Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 27, 2017 10:03:46 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 27, 2017 10:03:46 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search

NNR/Narayanpur (2 PFs)
نارائن     नारायणपुर

Track: Construction - Double-Line Electrification

Narayanpur
State: Bihar

Elevation: 40 m above sea level
Zone: ECR/East Central   Division: Sonpur
No Recent News for NNR/Narayanpur
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 20
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 3.1/5 (8 votes)
cleanliness - average (1)
porters/escalators - average (1)
food - good (1)
transportation - average (1)
lodging - average (1)
railfanning - good (1)
sightseeing - good (1)
safety - good (1)

Nearby Stations

BRKB/Bharat Khand 6 km     BRKD/Bharat Khand 6 km     THB/Thana Bihpur Junction 7 km     BIGH/Bagrigram Halt 12 km     PSR/Pasraha 12 km     KHQ/Kharik 15 km     GAI/Gauchhari 21 km     NNA/Naugachia 23 km     MSK/Mahes Khunt 25 km     CDBN/Chedhabanni Halt 30 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 2 of 2 blog entries  
  
General Travel
0 Followers
2618 views
Oct 02 2015 (22:09)   15909/Avadh Assam Express (PT) | GAI/Gauchhari (3 PFs)
 

mksald123   487 blog posts
Entry# 1606296            Tags   Past Edits
On 19 Nov 2014, I took train Avadh Assam exp from Old Delhi to New Jalpaiguri via Bareilly, Lucknow, Gonda, Gorakhpur, Siwan, Chhapra, Hajipur, Mujaffarpur, Barauni, Mansi, Katihar. The same train I had boarded 05 years back for official visit to New Jalpaiguri. That time the entire track from barabanki to Katihar was 100% single and 100% unelectrified. I was very glad to see this time that the stretch from Barabanki to Hajipur including Sonpur - Hajipur Gandak bridge was 100% doubled and 95% electrified and till today, I hope that the rest 5% electrification work would have also completed. The stretch between Hajipur to Muzaffarpur was single for 45 Kms but 100% electrified too. The stretch from Muzaffarpur to Mansi was again 100% doubled and 100% electrified. My train was only 45 minutes late till Mansi. The winter season had just approached and as my seat was side lower...
more...
in right side of my S7 Coach and diwali and chat puja had passed on 23 and 29 Oct. So there was no rush in my compartment, I was alone sitting or lying at my berth. As usual, I had Several maps of my journey route which I make before proceeding on my journey. The map contained all halts, small, medium and big stations name with Km distance between them. I didn't sleep for the entire distance between Lucknow to Katihar and just amazingly marking in my map the huge progress of Indian railways in 100% doubling and electrifying such a huge distance of more than 800 Kms in 04 years. I was thinking now the lifeline of the nation is finally changing its reputation. The train having only 45 minutes late after 20 hours of journey in UP and Bihar was making me feel awesome. But my feeling was shattered when the train left Mansi, a large no. of local passengers without or general class ticket boarded and sat forcefully on our seats. The Chain pulling was done 02 to 03 places. In spite of this I was concentrated on my work of marking on my map about the progress. Surprising I found , the stretch from Maheshkhunt to Thanabihpur was only 20% doubled as when I was watching through my window in right side, there was no other line there. The train was halted for 20 minutes at a Gauchhari small station for crossing another train from opp direction. Also the progress of electrification work was only 50% between Mansi and Thana bihpur. After Thana bihpur to Katihar again the tracks were 100% doubled except 01 km stretch on river kosi between katrea and kursela and 100% electrified too. But my happy journey had not remained happy as my train had delayed by 03 hours upto Katihar. My name is again being forwarded for recruiting youths at New Jalpaiguri in November this year. As Preferred route reservation to New Jalpaiguri is given by our office via this train only, but I prefer Brahmaputra Mail via Bhagalpur as my mama resides there, can anybody tell me whether situation has changed with any progress in the Mansi Katihar route.
  
General Travel
0 Followers
5999 views
Nov 28 2013 (21:07)   12423/Dibrugarh Town - New Delhi Rajdhani Express | NNR/Narayanpur (2 PFs)
 

Pained to know Boeing 777 landcrashed   23272 blog posts   21096 correct pred (68% accurate)
Entry# 919804            Tags   Past Edits
Rajdhani Exp standstill @ Narayanpur since 18.03

1 posts - Thu Nov 28, 2013

  
2446 views
Nov 28 2013 (21:08)
Pained to know Boeing 777 landcrashed   23272 blog posts   21096 correct pred (68% accurate)
Re# 919804-2            Tags   Past Edits
Kamakhya Anand Vihar standing @ NNR since 18.43

  
2440 views
Nov 28 2013 (21:10)
Pained to know Boeing 777 landcrashed   23272 blog posts   21096 correct pred (68% accurate)
Re# 919804-3            Tags   Past Edits
Patna Katihar Intercity standing @ Gauchhari since 19.12
Whats the case in ECR Sonpur Division? Again any Engine caught fire?

  
5645 views
Nov 29 2013 (07:18)
SUBHAM GKT   1956 blog posts   71 correct pred (66% accurate)
Re# 919804-4            Tags   Past Edits
same condition with the trains coming from SDAH/KOAA/HWH... all trains are coming late.. 12346, 15959 are more than 5 hrs late

  
5652 views
Nov 29 2013 (07:30)
SUBHAM GKT   1956 blog posts   71 correct pred (66% accurate)
Re# 919804-5            Tags   Past Edits
somethng happend with a freight train @ Barsoi...

  
5526 views
Nov 29 2013 (13:49)
upendra1984   127 blog posts   56 correct pred (50% accurate)
Re# 919804-6            Tags   Past Edits
got delayed by more than 4 hrs at NNR
Page#    Showing 1 to 2 of 2 blog entries  

Scroll to Top
Scroll to Bottom


Go to Mobile site