Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jun 27, 2017 02:26:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jun 27, 2017 02:26:30 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 797341-0
Details Edit
Large Station Board;
Entry# 1531904-0
Details Edit
Large Station Board;
Entry# 2117286-0
Details Edit
Large Station Board;
Entry# 2117286-0

NFK/New Farakka Junction (3 PFs)
নিউ ফরাক্কা জংশন     न्यू फरक्का जंक्शन

Track: Construction - Doubling+Electrification

NH 34, Farakka, Dist - Murshidabad
State: West Bengal

Elevation: 30 m above sea level
Zone: ER/Eastern   Division: Malda Town
No Recent News for NFK/New Farakka Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 3
Number of Halting Trains: 83
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 4.2/5 (16 votes)
cleanliness - excellent (2)
porters/escalators - average (2)
food - good (2)
transportation - excellent (2)
lodging - good (2)
railfanning - good (2)
sightseeing - excellent (2)
safety - excellent (2)

Nearby Stations

TDLE/Tildanga 5 km     BQZ/Ballalpur 5 km     CMX/Chamagram 6 km     BDBS/Bindubasini 9 km     SXP/Sankopara 10 km     BDAG/Bonidanga 13 km     KTJ/Khaltipur 14 km     DGLE/Dhulian Ganga 15 km     GMAN/Gumani 16 km     HSM/Hausnagar 18 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 65 blog entries  next>>
  
★★★  General Travel
1 Followers
1871 views
Jun 06 2017 (19:46)   13012/Malda Town - Howrah Intercity Express | BHP/Bolpur Shantiniketan (3 PFs) | ET/WDP-4B/40048

debarathi mandal   4807 blog posts   11442 correct pred (88% accurate)
Entry# 2309660            Tags   Past Edits
#mega offlink
13012 Malda Town - Howrah Intercity Express via Rampurhat with superb offlink ET( Etarsi) WDP-4B #40048
Location:- Bolpur Santiniketan ( BHP) , SBG Loop, ER
Date:-06/06/2017
  
★  Rail Fanning
0 Followers
3212 views
Feb 12 2017 (12:43)   25657/Kanchanjunga Express | NFK/New Farakka Junction (3 PFs)

Avishek Ray~   82 blog posts
Entry# 2161286            Tags   Past Edits
Kanchanjunga Express carving into Farakka Barrage.

  
2418 views
Mar 08 2017 (00:28)
Ashutosh Singh   58 blog posts
Re# 2161286-1            Tags   Past Edits
No sign of electrification here

  
2221 views
Mar 11 2017 (10:36)
Avishek Ray~   82 blog posts
Re# 2161286-2            Tags   Past Edits
Wiring is done till Pakur.

  
748 views
May 25 2017 (19:42)
Ashutosh Singh   58 blog posts
Re# 2161286-3            Tags   Past Edits
Yes uptill PKR it's commissioned any news for PKR-MLDT. it's the only missing link between HWH-KIR now.

  
702 views
May 25 2017 (23:19)
Avishek Ray~   82 blog posts
Re# 2161286-4            Tags   Past Edits
Sorry, no idea. MLDT based RF's can better confirm.

  
356 views
Jun 07 2017 (21:44)
Ashutosh Singh   58 blog posts
Re# 2161286-5            Tags   Past Edits
Any MLDT based rail fan or somebody who has recently travelled in this stretch inform us about the electrification status between PKR -NFK-MLDT.
What I know is there is no sign of electrification at MLDT station and what's happening between the route update it if somebody has the knowledge.
  
★★★  General Travel
0 Followers
8422 views
Apr 27 2017 (03:15)   14055/Brahmaputra Mail (PT) | DBRG/Dibrugarh (4 PFs) | SGUJ/WDG-4D/70647

mksald123   565 blog posts   7 correct pred (58% accurate)
Entry# 2252182            Tags   Past Edits
Brahmaputra mail arrived GHY at 1245 hrs and departed at 1302 hrs by SGUJ WDG 4D 70647 on 26.04.17

6 posts - Thu Apr 27, 2017

1 posts - Fri Apr 28, 2017

  
7210 views
Apr 28 2017 (09:12)
mksald123   565 blog posts   7 correct pred (58% accurate)
Re# 2252182-9            Tags   Past Edits
First time Brahmaputra Mail 14055 enters Platform 1 of Ald just after LHB Purushottam departed.
The credit goes to first ER who is completely following RM remarks, not to delay trains and the completing sahibganj loop is helping in this.
Second ECR who rcvd it right time at Kiul and only delayed it 40 minutes till MGS arrival
The Purushottam and Brahmaputra entered MGS
...
more...
same time but as Purushottam was right time, a superfast and LHBfied so it was left before from MGS.
Third NCR who gave the trains nice priority and the two riders entered the station after a huge long time, without humiliating stops and crawling run from Naini to Ald and at outer.
Great Day.
Everyone likes his her own child more than others.
So what happens is when trains get late, in one of busiest section like naini ald, Purushottam, Mahabodhi, Rewa, Brahmaputra etc all line up at Naini.
As prayagraj is own child of my zone and it starts from ald so it is made stand at PL1 from 2030 hrs, 01 hour before scheduled departure.
platform 2-6 also remain busy by down and other up trains.
So above mentioned trains if reach Naini after 2030 hrs, they generally enters ald at 2130 hrs crawling 1 hour from Naini to outer.

  
7200 views
Apr 28 2017 (18:04)
Baadshaho~   73 blog posts
Re# 2252182-10            Tags   Past Edits
This jamalpur tunnel doubling work project is 6-7 years old project.another tunnel was to be made for doubling process between jamalpur ana ratanpur.now the 2nd jmp tunnel might be ready by end of 2018 according to DRM malda .

  
7190 views
Apr 28 2017 (18:07)
Baadshaho~   73 blog posts
Re# 2252182-11            Tags   Past Edits
That third line is constructed between barh and bakhtiyarpur for coal linkage to Ntpc barh.

  
6760 views
Apr 30 2017 (03:34)
mksald123   565 blog posts   7 correct pred (58% accurate)
Re# 2252182-12            Tags   Past Edits
But as per speed, looking difficult.

  
6886 views
Apr 30 2017 (03:38)
mksald123   565 blog posts   7 correct pred (58% accurate)
Re# 2252182-13            Tags   Past Edits
But old projects are also mentioned in pink book.
All projects started, running and finished is mentioned in pink book, till the time account is closed in book (each rupee is paid or 100% payment done to company/ agency)
  
Info Update
0 Followers
5161 views
Jan 08 2017 (16:23)   12509/Bengaluru Cantt. - Guwahati (Kaziranga) Express (PT) | NFK/New Farakka Junction (3 PFs)

nump421~   1081 blog posts   1084 correct pred (90% accurate)
Entry# 2120226            Tags   Past Edits
Pls update stoppage at NFK for 12509

  
4989 views
Jan 08 2017 (16:43)
ANUBHARADWAJ MAHARSHI   2113 blog posts   108 correct pred (63% accurate)
Re# 2120226-1            Tags   Past Edits
Not shown in IRCTC

  
4908 views
Jan 09 2017 (07:51)
nump421~   1081 blog posts   1084 correct pred (90% accurate)
Re# 2120226-2            Tags   Past Edits
Train stopping with an official stoppage is not enough proof, being told by a localite who boards the train regularly from the said stoppage and has attached the proof for the same?

  
4881 views
Jan 09 2017 (08:06)
ANUBHARADWAJ MAHARSHI   2113 blog posts   108 correct pred (63% accurate)
Re# 2120226-4            Tags   Past Edits
TIMETABLE updated thanks
  
Pic Upload
0 Followers
1386 views
Jan 05 2017 (23:15)   NFK/New Farakka Junction (3 PFs)

MirzaRa1~   567 blog posts   463 correct pred (76% accurate)
Entry# 2117286            Tags   Past Edits
NFK/New Farakka Junction
Page#    Showing 1 to 5 of 65 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.