Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Jun 24, 2017 10:47:28 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Jun 24, 2017 10:47:28 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 979066-0
Details Edit
Large Station Board;
Entry# 1189604-0
Details Edit
Large Station Board;
Entry# 2022705-0
Details Edit
Medium; Platform Pic; Large Station Board;
Entry# 2248761-0

KIR/Katihar Junction (7 PFs)
کٹہار جنکشن     कटिहार जंक्शन

Track: Double Electric-Line

Jn Points: Barauni, New Jalpaiguri, Malda Town, Jogbani, Teznarayanpur Address : National Highway 81, Katihar 854105
State: Bihar

Elevation: 36 m above sea level
Zone: NFR/Northeast Frontier   Division: Katihar
No Recent News for KIR/Katihar Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 7
Number of Halting Trains: 76
Number of Originating Trains: 31
Number of Terminating Trains: 31
Rating: 3.8/5 (183 votes)
cleanliness - good (24)
porters/escalators - good (23)
food - good (23)
transportation - good (22)
lodging - good (22)
railfanning - good (22)
sightseeing - good (24)
safety - good (23)

Nearby Stations

KIRB/Katihar CBO MB 1 km     NYT/Nayatola 4 km     DLF/Dalan 6 km     MIYN/Maniyan 6 km     MNS/Manshahi 9 km     DNQ/Dandkhora 9 km     SMO/Semapur 11 km     KUQ/Kuretha 11 km     GRR/Gorphar 12 km     KRMP/Kumaripur Halt 13 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 466 blog entries  next>>
  
★  General Travel
0 Followers
661 views
Jun 22 2017 (17:47)   12506/North East Express (PT) | KIR/Katihar Junction (7 PFs)

GSD   2851 blog posts   20310 correct pred (71% accurate)
Entry# 2329353            Tags   Past Edits
Offlink LDH WAG 7 with 12506 ANVT-GHY North East Express running 7 hrs late.
Date:- 10/06/2017
Location:- Katihar

4 posts - Yesterday

  
249 views
Yesterday (22:32)
Rahul TreHan~   3595 blog posts   38 correct pred (64% accurate)
Re# 2329353-6            Tags   Past Edits
Its all about priority! Irrespective of the departure timing.

  
235 views
Yesterday (22:45)
Railfans Always Rocks~   78 blog posts   83 correct pred (64% accurate)
Re# 2329353-7            Tags   Past Edits
Yes this is the only reason, BP mail is NR train and that's why it runs with priority in NCR. For all other trains, it is their offence that they are NFR trains and they have to run in two great zones ( ECR.... the brand + NCR...... the bigger brand 😂😂)
Just for fun😂, but I think NFR should do tit for tat by not giving priority to BP mail in its zone for 1 week or 15 days 😂😂.
Par NFR ki niyat saaf hai, aisa hoga nahi

  
171 views
Today (00:48)
GSD   2851 blog posts   20310 correct pred (71% accurate)
Re# 2329353-8            Tags   Past Edits
NFR tries to maintain the schedule of the train, it doesn't get bias.
Even special trains are given equal priority, last time when I was travelling 12506 kept on trailing 82504 from KIR to NBQ.
At dalkhola there was a loco failure of Freight train, 82504 was made to halt at Telta on Main line for 1hr 45 mins, 12506 arrived from the back and was kept on the loop, after the line was cleared 82504 was made to depart earlier & 12506 trailed till NBQ.

  
145 views
Today (02:51)
Rahul TreHan~   3595 blog posts   38 correct pred (64% accurate)
Re# 2329353-9            Tags   Past Edits
Yeah unbiased controlling is nfr's nature.
They even make Rajdhani's halt for a SF xing (line clearance) which i believe is a great approach and mindset

  
141 views
Today (02:54)
Rahul TreHan~   3595 blog posts   38 correct pred (64% accurate)
Re# 2329353-10            Tags   Past Edits
Yesterday 15602 arrived CNB with 3 minutes delay ONLY! Avoided SS OT..
Also 14056 arrived CNB with 2:03 hrs delay, which speaks thats it always a toss b/w PSK and BP upto DNR, only there place changes, but delay is constant
  
General Travel
0 Followers
957 views
Jun 21 2017 (14:41)   22411/Naharlagun - New Delhi AC SF Express | KIR/Katihar Junction (7 PFs)

Abhishek Jaiswal*^~   46213 blog posts   18518 correct pred (69% accurate)
Entry# 2327956            Tags   Past Edits
Dear ECR
why you are so slow..!
please learn something for shake of passenger.

54 posts - Wed Jun 21, 2017

  
403 views
Jun 21 2017 (21:26)
Abhishek Jaiswal*^~   46213 blog posts   18518 correct pred (69% accurate)
Re# 2327956-56            Tags   Past Edits
padha hai tabhi reply kiya hai.. itna bura trolling ecr me ummid nhi tha but ye log bhi ghatiya kaam karne lage hai ekdum.

  
399 views
Jun 21 2017 (21:29)
Abhishek Jaiswal*^~   46213 blog posts   18518 correct pred (69% accurate)
Re# 2327956-57            Tags   Past Edits
GM NER rajiv Misra ke jatey twitter duna ho gya.

  
313 views
Jun 22 2017 (09:46)
Abhishek Jaiswal*^~   46213 blog posts   18518 correct pred (69% accurate)
Re# 2327956-58            Tags   Past Edits
see after ecr in ner train did 540kms in 6hr 40mins and in last 4hrs just 45kms . Another huge trolling in Lucknow Northern railways. Pata nhi samjh kya rakha hai in logo ne. isse tez to bailgadi chali jaaye. Railmin chahe jo kahe durdasa to hai hi.

  
236 views
Jun 22 2017 (11:06)
Rahul K😎🚂~   2295 blog posts   2043 correct pred (77% accurate)
Re# 2327956-59            Tags   Past Edits
ECR NFR trains ki Band bajane me famous hai.. Why did they ask/agreed to divert 4-5 trains via PPTA-HJP-BJU jab pehle wali iss section ki trains nahi sambhalti hai!! Matlab kuch karne ko hai nahi but HJP,SEE me train badhwane ke liye long distance trains ki laga do..
Check daily departure status of KIR,almost saari train KIR se RT chalti hai, BJU, CPR, PPTA pahuchne me lag jaati hai inki..

  
200 views
Jun 22 2017 (11:16)
Sachin Sinha   532 blog posts   5 correct pred (53% accurate)
Re# 2327956-60            Tags   Past Edits
Wo to show off k liye tha.. PPTA junction sirf ek showoff k purpose k liye bana tha..
The entire ppta see line fiasco has failed entirely
  
General Travel
0 Followers
857 views
Jun 17 2017 (11:23)   NJP/New Jalpaiguri Junction (8 PFs)

debarathi mandal   4805 blog posts   11442 correct pred (88% accurate)
Entry# 2323680            Tags   Past Edits
Electrification update of MLDT-NJP section....current progress update
Electrification work reached upto Up distance signal of NJP....Up line mai pole install ho gaya bridge tak and single wire bhi lag gaya.....
Down line mai bhi pole bridge tak chala gaya
Hope work complete soon within 1.5 year maximum

1 posts - Sat Jun 17, 2017

  
684 views
Jun 17 2017 (21:57)
debarathi mandal   4805 blog posts   11442 correct pred (88% accurate)
Re# 2323680-2            Tags   Past Edits
Yes.

  
614 views
Jun 18 2017 (09:12)
Ashutosh Singh   58 blog posts
Re# 2323680-3            Tags   Past Edits
It can never be completed by the time stated by you.
PKR-MLDT is expected to be completed by 31st March 2019. We can set a timeframe for KIR-NJP & MLDT- NJP only when electrification works starts at the station's i.e. MLDT & NJP.
NFK & MLDT & NJP station's doesn't have a single pole how can you say that within 1.5 yrs it will be completed.

  
582 views
Jun 18 2017 (09:14)
debarathi mandal   4805 blog posts   11442 correct pred (88% accurate)
Re# 2323680-4            Tags   Past Edits
Ap jo bol raha hai o 5 sal pahale tara bat bol raha hai....apne last 1.5 year me kaya kam hua HWH-NJP Section me o ekbar pahale dekh lo....then comment
last 5 year me jo kam hua uska 90%+ work last 1-1.5 years me hua

  
561 views
Jun 18 2017 (09:18)
subhasishgoswami00   41 blog posts   1 correct pred (100% accurate)
Re# 2323680-5            Tags   Past Edits
He is right. Maine kuch din pahle is section Ko dekha. Bahat Kam ho gya hai

  
240 views
Jun 21 2017 (20:13)
Ashutosh Singh   58 blog posts
Re# 2323680-6            Tags   Past Edits
Matlab BJP aane se kaam speed up Hua hai..
Kuch v ho par pehle PKR-MLDT ka electrification main hai par iska progress bahut kharab hai. Mera point hai koi v main station par kaam start nai hua jaise NFK/MLDT/NJP aur ye sab station ko electrification karke train chalana 2020 ke pehle to possible nai hai.
Aur KIR-NJP ka v wahi time lag sakta at least 31st March 2020.
  
Poll
0 Followers
27861 views
52 votes
Apr 28 2017 (11:30)   12553/Vaishali SF Express (PT) | BJU/Barauni Junction (9 PFs)

Himanshu~   176 blog posts   99 correct pred (75% accurate)
Entry# 2253992            Tags   Past Edits
Just for fun . If you get only one chance to divert a single hjp-ndls bond train through digha bridge via ppta-mgs-ald-cnb to ndls. Which single train it will be [please reply reason behind it]
vaishali sf express8%4
bihar sampark kranti express0%0
swatantra senani sf express48%25
jyg-anvt garibrath express25%13
Naharlagun ac sf express8%4
shc-asr garibrath express0%0
poorbiya express4%2
njp-ndls superfast express0%0
amrapali express6%3
sapt kranti sf express2%1

1 posts - Apr 2017

7 posts - Tue May 09, 2017

  
21510 views
May 09 2017 (12:25)
Baaz SGUJ WDP4~   937 blog posts   43 correct pred (62% accurate)
Re# 2253992-9            Tags   Past Edits
Garib Rath, Bagmati. Now you will tell that these are not daily and you need a daily connectivity. But SS is mainly for Delhi, not for intermediate stations.

  
21541 views
May 09 2017 (12:36)
Himanshu~   176 blog posts   99 correct pred (75% accurate)
Re# 2253992-10            Tags   Past Edits
I m saying via patliputra . And from mfp and hjp sonpur there is not any train . Do you know how many stoppage there is between sonpur -Allahabad in present . I think ara and buxar will be must . Because these are important station of ecr .

  
21490 views
May 09 2017 (13:12)
Baaz SGUJ WDP4~   937 blog posts   43 correct pred (62% accurate)
Re# 2253992-11            Tags   Past Edits
I am also talking about PPTA. You can have that but that will be bane for the train only. I am aware about stops between Sonpur and ALD. And that's why I was suggesting a nonstop run post Sonpur. The shift of that quota towards HJP-SPJ passengers will be good for them only as there is rush throughout the year.

  
14774 views
May 23 2017 (06:50)
Himanshu~   176 blog posts   99 correct pred (75% accurate)
Re# 2253992-12            Tags   Past Edits
Vote guys

  
9808 views
Jun 01 2017 (01:19)
Apporv   17 blog posts   8 correct pred (78% accurate)
Re# 2253992-13            Tags   Past Edits
swatantrata senani express
  
★★  General Travel
1 Followers
2788 views
May 19 2017 (20:47)   15623/Bhagat Ki Kothi - Kamakhya Express | KIR/Katihar Junction (7 PFs)

bipinprk~   522 blog posts   1603 correct pred (76% accurate)
Entry# 2283508            Tags   Past Edits
Bhagat Ki Kothi-Kamakhya Express led by BGKT WDP-4B #40039 curving out of Katihar Jn

1 posts - Fri May 19, 2017

  
2224 views
May 20 2017 (14:14)
King of Indian Railways Mumbai Rajdhani^~   82722 blog posts   5297 correct pred (78% accurate)
Re# 2283508-2            Tags   Past Edits
Bgkt 40039 ignoring OHE poles like a BOSS !!!

  
2263 views
May 20 2017 (14:16)
PIyUsH SInGH™^~   1905 blog posts   2847 correct pred (74% accurate)
Re# 2283508-3            Tags   Past Edits
Which place?
Near KIRB/Katihar CBO MB?

  
May 20 2017 (14:18)
Rahul K😎🚂~   2295 blog posts   2043 correct pred (77% accurate)
Re# 2283508-4            Tags   Past Edits
hahaha.. Bilkul sahi.. Waise lovely capture Bipin bhai

  
2185 views
May 20 2017 (14:31)
उत्तर पश्चिम रेलवे NWR^~   5977 blog posts   340 correct pred (54% accurate)
Re# 2283508-5            Tags   Past Edits
Jai ho BGKT ki _/\_

  
1409 views
May 31 2017 (06:46)
Indian Railways Railfan~   439 blog posts   18623 correct pred (68% accurate)
Re# 2283508-6            Tags   Past Edits
Huge curve of kir
Page#    Showing 1 to 5 of 466 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.