015 (21:30)
IR no more Safe   17285 blog posts   93220 correct pred (74% accurate)
Re# 1568444-13            Tags   Past Edits
dear objector, why cant u reply in comment section instead of hiding ur face in objection ??

  
22781 views
Sep 08 2015 (21:34)
Guest: 7ffcd02d   show all posts
Re# 1568444-14            Tags   Past Edits
dekhiye abhi sirf train chalne k baare me sochne pe objections mil rahe hain train chal gayi hoti puri se to Objector sahab to behosh ho jaate :v
Take this humor on a lighter note objector sahab. :)

  
22686 views
Sep 08 2015 (21:35)
IR no more Safe   17285 blog posts   93220 correct pred (74% accurate)
Re# 1568444-15            Tags   Past Edits
sahi bat.. isme objection dene ka kya hai.. aap disagree kar hi sakte hai..
ye sab apne opinions de rhe hai decision to RB ko karna hota hai..

  
22668 views
Sep 08 2015 (21:40)
Hum safar express idea is total flop^~   77466 blog posts   5080 correct pred (77% accurate)
Re# 1568444-16            Tags   Past Edits
I have not given objection but For discussion of imaginary train best place is imaginary section, where people can give flags as per their wish.
Moderator has given all facility to member but member don't use it properly ...

  
22688 views
Sep 08 2015 (21:42)
Koilakuntla in IR~   7725 blog posts   7 correct pred (63% accurate)
Re# 1568444-17            Tags   Past Edits
like wise imaginary trains there is need for imaginary extension which will reduce many posts in main forum
  
★★★  General Travel
0 Followers
8676 views
Aug 11 2015 (19:18)   22415/Andhra Pradesh AC SF Express | VSKP/Visakhapatnam Junction (8 PFs)
 

SRG*^~   34963 blog posts   151684 correct pred (75% accurate)
Entry# 1562824            Tags   Past Edits
Updated on IRCTC.. Here Comes the Official TT. As of now showing Tri-weekly.

23 posts - Tue Aug 11, 2015

  
2162 views
Aug 11 2015 (23:15)
f ts wrkng via twitter r new zone and hq needed~   1649 blog posts   26 correct pred (61% accurate)
Re# 1562824-24            Tags   Past Edits
Of all 2 days and a night journey from Vskp - Ndls will be a nightmare

  
2460 views
Aug 11 2015 (23:16)
SRG*^~   34963 blog posts   151684 correct pred (75% accurate)
Re# 1562824-25            Tags   Past Edits
A TT around 30-31 hrs would have been ideal for a Full AC LHB train...Lets see how this works out.

  
5993 views
Aug 12 2015 (13:32)
DD DISLODGED BBSKJM SLOT   6145 blog posts
Re# 1562824-26            Tags   Past Edits
The desire to unchange is welcome.

  
6021 views
Aug 12 2015 (13:34)
hemanth   2486 blog posts   578 correct pred (80% accurate)
Re# 1562824-27            Tags   Past Edits
yes even in the inaugral it was requested and so should be considered,though not immediate first daily then may be next time around timings will be tweeked.

  
5913 views
Aug 12 2015 (14:43)
SRG*^~   34963 blog posts   151684 correct pred (75% accurate)
Re# 1562824-28            Tags   Past Edits
Didn't get you???
  
★  General Travel
0 Followers
8279 views
Aug 17 2015 (14:30)   22416/Andhra Pradesh AC SF Express
 

Hum safar express idea is total flop^~   77466 blog posts   5080 correct pred (77% accurate)
Entry# 1567267            Tags   Past Edits
Raipur has huge demand for AC exp . I will write grievance to RM to reroute it via Raipur ...

18 posts - Mon Aug 17, 2015

1 posts - Sun Aug 23, 2015

9 posts - Mon Aug 24, 2015

4 posts - Tue Aug 25, 2015

  
1870 views
Aug 25 2015 (17:55)
A capella*^~   9308 blog posts   2447 correct pred (76% accurate)
Re# 1567267-36            Tags   Past Edits
Mjhe lgta hai.. Ab saari trains ka stop hathras jarur hona chahiye.. Kahin aur ho na ho.. All the best.

  
1842 views
Aug 25 2015 (23:34)
Guest: 188bd054   show all posts
Re# 1567267-37            Tags   Past Edits
Kyo.Hathras kya koi metro city he ya national capital he?
I want equality not partiality.
Hathras ka example to kewal isiliye diya ki iss topic par theek se bol saku but haqiqat to yahi he ki Bharat me na jane kitne Hathras he.

  
1826 views
Aug 25 2015 (23:39)
Hum safar express idea is total flop^~   77466 blog posts   5080 correct pred (77% accurate)
Re# 1567267-39            Tags   Past Edits
Request for Archival
#admin
thanks

  
2126 views
Aug 25 2015 (23:41)
Abhishek Jaiswal*^~   44155 blog posts   18268 correct pred (69% accurate)
Re# 1567267-40            Tags   Past Edits
#FMs please do the needful.

  
3978 views
Aug 26 2015 (00:14)
22955 Kutch Superfast Express*^~   2860 blog posts   5684 correct pred (63% accurate)
Re# 1567267-42            Tags   Past Edits
Blog Entry Archived.
Requested
  
General Travel
0 Followers
11656 views
Aug 15 2015 (06:55)   19453/Gandhidham - Puri Weekly Express | ADI/Ahmedabad Junction (10 PFs)
 

Guest: 7d62dc5f   show all posts
Entry# 1565580            Tags   Past Edits
There are two trains from GIMB to PURI.
i) 19453/Gandhidham - Puri Weekly Express
ii) 12993/Gandhidham - Puri (Weekly) SF Express
It would be beneficial to people of Western Odisha if 19453 is restricted to RGDA.
There
...
more...
is no point in travelling in circuitous way from TIG to PURI Via RGDA, VZM, BAM & KUR;
If you have shorter route TIG to PURI Via SBP, BBS & KUR.

1 posts - Sat Aug 15, 2015

  
5884 views
Aug 15 2015 (16:10)
Guest: 7d62dc5f   show all posts
Re# 1565580-2            Tags   Past Edits
I feel either 19454 should start from BAM (as there are no facilities in RGDA) or 12994 should start from BAM as it helps more number of people ..

  
5823 views
Aug 21 2015 (20:45)
Guest: 7d62dc5f   show all posts
Re# 1565580-3            Tags   Past Edits
12844 should be made daily as lot of people from RGDA, TIG etc travel to ADI

  
5620 views
Aug 21 2015 (21:14)
Vinay Kumar~   15468 blog posts   361 correct pred (78% accurate)
Re# 1565580-4            Tags   Past Edits
Its nt about TIG/RGDA neither about shortest route but to provide the connectivity for traveler who wish to travel to GIMB/ADI/BRC etc in between PVP/BALU!!
Wish u hav had same feel for 18402!! With ur Logic, it shld b terminated @ Wardha...y taking circular route for VSKP/PURI???
12844--ADI-PURI...isnt that again a circular train??
Oh..RGDA-PURI Slip seems father of circular train...y cant it b scrapped,
...
more...
as there exist no point as per u??
Which train VZM fellow gonna take for GIMB btw????

  
10236 views
Aug 24 2015 (16:56)
kalingaUtkal   192 blog posts
Re# 1565580-5            Tags   Past Edits
If a link between BAM to Raygada will be constructed, it will reduce so much T/T. Southern Odisha people should demand for a new rail link before upcoming budget.

  
10165 views
Aug 24 2015 (22:11)
Vinay Kumar~   15468 blog posts   361 correct pred (78% accurate)
Re# 1565580-6            Tags   Past Edits
But the original Odisha blogger seems in restriction of 1 train @ RGDA with circular route as issue, while lot many follow same kinda circle route!!
Yeah TT surely gonna get reduce & make people cherish RGDA-BBS/PURI & intermediate travel!! But mayb, geography may hav imposed restriction...dunno mch about although!!
  
General Travel
0 Followers
4786 views
Aug 21 2015 (20:57)   18574/Bhagat Ki Kothi - Visakhapatnam Weekly Express | BGKT/Bhagat Ki Kothi (3 PFs)
 

Guest: 7d62dc5f   show all posts
Entry# 1570792            Tags   Past Edits
Many People from RGDA, TIG and KBJ daily travel to RGDA.
But we have only weekly train 18573 VSKP - BGKT Exp.
Please introduce a SF Exp from BGKT to RGDA or BGKT to PURI Via RGDA
If that is not possible please increase the frequency of 18573 from weekly to Daily.
...
more...
  
General Travel
0 Followers
8620 views
Aug 13 2015 (09:26)   12879/Mumbai LTT - Bhubaneswar SF Express (PT) | LTT/Lokmanya Tilak Terminus (5 PFs)
 

Guest: 7d62dc5f   show all posts
Entry# 1563873            Tags   Past Edits
ECoR is neglecting South-Western Odisha and Waltair Division. From LTT - PURI/BBS there are 4 Trains
i) 12879 LTT - BBS
ii) 22865 LTT - PURI
iii) 11019 DR - BBS
iv) 12145 LTT -
...
more...
BBS ..
Towards RGDA/TIG/KRPU we have only ONE WEEKLY Train
22848 LTT - VSKP
I think ECoR and CR should leave the slot of 12879 and 22865 to 22848 ..
It should ask for increase in frequency of 12145 as it would be beneficial to the entire state ..

  
8515 views
Aug 13 2015 (09:33)
system   940 blog posts
Re# 1563873-2            Tags   Past Edits
Auto-Archived due to Objections.
  
General Travel
0 Followers
5707 views
Feb 04 2015 (09:18)   VZM/Vizianagaram Junction (5 PFs)
 

AAA   349 blog posts
Entry# 1359681            Tags   Past Edits
विसाखपट्नम Visakhapatnam (VSKP): Route rationalisation introduced by Railway Board through its notification on April 1, in 2011 has turned out to be a big bane for export and import cargo operators from Visakhapatnam.
Appeals by several operators to see reason in their demand to end circuitous route to reduce handling cost as well as time for dispatch of various commodities have so far not yielded any results. Incidentally, the policy might have filled the coffers of the Railways but led to growing preference to alternate ports like Krishnapatnam and Paradeep by the port users.
Sources
...
more...
told The Hindu that all cargo from Visakhapatnam including all marshalling yards Vadlapudi, Jagayyapalem, Visakhapatnam Steel Plant, Visakhapatnam and Gangavaram Ports are forced to transport via Duvvada-Balharshah route instead of Titlagarh-Raipur, which is closer by 300 km. It is putting an additional burden of around Rs.5 lakh per train from Viskhapatnam to Delhi and vice versa.
“Incidentally, for sending cargo to Raipur, we are forced to route it through Nagpur and Raipur, a distance of 1,200 km instead of Vizianagaram-Titlagarh section, which is just 550 km,” said Sravan Shipping Services Managing Director G. Sambasiva Rao.
The worst-hit due to the policy is Visakha Container Terminal, which is considered one of the deep-drafted all-weather container berths with a plan to expand it with an investment of Rs.633 crore.
“The Railways is forcing us to route out cargo through certain designated places putting a heavy burden on us. Increase in landing cost of coal is also pinching hard the consumers by increasing power tariff. To put a full-stop to the problem, electrification work of second track between Raipur-Titlagarh lane should be expedited,” Visakhapatnam Stevedores’ Association president Krishna Kumar said.
Following several representations from the shipping industry, the Ministry of Shipping has decided to set up a committee to monitor railway infrastructure so as to remove bottlenecks faced in ensuring faster evacuation of cargo.

  
5129 views
Feb 04 2015 (09:21)
AAA   349 blog posts
Re# 1359681-1            Tags   Past Edits
VSKP - TIG - R section should be doubled and electrified.

  
5399 views
Feb 04 2015 (11:00)
pvsssraj   78 blog posts
Re# 1359681-2            Tags   Past Edits
electrification between Vizianagaram and titlagadh under progress with pace but doubling of track between titlagadh and raipur in slow process

  
5307 views
Feb 04 2015 (19:43)
AAA   349 blog posts
Re# 1359681-3            Tags   Past Edits
If this gets completed then trains MAS/TPTY, TVC, CAPE , BZA to BSB, NDLS, ASR, DDN, JAT gets reduced Via VSKP, TIG, R & KMZ instead of BZA, WL, NGP, BPL etc.
  
★  General Travel
2 Followers
31146 views
Dec 04 2014 (09:43)   12844/Ahmedabad - Puri SF Express | SC/Secunderabad Junction (10 PFs)
 

AAA   349 blog posts
Entry# 1295842            Tags   Past Edits
The following lines should be given priority in the coming Budget by either allocating funds or through PPP
i)PAP - CCT/COA - KLPH - NS (Proivdes an alternative route to BZA to the already congested route Via SLO, RJY & EE)
ii)KVR - BDCR (By doing so RJY/KVR & BDCR will become big Junctions like SC, WL/KZJ, GTL, BZA, RU & VSKP and also it reduces the distance from RJY/COA/VSKP to SC,NDLS,LTT, SNSI etc)
iii)NDKD
...
more...
- KHT (Asmentioned by Siva Rama Krishnan it is all weather route through backward areas)
iv) PDPL - KRMR - NZB
v) KYOP - MOB
v) NDL - YA
vi) GNPR - THV(RGDA) : Provides a direct link from NWP - PLH - GNPR - RGDA (Instead of circuitous Via (CHE, CPP, VZM, VBL, RGDA)
vii) Quadrupling and Electrification of BN - SC
viii) Third line from GPT - VSKP

4 posts - Thu Dec 04, 2014

2 posts - Fri Dec 05, 2014

4 posts - Sat Dec 06, 2014

8 posts - Sun Dec 07, 2014

7 posts - Mon Dec 08, 2014

2 posts - Tue Dec 09, 2014

  
13034 views
Dec 09 2014 (14:27)
AAA   349 blog posts
Re# 1295842-28            Tags   Past Edits
Leta line be laid first and then at latter point of time we can think of doubling

  
13014 views
Dec 09 2014 (15:19)
ysk.6669   152 blog posts
Re# 1295842-29            Tags   Past Edits
If the line isn't a double line, a train may end up taking the same time as on the existing route. That was why I was talking about a double line.
Thk u.

  
12859 views
Dec 09 2014 (22:32)
AAA   349 blog posts
Re# 1295842-30            Tags   Past Edits
Let a single line be laid first .. BDCR will come into mainline and Sree Seetha Ramachandra Swamy shrines which is known only to few people will become one the famous temples in India and more trains can be started from BZA, GNT & MTM. Many lines are laid even though ROI is very less the best eg was JAT - UHP - SINA - BRML Line and few lines in North East. It is only for connectivity not Revenue/Profit. That too Khammam Dist in Telangana is one of the most backward Dists.

  
11583 views
Dec 24 2014 (09:49)
Venkat వెంకట్   13683 blog posts   13 correct pred (86% accurate)
Re# 1295842-31            Tags   Past Edits
Kovvur-Kothhagudam line planned on planes only...No issues for speed.

  
25352 views
Dec 26 2014 (14:35)
Aditya   2023 blog posts   170 correct pred (68% accurate)
Re# 1295842-32            Tags   Past Edits
Page#    Showing 1 to 10 of 15 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site