Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Feb 23, 2017 10:35:57 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Feb 23, 2017 10:35:57 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search

NU/Narsinghpur (2 PFs)
     नरसिंहपुर

Track: Construction - Double-Line Electrification

NH-26, Lakhnadon Road, Narsinghapur
State: Madhya Pradesh

Elevation: 364 m above sea level
Zone: WCR/West Central   Division: Jabalpur
No Recent News for NU/Narsinghpur
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 76
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 2.5/5 (128 votes)
cleanliness - average (16)
porters/escalators - average (16)
food - average (16)
transportation - average (16)
lodging - average (16)
railfanning - average (16)
sightseeing - average (16)
safety - average (16)

Nearby Stations

GPC/Ghatpindrai 6 km     BELD/Belkhera 11 km     KY/Kareli 16 km     KKB/Karak Bel 16 km     KFY/Karapgaon 24 km     SRID/Shridham 31 km     BNE/Bohani 31 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 27 blog entries  next>>
  
General Travel
0 Followers
1027 views
Feb 07 2017 (22:30)   22187/Bhopal Habibganj - Jabalpur Intercity Express | HBJ/Bhopal HabibGanj (5 PFs)

nsahu0201~   585 blog posts   43 correct pred (83% accurate)
Entry# 2155230            Tags   Past Edits
#admin #moderator #update plz add note with time table of 22187
new Time table (06:50 Dep. From HBJ)
sirf 05 Se 28 feb tk applicable h
uske baad old tt hi chalega
ye
...
more...
time table maintanance block k liye h

  
1016 views
Feb 07 2017 (22:31)
IR no more Safe^~   18891 blog posts   93945 correct pred (74% accurate)
Re# 2155230-1            Tags   Past Edits
You may update this in Latest section.
after this TT is over the other TT will be updated again.

  
1025 views
Feb 07 2017 (22:31)
Koush12461^~   78715 blog posts   5089 correct pred (78% accurate)
Re# 2155230-2            Tags   Past Edits
You can update in latest news also.
Thanks for sharing info..
  
General Travel
0 Followers
675 views
Jan 28 2017 (13:33)   KY/Kareli (2 PFs)

nsahu0201~   585 blog posts   43 correct pred (83% accurate)
Entry# 2143362            Tags   Past Edits
kya ET-JBP section me KARELI GADARWADA NARSINGHPUR station k pass kuch block ya kuchh work chal rha h kya ...... Vaha sari train late ho rahi h

  
577 views
Jan 28 2017 (19:27)
nsahu0201~   585 blog posts   43 correct pred (83% accurate)
Re# 2143362-1            Tags   Past Edits
plz reply
  
★★  Rail Fanning
1 Followers
6987 views
Dec 12 2016 (17:41)   12062/Jabalpur - Bhopal Habibganj Janshatabdi Express | KY/Kareli (2 PFs)

12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   357 blog posts   7 correct pred (100% accurate)
Entry# 2088849            Tags   Past Edits
ET- ALD Electrification update
Date:- December 11, 2016
NU/Narsinghpur-ET/Itarsi Electrification update (Part of ALD/Allahabad-ET/Itarsi Electrification):-
I Traveled from Kareli to Mumbai by 12062(Till ET) + 12162(from ET), Yesterday.
Narsinghpur to Kareli updates given by my
...
more...
brother, sorry due to fog and cold, not able to capture pictures.
Between Stations (Excluding Platforms area/Till Outer)
Narsinghpur- Kareli = Poles are established till baskheda-Kathotiya road railway gate, no wiring, hole work completed
Kareli-Bohani=Hole work completed, no poles
Bohani-Gadarwara= Hole work completed till Manakwara(Kareli- Gararwara road) railway gate, no poles
Gadarwara-Salichoka road =no poles, no hole work (no electrification Sign)
Salichoka road-Bankhedi = no poles, no hole work (no electrification Sign)
Bankhedi-Pipariya= Hole work completed, no poles
Pipariya-Sohagpur= Poles established, wiring work is in progress
Sohagpur-Guramkhedi= work completed
Guramkhedi-bagratawa= work completed
Bagratawa- Sontalai= poles established till tunnel from BGTA, work is under progress inside of tunnel
Sontalai-Gurra= work completed
Gurra-Itarsi=work completed till itarsi outer, BPL-JBP Division border Board
Station wise (only on Platform, between JBP end to Itarsi end):-
Narsinghpur= poles established wiring work is in progress
Kareli= no poles, hole work completed
Bohani= hole work completed, poles establish work under-progess
Gadarwara=no work (no electrification Sign)
Salichoka= no poles, hole work completed
Bankhedi= no poles, hole work completed
Pipariya= poles established, wiring work is in progress
Sohagpur= pole work under progress
Guramkhedi= work completed
Bagratawa= pole work under progress
Sontalai= pole work under progress
Gurra= work completed
TSS work is also running with full speed.
I think , may be that news will become true, that from JAN 2017, E-Locos will there between PPI-ET.

12 posts - Thu Dec 15, 2016

  
4216 views
Dec 15 2016 (11:24)
12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   357 blog posts   7 correct pred (100% accurate)
Re# 2088849-13            Tags   Past Edits
no pblm..
koi b ho...
mumbai se direct narsinghpur e-loco milega.. voi kafi h..

  
Dec 18 2016 (10:14)
rohit04u   31 blog posts
Re# 2088849-14            Tags   Past Edits
This is great news pipariya itarsi will be operational by march 17 atleast and i have seen too that excluding kachhpura jabalpur kachhpura to narsingpur almost completed and narsingpur to gadarawada is also about to get completed by june july 2017 but only the question ❓ mark arrises between gadarawada to pipariya now bcoz the work progress is nill or no work going on why is this happening don't know the reason funds shortage or some technical problem that is unknown railway officials r not updating any information about this section of electrification completely nothing let see what comes up in rail budget now thanks for gud update

  
3725 views
Dec 19 2016 (09:40)
12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   357 blog posts   7 correct pred (100% accurate)
Re# 2088849-15            Tags   Past Edits
what about Jabalpur to Kachhpura?
has work started?

  
3600 views
Dec 19 2016 (11:33)
OHE over JBP~   1032 blog posts   64 correct pred (73% accurate)
Re# 2088849-16            Tags   Past Edits
Nopes

  
1463 views
Jan 28 2017 (13:39)
nsahu0201~   585 blog posts   43 correct pred (83% accurate)
Re# 2088849-17            Tags   Past Edits
kya ET-JBP section me KARELI GADARWADA NARSINGHPUR station k pass kuch block ya kuchh work chal rha h kya ...... Vaha sari train late ho rahi h
  
Rail Fanning
0 Followers
740 views
Jul 09 2012 (18:53)   NU/Narsinghpur (2 PFs)
 

Soumitra Chawathe*^~   30224 blog posts   98197 correct pred (71% accurate)
Entry# 477032            Tags   Past Edits
Courtesy: Nitin Kumar
  
★★★  General Travel
Dec 23 2016 (21:55)   12670/Ganga Kaveri Express | JBP/Jabalpur Junction (6 PFs) | ET/WDP-4B

22193 Bandra Patna HumSafar Express   355 blog posts   5 correct pred (100% accurate)
Entry# 2102196            Tags   Past Edits
#ETALDELECTRIFICATION
In a nutshell, I've closely identified the progress of electrification work between Jabalpur and Itarsi. The details are given below.
1. Jabalpur (excl.)-Narsinghpur work is almost done. Wiring is complete. Work left is only on the two bridges over Narmada river. I think they are deciding to electrify KEQ-JBP at the end. Pic is given in my trip blog.
2. The pic
...
more...
no. 1 & 2 gives the good news we all have been waiting for. The final section i.e, Kareli-Pipariya work has started. Holes have been dug from Gardarwara till Pipariya. You can see works-man digging holes for poles. Soon they'll reach Kareli.
3. Pipariya station is completely under wires now. Pics 3,4,5 shows the status. Wiring from PPI-BGRT is done. At few poles it is to be tightened. I've seen works-man tighten the wires, but due to immense speed of the train (thanks to ET shed monster WDP4b :p ) i couldn't capture those instants. Pics- 8,9 shows BRGT station status.
4. The only single line section of ET-ALD route i.e, BRGT-SQL has also begun to come under wires. Poles and wires are installed and only tightening needs to be done. Pics 9,10,11 are evident. Even bridge over TAWA river is getting poles to be installed.
5. The section after SQL is completed. Only tightening of wires is left at 4-5 poles.
Work is going on at decent pace. CORE is all set to trail the electrified section of ET-PPI in January and is working on that. I hope that was useful :)

16 posts - Mon Dec 26, 2016

  
5077 views
Dec 26 2016 (12:58)
2017Year of hopes for JBP~   3152 blog posts   44 correct pred (50% accurate)
Re# 2102196-18            Tags   Past Edits
yes work of doubling also started b/w BGTA-Sontalai as i have spotted the ongoing work after sontalai as trees is being cutted and i think only before tawa bridge the new line will be diverting or else i think the more space which is there in the old bridge will be used to lay new line and before tunnel it will be divertd to avoid new tunnel construction so its good to see work of doubling started from sontalai end

  
3921 views
Jan 04 2017 (23:17)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-19            Tags   Past Edits
Jbp katni electrification work 70percent kam ho gaya hai sihora station k pas dumping yard hai jaha electrification mai lagney wala saman rakha hai

  
3874 views
Jan 04 2017 (23:42)
Mohammad Sharique Siddiqui   31 blog posts
Re# 2102196-20            Tags   Past Edits
Very happy to see that the work is restarted hope it finishes soon

  
3773 views
Jan 05 2017 (00:11)
22193 Bandra Patna HumSafar Express   355 blog posts   5 correct pred (100% accurate)
Re# 2102196-21            Tags   Past Edits
70% ho gya?

  
3823 views
Jan 05 2017 (00:25)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-22            Tags   Past Edits
Yes bro aj hi dayodaya express sey jaipur se lauta hu tab mainey dekha hai70na sahi par 60percent to done hai
  
★★  General Travel
0 Followers
5401 views
Oct 08 2016 (19:38)   22187/Bhopal Habibganj - Jabalpur Intercity Express | NU/Narsinghpur (2 PFs) | ET/WDP-4D
 

OHE over JBP~   1032 blog posts   64 correct pred (73% accurate)
Entry# 2016688            Tags   Past Edits
#ETALDELECTRIFICATION
Great news guys, work in NU-PPI section has started from both ends. From NU side, the poles with clamping material is installed till KY & from PPI side till SCKR. Pics I've attached are of NU & SRID.

3 posts - Sat Oct 08, 2016

  
4683 views
Oct 08 2016 (21:20)
OHE over JBP~   1032 blog posts   64 correct pred (73% accurate)
Re# 2016688-4            Tags   Past Edits
NU

  
4523 views
Oct 09 2016 (19:33)
2017Year of hopes for JBP~   3152 blog posts   44 correct pred (50% accurate)
Re# 2016688-5            Tags   Past Edits
Nice pics and what is ur assumption ki kb tak et-jbp k bich kaam pura ho jayga

  
4488 views
Oct 10 2016 (00:35)
Mohammad Sharique Siddiqui   31 blog posts
Re# 2016688-6            Tags   Past Edits
This section can be operational not before Nov 17

  
Oct 10 2016 (00:39)
OHE over JBP~   1032 blog posts   64 correct pred (73% accurate)
Re# 2016688-7            Tags   Past Edits
Work for building TSS has started in NU,BGTA & BHTN. This will take approx. 1 year. Further, JBP-NU section is complete in terms of OHE over tracks. ET-PPI is still under progress for constructing OHE mast at stations. Compiling all these points, maybe the track will be ready to serve electric traction by August-17. Combining CRS & other issues, we can expect electric traction by December 2017 :)

  
4325 views
Oct 10 2016 (01:01)
OHE over JBP~   1032 blog posts   64 correct pred (73% accurate)
Re# 2016688-8            Tags   Past Edits
One pic from SRID where OHE is installed.
  
★  General Travel
0 Followers
4311 views
Nov 02 2016 (12:43)   12577/Bagmati Express | NU/Narsinghpur (2 PFs) | ET/WDM-3A/11322
 

12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   357 blog posts   7 correct pred (100% accurate)
Entry# 2045287            Tags   Past Edits
Twin wdm loco with Bagmati Exp arriving at pf 2

  
4170 views
Nov 02 2016 (12:47)
WELCOME JBP ET OHE OMG 😲 AGAIN~   10632 blog posts   14 correct pred (46% accurate)
Re# 2045287-1            Tags   Past Edits
Add #etaldelectrification
Ohe wires b lg gyi h ya bs poles

  
3693 views
Nov 02 2016 (12:50)
12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   357 blog posts   7 correct pred (100% accurate)
Re# 2045287-2            Tags   Past Edits
Sirf pole h abi
Kareli outer tk pole lg gye h...
  
★★  Rail Fanning
0 Followers
2706 views
Jul 03 2016 (14:14)   12192/Shridham SF Express (PT) | NU/Narsinghpur (2 PFs) | ET/WDM-3D
 

ET™~   2169 blog posts   34 correct pred (80% accurate)
Entry# 1916208            Tags   Past Edits
new delhi bound Shridham express @ghatpindrai near narsinghpur
  
★★★  Rail Fanning
0 Followers
4002 views
Oct 16 2015 (15:23)   12187/Jabalpur - Mumbai CST Garib Rath Express | NU/Narsinghpur (2 PFs)
 

Surat Mumbai Tejas Soon*^~   30366 blog posts   67731 correct pred (81% accurate)
Entry# 1619025            Tags   Past Edits
Speedometer of G7 in 12187 Garibrath
.
Speedometer of G7 Coach of 12187 Jabalpur Mumbai CSTM Garibrath Express
.
Speed showing 104 KMPH approxx 52 KM before Narsinghpur
.
...
more...

  
Oct 16 2015 (16:24)
Shivam~   3683 blog posts   1074 correct pred (87% accurate)
Re# 1619025-1            Tags   Past Edits
Made for railfans :p

  
★  
Oct 16 2015 (17:11)
Surat Mumbai Tejas Soon*^~   30366 blog posts   67731 correct pred (81% accurate)
Re# 1619025-2            Tags   Past Edits
no one interested watch it when we capturing it some pax looking at us like we are some terrorist

  
3009 views
Oct 24 2015 (16:07)
So Paddy Got Up~   2718 blog posts   1236 correct pred (71% accurate)
Re# 1619025-3            Tags   Past Edits
using camera for capturing trains outside, or the coach inside evokes similar response :D

  
2819 views
Oct 24 2015 (17:30)
Surat Mumbai Tejas Soon*^~   30366 blog posts   67731 correct pred (81% accurate)
Re# 1619025-4            Tags   Past Edits
if u open CAM at Station then every one look at u just like " yeh kaisa aadmi hai Train ka fotu le raha hai " :P
  
★★  Rail Fanning
0 Followers
6900 views
Mar 17 2016 (22:33)   51189/Itarsi - Chheoki Passenger (UnReserved) | NU/Narsinghpur (2 PFs) | KTE/WDM-2/16771
 

Nitin Kumar~   2463 blog posts   303 correct pred (66% accurate)
Entry# 1770635            Tags   Past Edits
51189 Itarsi Allahabad Passenger (UnReserved) with KTE Alco Twins 16771+16772 at Narsinghpur Railway Station :)

  
5715 views
Mar 19 2016 (18:27)
Jayashree ❖ Amita*^   12018 blog posts   98316 correct pred (77% accurate)
Re# 1770635-1            Tags   Past Edits

  
6170 views
Mar 20 2016 (00:10)
GZB WAP7 30211 WITH GD sf AT GORAKHPUR JN~   5151 blog posts   10 correct pred (50% accurate)
Re# 1770635-2            Tags   Past Edits
Nice...............
Page#    Showing 1 to 10 of 27 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site