Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jan 20, 2017 09:26:27 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jan 20, 2017 09:26:27 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Entry# 1601776-0
Entry# 1990726-0
Entry# 900874-0

KY/Kareli (2 PFs)
کرےلی     करेली

Track: Construction - Double-Line Electrification

Near Gurudwara, Kareli, Dis.-Narsinghpur
State: Madhya Pradesh

Elevation: 365 m above sea level
Zone: WCR/West Central   Division: Jabalpur
No Recent News for KY/Kareli
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 32
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 2.5/5 (122 votes)
cleanliness - average (16)
porters/escalators - average (16)
food - average (15)
transportation - average (15)
lodging - average (15)
railfanning - average (15)
sightseeing - average (15)
safety - average (15)

Nearby Stations

KFY/Karapgaon 8 km     BNE/Bohani 15 km     NU/Narsinghpur 16 km     GPC/Ghatpindrai 22 km     BELD/Belkhera 27 km     GAR/Gadarwara 28 km     KKB/Karak Bel 32 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 70 blog entries  next>>
  
★★★  General Travel
Dec 23 2016 (21:55)   12670/Ganga Kaveri Express | JBP/Jabalpur Junction (6 PFs) | ET/WDP-4B

12192 जबलपुर नई दिल्ली श्रीधाम सुपरफास्ट   308 blog posts   5 correct pred (100% accurate)
Entry# 2102196            Tags   Past Edits
#ETALDELECTRIFICATION
In a nutshell, I've closely identified the progress of electrification work between Jabalpur and Itarsi. The details are given below.
1. Jabalpur (excl.)-Narsinghpur work is almost done. Wiring is complete. Work left is only on the two bridges over Narmada river. I think they are deciding to electrify KEQ-JBP at the end. Pic is given in my trip blog.
2. The pic
...
more...
no. 1 & 2 gives the good news we all have been waiting for. The final section i.e, Kareli-Pipariya work has started. Holes have been dug from Gardarwara till Pipariya. You can see works-man digging holes for poles. Soon they'll reach Kareli.
3. Pipariya station is completely under wires now. Pics 3,4,5 shows the status. Wiring from PPI-BGRT is done. At few poles it is to be tightened. I've seen works-man tighten the wires, but due to immense speed of the train (thanks to ET shed monster WDP4b :p ) i couldn't capture those instants. Pics- 8,9 shows BRGT station status.
4. The only single line section of ET-ALD route i.e, BRGT-SQL has also begun to come under wires. Poles and wires are installed and only tightening needs to be done. Pics 9,10,11 are evident. Even bridge over TAWA river is getting poles to be installed.
5. The section after SQL is completed. Only tightening of wires is left at 4-5 poles.
Work is going on at decent pace. CORE is all set to trail the electrified section of ET-PPI in January and is working on that. I hope that was useful :)

16 posts - Mon Dec 26, 2016

  
3052 views
Dec 26 2016 (12:58)
2017Year of hopes for JBP   3079 blog posts   44 correct pred (50% accurate)
Re# 2102196-18            Tags   Past Edits
yes work of doubling also started b/w BGTA-Sontalai as i have spotted the ongoing work after sontalai as trees is being cutted and i think only before tawa bridge the new line will be diverting or else i think the more space which is there in the old bridge will be used to lay new line and before tunnel it will be divertd to avoid new tunnel construction so its good to see work of doubling started from sontalai end

  
1896 views
Jan 04 2017 (23:17)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-19            Tags   Past Edits
Jbp katni electrification work 70percent kam ho gaya hai sihora station k pas dumping yard hai jaha electrification mai lagney wala saman rakha hai

  
1793 views
Jan 04 2017 (23:42)
Mohammad Sharique Siddiqui   26 blog posts
Re# 2102196-20            Tags   Past Edits
Very happy to see that the work is restarted hope it finishes soon

  
1751 views
Jan 05 2017 (00:11)
12192 जबलपुर नई दिल्ली श्रीधाम सुपरफास्ट   308 blog posts   5 correct pred (100% accurate)
Re# 2102196-21            Tags   Past Edits
70% ho gya?

  
1727 views
Jan 05 2017 (00:25)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-22            Tags   Past Edits
Yes bro aj hi dayodaya express sey jaipur se lauta hu tab mainey dekha hai70na sahi par 60percent to done hai
  
★★  Rail Fanning
1 Followers
4684 views
Dec 12 2016 (17:41)   12062/Jabalpur - Bhopal Habibganj Janshatabdi Express | KY/Kareli (2 PFs)

12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   287 blog posts   7 correct pred (100% accurate)
Entry# 2088849            Tags   Past Edits
ET- ALD Electrification update
Date:- December 11, 2016
NU/Narsinghpur-ET/Itarsi Electrification update (Part of ALD/Allahabad-ET/Itarsi Electrification):-
I Traveled from Kareli to Mumbai by 12062(Till ET) + 12162(from ET), Yesterday.
Narsinghpur to Kareli updates given by my
...
more...
brother, sorry due to fog and cold, not able to capture pictures.
Between Stations (Excluding Platforms area/Till Outer)
Narsinghpur- Kareli = Poles are established till baskheda-Kathotiya road railway gate, no wiring, hole work completed
Kareli-Bohani=Hole work completed, no poles
Bohani-Gadarwara= Hole work completed till Manakwara(Kareli- Gararwara road) railway gate, no poles
Gadarwara-Salichoka road =no poles, no hole work (no electrification Sign)
Salichoka road-Bankhedi = no poles, no hole work (no electrification Sign)
Bankhedi-Pipariya= Hole work completed, no poles
Pipariya-Sohagpur= Poles established, wiring work is in progress
Sohagpur-Guramkhedi= work completed
Guramkhedi-bagratawa= work completed
Bagratawa- Sontalai= poles established till tunnel from BGTA, work is under progress inside of tunnel
Sontalai-Gurra= work completed
Gurra-Itarsi=work completed till itarsi outer, BPL-JBP Division border Board
Station wise (only on Platform, between JBP end to Itarsi end):-
Narsinghpur= poles established wiring work is in progress
Kareli= no poles, hole work completed
Bohani= hole work completed, poles establish work under-progess
Gadarwara=no work (no electrification Sign)
Salichoka= no poles, hole work completed
Bankhedi= no poles, hole work completed
Pipariya= poles established, wiring work is in progress
Sohagpur= pole work under progress
Guramkhedi= work completed
Bagratawa= pole work under progress
Sontalai= pole work under progress
Gurra= work completed
TSS work is also running with full speed.
I think , may be that news will become true, that from JAN 2017, E-Locos will there between PPI-ET.

4 posts - Mon Dec 12, 2016

3 posts - Tue Dec 13, 2016

4 posts - Thu Dec 15, 2016

  
2530 views
Dec 15 2016 (11:23)
HAPPY NEW YEAR from JBP ET OHE OMG 😲~   9299 blog posts   14 correct pred (46% accurate)
Re# 2088849-12            Tags   Past Edits
After efication complete I don't think wcam would remain link of gr

  
2513 views
Dec 15 2016 (11:24)
12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   287 blog posts   7 correct pred (100% accurate)
Re# 2088849-13            Tags   Past Edits
no pblm..
koi b ho...
mumbai se direct narsinghpur e-loco milega.. voi kafi h..

  
Dec 18 2016 (10:14)
rohit04u   25 blog posts
Re# 2088849-14            Tags   Past Edits
This is great news pipariya itarsi will be operational by march 17 atleast and i have seen too that excluding kachhpura jabalpur kachhpura to narsingpur almost completed and narsingpur to gadarawada is also about to get completed by june july 2017 but only the question ❓ mark arrises between gadarawada to pipariya now bcoz the work progress is nill or no work going on why is this happening don't know the reason funds shortage or some technical problem that is unknown railway officials r not updating any information about this section of electrification completely nothing let see what comes up in rail budget now thanks for gud update

  
1938 views
Dec 19 2016 (09:40)
12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   287 blog posts   7 correct pred (100% accurate)
Re# 2088849-15            Tags   Past Edits
what about Jabalpur to Kachhpura?
has work started?

  
1888 views
Dec 19 2016 (11:33)
OHE over JBP~   992 blog posts   61 correct pred (72% accurate)
Re# 2088849-16            Tags   Past Edits
Nopes
  
General Travel
0 Followers
1250 views
Nov 11 2016 (10:56)   12293/Mumbai LTT - Allahabad AC Duronto Express | KY/Kareli (2 PFs)

ut29077   139 blog posts   1 correct pred (33% accurate)
Entry# 2055992            Tags   Past Edits
Allahabad Duronto's unscheduled halt @ Kareli, it was late by 1hr30minutes
  
General Travel
0 Followers
6463 views
Oct 21 2016 (11:24)   11066/Pawan Express (PT) | LTT/Lokmanya Tilak Terminus (5 PFs)
 

12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   287 blog posts   7 correct pred (100% accurate)
Entry# 2031231            Tags   Past Edits
what is the difference between 10061/62 and 10065/66????

  
6322 views
Oct 21 2016 (11:48)
Merry Christmas~   3977 blog posts   37 correct pred (62% accurate)
Re# 2031231-1            Tags   Past Edits
Nothing..both have been merged now.

  
6331 views
Oct 21 2016 (11:52)
12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   287 blog posts   7 correct pred (100% accurate)
Re# 2031231-2            Tags   Past Edits
in the past one was running from Muzaffarpur, if I am not wrong??
only that was the difference???

  
6331 views
Oct 21 2016 (11:53)
Merry Christmas~   3977 blog posts   37 correct pred (62% accurate)
Re# 2031231-3            Tags   Past Edits
Yup.
  
★★★  General Travel
Apr 25 2016 (07:35)   ET/Itarsi Junction (8 PFs)
 

Guest: 7fe915d9   show all posts
Entry# 1818949            Tags   Past Edits
Good news...
finally SQL/Sontalai BGTA/Bagra tawa, the only single line track of ET-JBP/ALD line will be going to double....
I saw inauguration board of project at ET/itarsi station PF 4/5 below the FOB..
requesting to Itarsi Rail-fans, pls capture n upload pic for it...
for
...
more...
that i also google for same but i found this one..

10 posts - Mon Apr 25, 2016

  
3187 views
Apr 25 2016 (19:39)
Guest: 7fe43e7b   show all posts
Re# 1818949-11            Tags   Past Edits
yes sir,,
bs itarsi wale pic dal de..
tb sb clear ho jaega....
actuly i saw that board from window when train departs from ET, so that i was unable to capture it...

  
3173 views
Apr 25 2016 (19:42)
prashantg077~   1967 blog posts
Re# 1818949-12            Tags   Past Edits
as far as i know the present bridge was constructed by Britishers and IR never tried of doubling this particular section due to its difficulties..
Everything in ET JBP got doubled except fr this one..
Looking FWD fr this..
##################Its the real heaven of RFing!!!!!!!!!!!!!!

  
3163 views
Apr 25 2016 (19:45)
Guest: 7fe43e7b   show all posts
Re# 1818949-13            Tags   Past Edits
vo b ho jata tha sir,, but Dam k karn tunnel bnane k lie blas krne se mana kr dia tha ... islie ni bn paya...
suna h k new brige thodi dur hoga or vo route pe tunnel ni hogi....

  
3511 views
Apr 26 2016 (00:05)
Ashfak Ahmed Moosa   62 blog posts
Re# 1818949-14            Tags   Past Edits
Frnds ye khabar sahi hai puraney bridge k pas hi naya bridge banega aur new railway line tunnel se 7 kms ghoom gar jayegi aur iska tender nikal chuka hai

  
2955 views
Apr 26 2016 (10:15)
Alan Walkers Fade Away is melodious   1969 blog posts   73 correct pred (62% accurate)
Re# 1818949-15            Tags   Past Edits
Mera matlab hai ki WCR ne yeh map Geological Survey of India ke toposheet ki madad se banaya hoga.
  
Rail Fanning
0 Followers
1114 views
Apr 20 2016 (08:04)   CPR/Chhapra Junction (5 PFs)

Guest: 7fe932b2   show all posts
Entry# 1811603            Tags   Past Edits
Isko Bolte he #Achche_Din
Thank you #Namo_Prabhu
:)
  
★★  General Travel
0 Followers
3277 views
Nov 19 2015 (15:59)   01711/Mumbai CST - Jabalpur SF Special (PT) | KY/Kareli (2 PFs)
 

Guest: 7110474a   show all posts
Entry# 1654648            Tags   Past Edits

  
1978 views
Nov 19 2015 (18:21)
2017Year of hopes for JBP   3079 blog posts   44 correct pred (50% accurate)
Re# 1654648-1            Tags   Past Edits
any news of extending this train after 28nov 2015 because less than a week is remaining but WCR did not published any notice to extend this train further??

  
2018 views
Nov 24 2015 (09:38)
Guest: 7110474a   show all posts
Re# 1654648-3            Tags   Past Edits
extend ho gyi 04 jan tk...

  
1649 views
Nov 24 2015 (18:11)
2017Year of hopes for JBP   3079 blog posts   44 correct pred (50% accurate)
Re# 1654648-4            Tags   Past Edits
news source???

  
2381 views
Nov 25 2015 (17:32)
Guest: 7110474a   show all posts
Re# 1654648-5            Tags   Past Edits
naidunia news paper..
posted in IRI news section also
  
★★★  Rail Fanning
0 Followers
9648 views
May 26 2015 (22:43)   51672/Katni Itarsi Fast Passenger (UnReserved) | BRGT/Bheraghat (2 PFs)
 

Guest: 4957ffff   show all posts
Entry# 1486613            Tags   Past Edits
#JBP_ET_electrification
Aaj ka latest update...
Kam jbp side se start ho gya h..
1). electrification ka sara saman bhedaghat me shift ho rha h ...
Pics attach h...
2).
...
more...
Electric pole lgane k lie jabalpur se bikrampur (narmada bridge) tk gaddhe traiyar ho ge....
Or aage ka km b under progress h...
3) 80% chhote railway gates k baju me underbridge bn ge/bnae ja rhe h...
4) sare railway gates pr electrification k barrior lg ge.. n railway stations k foot over bridge pe jaliya lg gi...
Lst me sbse imp news..
5) Ghatpindarai belkheda k bich sab kaam ho gya h ab bs sleepers k upr patry dalna reh gya....
I think agr itni hi ya isse b teji se kaam chalta rha to sure dec. 2016 tk ald-JBP-et me WAP dodne lgege...

1 posts - Tue May 26, 2015

11 posts - Wed May 27, 2015

4 posts - Thu May 28, 2015

3 posts - Sat May 30, 2015

  
3935 views
May 30 2015 (20:33)
Montez~   2207 blog posts   1582 correct pred (60% accurate)
Re# 1486613-21            Tags   Past Edits
itni space hai ET me, because qaafi WAPs ki zaroorat hogi
Moreover, diesels ka kya hoga?

  
4198 views
May 30 2015 (21:58)
Guest: 744ea271   show all posts
Re# 1486613-22            Tags   Past Edits
Deisel b chalege n electric b....
Na...
Mje ni lgta k jyada jrurt pdegi bcz zone apne apne loci share krehe...
Jese 12321 mumbai mail ko ald tk hwh shade ka WAP leke aata h...
So..
...
more...
electrification k bad may b possible vo loco mumbai tk chalne lge...

  
6543 views
May 31 2015 (14:26)
Montez~   2207 blog posts   1582 correct pred (60% accurate)
Re# 1486613-23            Tags   Past Edits
take this like
ET WAP4 works for 24 hours, n say ki use CSTM se ET aane me 8 hours lagte hain then it hauls Pawan to LTT
Ab agar isi WAP4 ko ET se ALD next 8 hours ka work diya to fir Pawan kaise jayegi LTT tak?
And diesels kyon work karenge fully electrified track par? :P
Fir
...
more...
electrification ka kya fayda :D

  
May 31 2015 (15:23)
Ammar ali   606 blog posts   385 correct pred (81% accurate)
Re# 1486613-24            Tags   Past Edits
Bhai jo loco idle hoga usse use karenge aur tab tak ET ke pass aur wap4 aajayenge.Isliye ald se electrification shuru hua naki et se.Eg. Mumbai mail ka jo HWH WAP4 ald mai deattach hota hai wo ab kte tak aur baad mai cstm tak jane lagega aisa kai trains ke saath hoga jab full route electrify hoga aur kai trains ko home zone se hee loco link milegi to load nahi badega. :-)

  
6368 views
May 31 2015 (22:48)
Guest: 7442c2a4   show all posts
Re# 1486613-25            Tags   Past Edits
Me b yhi bolne wala tha jo ali sir bol rhe h..
  
★★  General Travel
0 Followers
2052 views
Nov 19 2015 (15:47)   11271/Vindhyachal Express | KY/Kareli (2 PFs)
 

Guest: 7110474a   show all posts
Entry# 1654635            Tags   Past Edits

  
Nov 20 2015 (07:36)
Guest: 7df0a9a2   show all posts
Re# 1654635-1            Tags   Past Edits
SABSE CLEAN TB
  
★  General Travel
0 Followers
2679 views
Nov 19 2015 (15:52)   11471/Indore - Jabalpur Overnight Express | KY/Kareli (2 PFs)
 

Guest: 7110474a   show all posts
Entry# 1654642            Tags   Past Edits
Page#    Showing 1 to 10 of 70 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site